Site Clearance and Dismantling rates

44 site clearance and dismantling items from the Puducherry PWD, effective 2024-08-14.

Site Clearance and Dismantling rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹3.85 to ₹2,20,455.15. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.

44 items — scroll the table to browse

DescriptionUnit
2.3.1AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness - by manual means in area of light jungleHectare1,65,161.06
2.3.2BClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness - by manual means in area of thorny jungleHectare2,20,455.15
2.3.2CClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness - by mechanical means in area of light jungleHectare28,700.65
2.3.2DClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness - by mechanical means in area of thorny jungleHectare35,867.34
2.4.1ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Lime/Cement Concrete - by manual means (Lime concrete, cement concrete grade M-10 and belowCum956.82
2.4.1BDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Lime/Cement Concrete - by manual means (Cement concrete grade M-15 and M-20)Cum1,176.55
2.4.1CDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Lime/Cement Concrete - by manual means (Prestressed / reinforced cement concrete grade M-20 & above)Cum3,387.98
2.4.1EDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Lime/Cement Concrete - by mechanical means (Cement concrete grade M-15 & M-20)Cum701.38
2.4.1FDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Lime/Cement Concrete - by mechanical means (Prestressed / RCC grade M- 20 and above)Cum3,311.92
2.4.2ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling brick / tile work in lime mortorCum517.35
2.4.2BDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling brick / tile work in cement mortarCum737.09
2.4.2CDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling brick / tile work in mud mortarCum429.46
2.4.2DDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling brick / tile work - dry brick pitching or brick solingCum385.51
2.4.3ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling stone masonry - rubble stone masonry in lime mortarCum605.26
2.4.3BDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling stone masonry - rubble stone masonry in cement mortarCum737.09
2.4.3CDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling stone masonry - rubble stone masonry in mud mortarCum517.35
2.4.3DDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling stone masonry - dry rubble masonryCum473.41
2.4.3EDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling stone masonry - dismantling stone pitching / dry stone spallsCum429.46
2.4.3FDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - dismantling stone masonry - dismantling boulders laid in wire crates including opening of crates and stacking dismantled materialsCum517.35
2.4.4ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - wood work wrought framed and fixed in frames of trusses upto a height of 5m. above plinth levelCum1,424.46
2.4.5ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Steel work in all types of sections upto a height of 5m above plinth level excluding cutting of rivet including dismemberingTonne4,074.99
2.4.5BDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Steel work in all types of sections upto a height of 5m above plinth level excluding cutting of rivet excluding dismemberingTonne3,042.68
2.4.5CDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Steel work in all types of sections upto a height of 5m above plinth level excluding cutting of rivet - Extra for cutting rivetEach29.44
2.4.6ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Scraping of bricks dismantled from brick work including stacking in lime/cement mortarNos3.85
2.4.7ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Scraping of stone from dismantled stone masonry - in cement / lime mortarCum1,542.37
2.4.7BDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Scraping of stone from dismantled stone masonry in mud mortarCum327.48
2.4.8ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Scraping plaster in lime or cement mortar from brick / stone masonrySqm45.10
2.4.9ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Removing all types of Hume pipes and Stacking within a lead of 1000 metres including earthwork and dismantling of Masonry works - upto 600mm diaMetre570.46
2.4.9BDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Removing all types of Hume pipes and Stacking within a lead of 1000 metres including earthwork and dismantling of Masonry works - Above 600mm to 900mm diaMetre771.18
2.4.9CDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m - Removing all types of Hume pipes and Stacking within a lead of 1000 metres including earthwork and dismantling of Masonry works - Above 900mm diaMetre1,320.53
2.5.1ADismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately - by manual means - bituminous coursesCum1,785.03
2.5.1BDismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately - by manual means - Granular coursesCum1,217.66
2.5.2ADismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately - by mechanical means - bituminous coursesCum470.39
2.6Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at disignated locations and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separatelyCum1,575.68
2.7Dismantling guard rails by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 metres, stacking serviceable materials and unserviceable materials separatelyRmt182.83
2.8Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 metreRmt24.11
2.9Dismantling kerb stone channel by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 metresRmt36.17
2.10ADismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit - 5th Kilometre StoneEach983.73
2.10BDismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit - Hectometre stoneEach117.08
2.10CDismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit - Ordinary kilometre stoneEach657.51
2.11Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 metres, stacking serviceable material and unserviceable material separatelyRmt140.90
2.12Dismantling of CI water pipe line 600mm dia including disposal with all lifts and lead upto 1000 metres and stacking of serviceable material and unserviceable material seperately under supervision of department concernedRmt294.74
2.13Removal of cement concrete pipe of sewer gutter 1500mm dia under the supervision of department concerned including disposal with all lifts and upto a lead of 1000 metres and stacking of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry worksRmt339.11
2.14Removal of telephone / electric poles including excavation and dismantling of foundation concrete and lines under the supervision of department concerned, disposal with all lifts and upto a lead of 1000 metres and stacking of serviceable and unserviceable material separatelyEach473.93

Pricing site clearance and dismantling against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.