Substructure rates
- Items
- 54
- Lowest rate
- ₹3.30
- Highest rate
- ₹1,16,387.08
- Effective from
- 2024-08-14
Substructure rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹3.30 to ₹1,16,387.08. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.
54 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 13.1 | Brick masonry work in cement mortar 1:3 (One cement and three fine aggregate) in substructure complete excluding pointing and plastering, as per drawing and technical specification- including the cost of labour, material and formwork | Cum | 11,066.56 |
| 13.2 | Pointing with cement mortar 1:3 (one cement and three fine aggregate) on brick work in substructure as per technical specification-including the cost of labour, material | Sqm | 172.17 |
| 13.3 | Plastering with cement mortar 1:3 (one cement and three fine aggregate) on brick work in substructure as per Technical specifications-including the cost of labour and material | Sqm | 268.23 |
| 13.4A | Stone masonry work in cement mortar 1:3 (one cement and three fine aggregate) for substructure complete as per drawing and technical specifications) - Random rubble masonry- including the cost of labour, material and formwork | Cum | 8,257.89 |
| 13.4B | Stone masonry work in cement mortar 1:3 (one cement and three fine aggregate) for substructure complete complete as per drawing and technical specifications) - Coursed rubble masonry (first sort)-including the cost of labour, material and formwork | Cum | 9,050.98 |
| 13.4C | Stone masonry work in cement mortar 1:3 (one cement and three fine aggregate) for substructure complete complete as per drawing and technical specifications) - Ashlar masonry (first sort)-including the cost of labour,material and formwork | Cum | 12,414.99 |
| 13.5A | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M15 with a minimum cement content 275 kg / cum upto 5 metre height-including the cost of labour, material, machinery and formwork | Cum | 8,179.81 |
| 13.5B | Plaing Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M20 with a minimum cement content 344 kg / cum upto 5 metre height- including the cost of labour,material,machinery and formwork | Cum | 8,820.79 |
| 13.6 | Supplying, fitting and placing Thermo Mechanical Treated bars reinforcement in substructure complete as per drawing and technical specifications | Tonne | 1,16,387.08 |
| 13.6B | Providing and placing M30 grade cover block for RCC works | Nos | 3.30 |
| 13.7 | Supplying, fitting and placing mild steel reinforcement complete in substructure as per drawing and technical specifications including material and labour for straightening, cutting,bending, shifting to site,tying and placing in position | Tonne | 1,14,379.14 |
| 13.8 | Providing weep holes in brick masonry /plain/reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications | Nos | 222.25 |
| 13.9 | Providing weep holes in brick masonry / plain / reinforced concrete abutment, wing wall / return wall with 110 mm dia PVC pipe, 6kg/sq.cm extending through the full width of the structure with slope of 1V:20H towards drawing foce.Complete as per drawing and technical specifications | Metre | 539.43 |
| 13.10 | Providing and laying of filter media with granular materials / stone crushed aggregates satisfying the requirements laid down Clause 2504.2.2. of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specifications | Cum | 3,002.84 |
| 13.11.1 | Providing and fixing tapered / parallel threaded couplers conforming to IS code on " Reinforcement Couplers for Mechanical Splices of Bars fpr Concrete Reinforcement Specifications", to reinforcement bars including threading, enlargement at connections by forging, protecting the prepared reinforcement bars and related operations as reqyuired to complete the works. (The length of the bars in which coupler is to be provided should not be less than 4 metre, no deduction for labour and binding wire saved for not providing lap length shall be made) - Coupler for 16 mm diametre reinforcement bar | Nos | 193.90 |
| 13.5C.1.1 | Plaing Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M25 with a minimum cement content 399 kg / cum upto 5 metre height- Using concrete mixer(Formwork-10%) | Cum | 9,337.32 |
| 13.5D.1.1 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M30 with a minimum cement content 405 kg / cum upto 5m height - using concrete mixer (Formwork-10%) | Cum | 9,393.32 |
| 13.5E.1.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M20 with a minimum cement content 347 kg / cum up to 5m height - Using concrete mixer | Cum | 8,851.91 |
| 13.5F.1.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M25 with a minimum cement content 403 kg / cum for upto height 5m - Using concrete mixer | Cum | 9,374.67 |
| 13.5G.1.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum upto 5m height - Using concrete mixer (Formwork-10%) | Cum | 9,405.78 |
| 13.5H.1.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M35 with a minimum cement content 422 kg / cum for height upto 5m - Using concrete mixer (Formwork-10%) | Cum | 9,548.89 |
| 13.5C.1.2 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M25 with a minimum cement content 400 kg / cum up to 5m height- Using batching plant(Formwork-10%) | Cum | 7,574.91 |
| 13.5D.1.2 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M30 with a minimum cement content 405 kg / cum upto 5m height- Using batching plant (Formwork-10%) | Cum | 7,651.62 |
| 13.5E.1.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M20 with a minimum cement content 347 kg / cum up to 5m height - Using batching plant | Cum | 7,085.61 |
| 13.5F.1.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M25 with a minimum cement content 403 kg / cum for upto height 5m - Using batching plant | Cum | 7,608.37 |
| 13.5G.1.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum upto 5m height - Using batching plant (Formwork-10%) | Cum | 7,641.02 |
| 13.5H.1.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M35 with a minimum cement content 422 kg / cum for height upto 5m - Using batching plant (Formwork-10%) | Cum | 7,784.16 |
| 13.11.2 | Providing and fixing tapered / parallel threaded couplers conforming to IS code on " Reinforcement Couplers for Mechanical Splices of Bars fpr Concrete Reinforcement Specifications", to reinforcement bars including threading, enlargement at connections by forging, protecting the prepared reinforcement bars and related operations as reqyuired to complete the works. (The length of the bars in which coupler is to be provided should not be less than 4 metre, no deduction for labour and binding wire saved for not providing lap length shall be made) - Coupler for 20 mm diametre reinforcement bar | Nos | 260.47 |
| 13.5C.2.1 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M25 with a minimum cement content 399 kg / cum - For height above 5m height and upto 10m - Using concrete mixer (Form work 12% + Extra lift 2%) | Cum | 9,676.84 |
| 13.5D.2.1 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M30 with a minimum cement content 405 kg / cum for height above 5m and upto 10m using concrete mixer (Formwork 12% + Extra lift 2%) | Cum | 9,734.90 |
| 13.5E.2.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M20 with a minimum cement content 347 kg / cum for height above 5m and upto 10m -Using concrete mixer (Form work 12% + Extra lift 2%) | Cum | 9,173.81 |
| 13.5F.2.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M25 with a minimum cement content 403 kg / cum for height above 5m and upto 10m height - Using concrete mixer (Form work 11.8% + Extra lift 1.8%) | Cum | 9,681.47 |
| 13.5G.2.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum for height above 5m and upto 10m height - Using concrete mixer (Form work 11.5% + Extra lift 1.6%) | Cum | 9,670.83 |
| 13.5H.2.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M35 with a minimum cement content 422 kg / cum for height above 5m and upto 10m - Using concrete mixer (Form work 11% + Extra lift 1.4%) | Cum | 9,757.25 |
| 13.5C.2.2 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M25 with a minimum cement content 400 kg / cum for height above 5m and upto 10m using batching plant (Form work 12% + Extra lift 2%) | Cum | 7,850.37 |
| 13.5D.2.2 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M30 with a minimum cement content 405 kg / cum For height above 5m and upto 10m height using batching plant (Form work 12% + Extra lift 2%) | Cum | 7,929.86 |
| 13.5E.2.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M20 with a minimum cement content 347 kg / cum for height above 5m and upto 10m -Using batching plant (Form work 12% + Extra lift 2%) | Cum | 7,343.29 |
| 13.5F.2.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M25 with a minimum cement content 403 kg / cum for height above 5m and upto 10m height - Using batching plant (Form work 11.8% + Extra lift 1.8) | Cum | 7,857.37 |
| 13.5G.2.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum for height above 5m and upto 10m height - Using batching plant (Form work 11.5% + Extra lift 1.6%) | Cum | 9,670.83 |
| 13.5H.2.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M35 with a minimum cement content 422 kg / cum for height above 5m and upto 10m - Using batching plant (Form work 11% + Extra lift 1.4%) | Cum | 7,954.00 |
| 13.11.3 | Providing and fixing tapered / parallel threaded couplers conforming to IS code on " Reinforcement Couplers for Mechanical Splices of Bars fpr Concrete Reinforcement Specifications", to reinforcement bars including threading, enlargement at connections by forging, protecting the prepared reinforcement bars and related operations as reqyuired to complete the works. (The length of the bars in which coupler is to be provided should not be less than 4 metre, no deduction for labour and binding wire saved for not providing lap length shall be made) - Coupler for 25 mm diametre reinforcement bar | Nos | 368.89 |
| 13.5C.3.1 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M25 with a minimum cement content 399 kg / cum for height above 10m using concrete mixer (Form work 15% + Extra lift 4%) | Cum | 10,101.27 |
| 13.5D.3.1 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M30 with a minimum cement content 405 kg / cum for height above 10m -Using concrete mixer (Form work 15% + Extra lift 4%) | Cum | 10,161.87 |
| 13.5E.3.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M20 with a minimum cement content 347 kg / cum for height above 10m - Using concrete mixer (Form work 15% + Extra lift 4%) | Cum | 9,576.16 |
| 13.5F.3.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M25 with a minimum cement content 405 kg / cum for height above 10m - Using concrete mixer (Form work 15% + Extra lift 4%) | Cum | 10,161.87 |
| 13.5G.3.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum for height above 10m - Using concrete mixer (Form work 14% + Extra lift 3.5%) | Cum | 10,047.06 |
| 13.5H.3.1 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M35 with a minimum cement content 422 kg / cum for height above 10m - Using concrete mixer (Form work 13% + Extra lift 3%) | Cum | 10,069.74 |
| 13.5C.3.2 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M25 with a minimum cement content 400 kg / cum for height above 10m using batching plant (Form work 15% + Extra lift 4%) | Cum | 8,194.68 |
| 13.5D.3.2 | Plain Cement Concrete in substructure complete as per drawing and technical specification - PCC Grade M30 with a minimum cement content 405 kg / cum for height above 10m -Using batching plant (Form work 15% + Extra lift 4%) | Cum | 8,277.66 |
| 13.5E.3.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M20 with a minimum cement content 347 kg / cum for height above 10m - Using batching plant (Form work 15% + Extra lift 4%) | Cum | 7,665.35 |
| 13.5F.3.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M25 with a minimum cement content 403 kg / cum for height above 10m - Using batching plant (Form work 15% + Extra lift 4%) | Cum | 8,230.86 |
| 13.5G.3.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum for height above 10m - Using batching plant (Form work 14% + Extra lift 3.5%) | Cum | 8,162.00 |
| 13.5H.3.2 | Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M35 with a minimum cement content 422 kg / cum for height above 10m - Using batching plant (Form work 13% + Extra lift 3%) | Cum | 8,208.74 |
| 13.11.5 | Providing and fixing tapered / parallel threaded couplers conforming to IS code on " Reinforcement Couplers for Mechanical Splices of Bars fpr Concrete Reinforcement Specifications", to reinforcement bars including threading, enlargement at connections by forging, protecting the prepared reinforcement bars and related operations as reqyuired to complete the works. (The length of the bars in which coupler is to be provided should not be less than 4 metre, no deduction for labour and binding wire saved for not providing lap length shall be made) - Coupler for 32 mm diametre reinforcement bar | Nos | 613.70 |
- ISSUED BY
- Puducherry PWD
- EFFECTIVE
- 2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Earth Work70
- Concrete Work72
- Reinforced Concrete Work131
- Brick Work57
- Stone Work50
- Cladding Work71
- Wood and PVC Work493
- Steel Work52
- Flooring91
- Roofing135
- Finishing114
- Repairs To Buildings108
SHOW ALL 44 CHAPTERS
- Dismantling And Demolishing85
- Miscellaneous Building Work25
- Sanitary Installations226
- Water Supply708
- Drainage135
- Pile Work31
- Aluminium Work41
- Water Proofing27
- Rain Water Harvesting & TubeWells37
- Conservation of Heritage Buildings7
- Structural Glazing Aluminium Composite Panel5
- New Technologies and Materials196
- Irrigation50
- Water Supply (Public Health)1012
- Sewerage (Public Health)213
- Miscellaneous (Public Health)71
- OHT (Works)8
- Subsoil Exploration7
- Energy Conservation Building Code137
- Site Clearance and Dismantling44
- Earth Work, Erosion Control and Drainages40
- Granular Sub-base63
- Base & Bituminous Construction26
- Traffic Signs,Markings & Other Road Appurtenances41
- Pipe Culverts5
- Maintenance of Roads13
- Horticulture25
- Foundation106
- Superstructure97
- River Training and Protection Works10
- Repair and Rehabilitation12
- PMGSY -Works25
Pricing substructure against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.