10 river training and protection works items from the Puducherry PWD, effective 2024-08-14.
River Training and Protection Works rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹3,048.96 to ₹9,002.16. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.
10 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 15.1 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and technical specifications- Boulder laid dry without wire crates | Cum | 3,048.96 |
| 15.2 | Providing and laying of boulder apron laid in wire crates made with 4 mm dia GI wire conforming to IS:280 & IS 4826 in 100 mm x 100 mm mesh (weaved diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 40 kg each-Boulder apron laid in wire crates | Cum | 3,920.39 |
| 15.3 | Providing and laying of apron with cement concrete blocks of size 0.5x0.5x0.5 m cast-in-situ and made with nominal mix of M15 grade cement concrete with a minimum cement content of 250kg/cum as per IRC:21-2000 (add 2 percent of cost to account for excavation for preparation of bed,nominal surface reinforcement and filling of granular material in recesses between blocks) | Cum | 7,584.92 |
| 15.4A | Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications - stone | Cum | 3,048.96 |
| 15.4B | Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications - Cement concrete blocks of size 0.3 x 0.3 x 0.3 m cast in cement concrete of grade M15 (add 2 percent of cost to account for excavation for preparation of bed,nominal surface reinforcement and filling of granular material in recesses between blocks) | Cum | 7,584.92 |
| 15.5 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications | Cum | 3,579.75 |
| 15.9 | Construction of dry rubble flooring at cross drainage works for relatively less important works (including triming and preparation of base) | Cum | 4,338.66 |
| 15.10A | Curtain wall complete as per drawing and technical specifications - Stone masonry in cement mortar 1:3 | Cum | 9,002.16 |
| 15.10B | Curtain wall complete as per drawing and technical specifications - cement concrete grade M15 | Cum | 7,436.20 |
| 15.11 | Flexible apron: Construction of flexible apron 1m thick comprising of loose stone boulders weighing not less than 40kg beyond curtain wall (including trimming and preparation of bed) | Cum | 3,237.38 |
Other chapters in this schedule
- Earth Work (70)
- Concrete Work (72)
- Reinforced Concrete Work (131)
- Brick Work (57)
- Stone Work (50)
- Cladding Work (71)
- Wood and PVC Work (493)
- Steel Work (52)
- Flooring (91)
- Roofing (135)
- Finishing (114)
- Repairs To Buildings (108)
- Dismantling And Demolishing (85)
- Miscellaneous Building Work (25)
- Sanitary Installations (226)
- Water Supply (708)
- Drainage (135)
- Pile Work (31)
- Aluminium Work (41)
- Water Proofing (27)
- Rain Water Harvesting & TubeWells (37)
- Conservation of Heritage Buildings (7)
- Structural Glazing Aluminium Composite Panel (5)
- New Technologies and Materials (196)
- Irrigation (50)
- Water Supply (Public Health) (1012)
- Sewerage (Public Health) (213)
- Miscellaneous (Public Health) (71)
- OHT (Works) (8)
- Subsoil Exploration (7)
- Energy Conservation Building Code (137)
- Site Clearance and Dismantling (44)
- Earth Work, Erosion Control and Drainages (40)
- Granular Sub-base (63)
- Base & Bituminous Construction (26)
- Traffic Signs,Markings & Other Road Appurtenances (41)
- Pipe Culverts (5)
- Maintenance of Roads (13)
- Horticulture (25)
- Foundation (106)
- Substructure (54)
- Superstructure (97)
- Repair and Rehabilitation (12)
- PMGSY -Works (25)
Pricing river training and protection works against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works