Conservation of Heritage Buildings rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹70.61 to ₹348.50. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.
7 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 24.1 | Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for re- pointing / refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead | Sqm | 70.61 |
| 24.2 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building / structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S.tube, placed 1.5 metre centre to centre,horizontal & vertical tubes joint with cup & lock system with M.S.Tubes, M.S.Tube Challis, M.S.Clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per direction of Engineer-in-charges Note:(1) The elevational area of the scaffolding shall be measured for payment purpose.(2) The payment will be made once only for execution of all items for such works | Sqm | 338.25 |
| 24.3 | Cleaning the sand stone surface and removing dirt, dust, bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc., including providing,applying and washing the surface with liquid ammonia chemical of 5% solution and other chemical cleaning agent as approved by archaeological survey of india of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine opperated water jet mixed with desired quantity of fine silica where ever required, without causing any scratching / damage to the stone surface and finally washing the surface with clean water with the help of pressure jet machine, complete in all respect, including taking all precautions to safeguard ventilators, windows, doors etc. by suitable covering so as to avoid any damage to the building / structure, all as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 205.25 |
| 24.4 | Providing and applying antifungal wash treatment using 3% solution of sodium pentachlorophenate, of reputed brand and manufacturer, on cleaned sand stone surface at desired locations as per direction of Engineer-in-charge (The rate is inclusive of all materials and labours involved except scaffolding) | Sqm | 75.65 |
| 24.5 | Ruled / Flush pointing on red sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 (one lime: 1.5 surki (50% red and 50% light yellow surki): 1/2 marble dust). (The rate is inclusive of all materials & laboures involved except scaffolding) | Sqm | 348.50 |
| 24.6 | Ruled / Flush pointing on white sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 (one lime: 1.5 surkhi (15% dark red and 85% light yellow surkhi): 1/2 marble dust). (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 348.50 |
| 24.8 | Applying breathable, non -reactive, antifungal, and water repellant Silane / Siloxane chemical as approved by archaeological survey of india, of approved brand and manufacture, diluted with solvent mineral turpentine oil in the ratio of 1:12 (One part of approved chemical: 12 part of turpentaine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 93.82 |
- ISSUED BY
- Puducherry PWD
- EFFECTIVE
- 2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Earth Work70
- Concrete Work72
- Reinforced Concrete Work131
- Brick Work57
- Stone Work50
- Cladding Work71
- Wood and PVC Work493
- Steel Work52
- Flooring91
- Roofing135
- Finishing114
- Repairs To Buildings108
SHOW ALL 44 CHAPTERS
- Dismantling And Demolishing85
- Miscellaneous Building Work25
- Sanitary Installations226
- Water Supply708
- Drainage135
- Pile Work31
- Aluminium Work41
- Water Proofing27
- Rain Water Harvesting & TubeWells37
- Structural Glazing Aluminium Composite Panel5
- New Technologies and Materials196
- Irrigation50
- Water Supply (Public Health)1012
- Sewerage (Public Health)213
- Miscellaneous (Public Health)71
- OHT (Works)8
- Subsoil Exploration7
- Energy Conservation Building Code137
- Site Clearance and Dismantling44
- Earth Work, Erosion Control and Drainages40
- Granular Sub-base63
- Base & Bituminous Construction26
- Traffic Signs,Markings & Other Road Appurtenances41
- Pipe Culverts5
- Maintenance of Roads13
- Horticulture25
- Foundation106
- Substructure54
- Superstructure97
- River Training and Protection Works10
- Repair and Rehabilitation12
- PMGSY -Works25
Pricing conservation of heritage buildings against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.