106 foundation items from the Puducherry PWD, effective 2024-08-14.
Foundation rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹79.82 to ₹1,48,500.31. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.
106 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 12.1.2A | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Ordinary rock (not requireing blasting) - Manual Means - depth upto 3 metres including the cost of labour and overhead charges | Cum | 641.89 |
| 12.1.2B | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Ordinary rock (not requiring blasting)- Mechanical Means - depth upto 3 metres including the cost of labour, hire charge of hydraulic excavator and overhead charges | Cum | 92.17 |
| 12.1.3A | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Hard rock (Requiring Blasting) - Manual Means including the cost of labour, blasting material, detonators, hire charge for air compressor and overhead charges | Cum | 1,388.08 |
| 12.1.4A | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Hard rock (Blasting prohibited) - Mechanical Means - depth upto 3 metres - including the cost of labour, hire charge for air compressor and overhead charges | Cum | 882.59 |
| 12.1.5A | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Marshy soil - Manual Means - upto 3 metres depth - including the cost of labour, hire charge of tractor and overhead charges | Cum | 1,393.32 |
| 12.1.5B | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Marshy soil - Mechanical Means - upto 3 metre depth including the cost of labour, hire charge for tipper, hydraulic excavator and overhead charges | Cum | 302.30 |
| 12.7A | Stone Masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical specifications - Square rubble coursed rubble masonry (First sort) including the cost of labour, material and overhead charges | Cum | 9,002.15 |
| 12.7B | Stone Masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical specifications - Random rubble masonry (coursed / uncoursed) including the cost of labour, material and overhead charges | Cum | 8,595.12 |
| 12.8A | Plain cement concrete in open foundation complete as per drawing and technical specifications - PCC Grade M15 with a minimum cement content of 275 kg / cum including the cost of labour, material hire charge for concrete mixer, electric gen set, form work and overhead charges | Cum | 7,733.64 |
| 12.8B | Plain cement concrete in open foundation complete as per drawing and technical specifications - PCC Grade M20 with a minimum cement content of 344 kg / cum including the cost of labour, material, hire charge for concrete mixer, electric gen set, form work and overhead charges | Cum | 8,339.66 |
| 12.22 | Providing steel liner 10mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing | MT | 1,48,500.31 |
| 12.37A | Pile load test on single vertical pile in accordance with IS:2911 (Part -IV) - Initial and routine load test | MT | 1,152.10 |
| 12.37B | Pile load test on single vertical pile in accordance with IS:2911 (Part -IV) - lateral load test | MT | 1,152.10 |
| 12.39 | Providing and laying of PCC M15 with a minimum cement content of 275 kg / cum levelling course 100mm thick below the pile cap (Using concrete mixer and electric genset) | Cum | 7,436.20 |
| 12.40 | Supplying, fitting and placing uncoated Thermo Mechanical Treated bars reinforcement in foundation complete as per drawing and technical specifications | MT | 1,15,843.94 |
| 12.8C.1 | Reinforced cement concrete in open foundation complete as per drawing and technical specifications - RCC Grade M20 with a minimum cement content 347 kg / cum - Using concrete mixer including the cost of labour, material, hire charge for electric genset, formwork and overhead charges | Cum | 8,369.08 |
| 12.8D.1 | Plain cement concrete in open foundation complete as per drawing and technical specifications - PCC Grade M25 with a minimum cement content of 400 kg / cum - Using Concrete Mixer and electric genset including the cost of labour and material, formwork and overhead charges | Cum | 8,806.79 |
| 12.8E.1 | Reinforced cement concrete in open foundation complete as per drawing and technical specifications - RCC Grade M25 with a minimum cement content of 403 kg / cum - Using Concrete Mixer and electric gen set including the cost of labour, material, form work and overhead charges | Cum | 8,842.00 |
| 12.8F.1 | Plain cement concrete in open foundation complete as per drawing and technical specifications - PCC Grade M30 with a minimum cement content of 405 kg / cum - using Concrete Mixer and electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 8,838.26 |
| 12.8G.1 | Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications - RCC Grade M30 with a minimum cement content of 407 kg / cum - Using Concrete Mixer and electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 8,849.97 |
| 12.8H.1 | Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications - RCC Grade M35 with a minimum cement content of 422 kg / cum - Using Concrete Mixer and electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 8,941.24 |
| 12.22.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 450mm (Using concrete mixer) | Metre | 2,460.96 |
| 12.23.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 750mm (Using concrete mixer) | Metre | 7,236.24 |
| 12.24.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 1000mm (Using concrete mixer) | Metre | 12,150.90 |
| 12.25.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter -1200mm (Using concrete mixer) | Metre | 16,067.67 |
| 12.27.1 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 1000 mm diametre (Using concrete mixer) | Metre | 10,205.72 |
| 12.29.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum R.C.C piles excluding reinforcement complete as per drawing and technical specifications - 500 mm diameter pile (using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of material and machinery | Metre | 3,366.96 |
| 12.31.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - 1000mm diametre pile.(using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery | Metre | 9,398.40 |
| 12.33.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 500 mm x 500 mm (Using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery | Metre | 3,974.51 |
| 12.38A.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M20 with a minimum cement content of 341 kg / cum (Using Concrete mixer and electric genset) including all machineries and formwork | Cum | 8,405.14 |
| 12.38B.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M25 with a minimum cement content of 399 kg / cum -(Using concrete mixer) including all machineries and formwork | Cum | 8,917.02 |
| 12.38C.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M30 with a minimum cement content of 407 kg / cum -(Using concrete mixer)including all machineries and formwork | Cum | 8,981.74 |
| 12.38D.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M35 with a minimum cement content of 422 kg / cum -(Using Concrete mixer) including all machineries and formwork | Cum | 9,117.06 |
| 12.40.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 450mm (Using concrete mixer & Cement SRPC) | Metre | 2,608.45 |
| 12.41.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 750mm (Using concrete mixer & Cement SRPC) | Metre | 7,645.61 |
| 12.42.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 1000mm (Using concrete mixer & Cement SRPC) | Metre | 12,879.06 |
| 12.43.1 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter -1200mm (Using concrete mixer & Cement SRPC) | Metre | 17,115.84 |
| 12.45.1 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 1000 mm diametre (Using concrete mixer & Cement SRPC) | Metre | 10,937.43 |
| 12.46.1 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 1200 mm diametre (Using concrete mixer & Cement SRPC) | Metre | 15,928.62 |
| 12.47.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum R.C.C piles excluding reinforcement complete as per drawing and technical specifications - 500 mm diameter pile (using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of material and machinery.(Using Cement SRPC) | Metre | 3,499.10 |
| 12.48.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - 750mm diameter pile (Using crane, vibrating pile drawing hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of materials and machinery & Cement SRPC) | Metre | 6,054.13 |
| 12.49.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - 1000mm diametre pile.(using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery. (Using Cement SRPC) | Metre | 11,841.30 |
| 12.50.1 | Driven precast vertical M35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 300mm x 300mm.(Using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery. (Using Cement SRPC) | Metre | 2,470.59 |
| 12.51.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 500 mm x 500 mm (Using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery. (Using Cement SRPC) | Metre | 4,142.78 |
| 12.52.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 750 mm x 750mm.(Using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of material and machinery. (Using Cement SRPC) | Metre | 7,612.65 |
| 12.60 | Providing and laying of PCC M15 with a minimum cement content of 275 kg / cum levelling course 100mm thick below the pile cap (Using concrete mixer, electric genset and Cement SRPC) | Cum | 8,045.24 |
| 12.61 | Providing and laying of PCC M15 with a minimum cement content of 275 kg / cum levelling course 100mm thick below the pile cap (Using concrete mixer, electric genset and Portland Slag Cement) | Cum | 7,365.50 |
| 12.59A.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M20 with a minimum cement content of 341 kg / cum (Using Concrete mixer and electric genset) including all machineries and formwork. (Using Cement SRPC) | Cum | 8,836.90 |
| 12.59B.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M25 with a minimum cement content of 399 kg / cum -(Using concrete mixer) including all machineries and formwork. (Using Cement SRPC) | Cum | 9,457.39 |
| 12.59C.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M30 with a minimum cement content of 407 kg / cum -(Using concrete mixer)including all machineries and formwork. (Using Cement SRPC) | Cum | 9,535.85 |
| 12.59D.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M35 with a minimum cement content of 422 kg / cum -(Using Concrete mixer) including all machineries and formwork.(Using Cement SRPC) | Cum | 9,699.88 |
| 12.59A.1.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M20 with a minimum cement content of 341 kg / cum (Using Concrete mixer and electric genset) including all machineries and formwork. Using Portland Slag Cement | Cum | 7,994.22 |
| 12.59B.1.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M25 with a minimum cement content of 399 kg / cum -(Using concrete mixer) including all machineries and formwork. Using Portland Slag Cement | Cum | 8,471.52 |
| 12.59C.1.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M30 with a minimum cement content of 407 kg / cum -(Using concrete mixer)including all machineries and formwork. Using Portland Slag Cement | Cum | 8,531.87 |
| 12.59D.1.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M35 with a minimum cement content of 422 kg / cum -(Using Concrete mixer) including all machineries and formwork. Using Portland Slag Cement | Cum | 8,658.05 |
| 12.8D.2 | Plain cement concrete in open foundation complete as per drawing and technical specifications - PCC Grade M25 with a minimum cement content of 400 kg / cum - With Batching Plant, Transit Mixer and Concrete Pump, front end loader, electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 7,144.52 |
| 12.8E.2 | Reinforced cement concrete in open foundation complete as per drawing and technical specifications - RCC Grade M25 with a minimum cement content of 403 kg / cum - With Batching Plant, Transit Mixer and Concrete Pump, front end loader, electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 7,176.07 |
| 12.8F.2 | Plain cement concrete in open foundation complete as per drawing and technical specifications - PCC Grade M30 with a minimum cement content of 405 kg / cum - Using Batching Plant, Transit Mixer and Concrete Pump, front end loader, electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 7,199.48 |
| 12.8G.2 | Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications - RCC Grade M30 with a minimum cement content of 407 kg / cum - Using Batching Plant, Transit Mixer and Concrete Pump,front end loader, electric gen set including the cost of labour material, formwork and overhead charges | Cum | 7,189.52 |
| 12.8H.2 | Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications - RCC Grade M35 with a minimum cement content of 422 kg / cum - Using Batching Plant, Transit Mixer and Concrete Pump, front end loader, electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 7,288.81 |
| 12.38A.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M20 with a minimum cement content of 341 kg / cum - (Using Batching plant, Transit mixer and Concrete pump) including all machineries and formwork | Cum | 6,779.01 |
| 12.38B.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M25 with a minimum cement content of 399 kg / cum -(Using Batching plant, Transit Mixer and Concrete Pump) including all machineries and formwork | Cum | 7,290.89 |
| 12.38C.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M30 with a minimum cement content of 407 kg / cum -(Using Batching plant, Transit Mixer and Concrete pump) including all machineries and formwork | Cum | 7,355.61 |
| 12.38D.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M35 with a minimum cement content of 422 kg / cum -(Using Batching plant, Transit Mixer and Concrete Pump) including all machineries and formwork | Cum | 7,490.94 |
| 12.1.6 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Backfilling in Marshy Foundation Pits including the cost of labour, hire charge for tractor and overhead charges | Cum | 782.34 |
| 12.1.1A.1 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Ordinary Soil - Manual Means - Depth upto 3 metres including the cost of labour and overhead charges | Cum | 449.32 |
| 12.1.1B.1 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Oridnary Soil - Mechanical Means - Depth upto 3 metres including the cost of labour hire charge of hydraulic excavator and overhead charges | Cum | 79.82 |
| 12.40.2 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 450mm (Using concrete mixer & Portland Slag Cement) | Metre | 2,443.85 |
| 12.41.2 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 750mm (Using concrete mixer & Portland Slag Cement) | Metre | 7,188.72 |
| 12.42.2 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter - 1000mm (Using concrete mixer & Portland Slag Cement) | Metre | 12,066.39 |
| 12.43.2 | Boring, providing and installing bored cast - in - situ reinforced cement concrete pile of specified diameter using approved drilling method to the required depth up to the cut off level in pile cap in RCC M35 grade with a minimum cement content of 419 kg / cum using Blue metal of 20mm and down gauge to carry a safe working load not less than the specified, excluding the cost of steel reinforcement but including the cost of boring with casing from Natural / formed ground level, bentonite mud circulation of approved specific gravity and the length of pile to be embedded in the pile cap. The cost shall include the cost of dismantling of laitenance / week concrete as per BIS norms, removal of dismantled debries and the waste bore mug from the site with all lifts and lead upto 1000m - as directed by the Engineer - in - charge. The rate shall include all machineries required for boring, genset, skilled labour etc. (Length of pile for payment shall be measured upto the bottom of pile cap) - pile diameter -1200mm (Using concrete mixer & Portland Slag Cement) | Metre | 15,946.02 |
| 12.44.1 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 750 mm diametre (Using concrete mixer & Cement SRPC) | Metre | 6,551.10 |
| 12.44.2 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 750 mm diametre (Using concrete mixer & Portland Slag Cement) | Metre | 6,091.84 |
| 12.45.2 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 1000 mm diametre (Using concrete mixer & Portland Slag Cement) | Metre | 10,120.79 |
| 12.46.2 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 1200 mm diametre (Using concrete mixer & Portland Slag Cement) | Metre | 14,752.43 |
| 12.47.2 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum R.C.C piles excluding reinforcement complete as per drawing and technical specifications - 500 mm diameter pile (using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of material and machinery. - Using Portland Slag Cement | Metre | 3,294.56 |
| 12.48.2 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - 750mm diameter pile (Using crane, vibrating pile drawing hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of materials and machinery & Using Portland Slag Cement | Metre | 5,594.06 |
| 12.49.2 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - 1000mm diametre pile.(using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery. - Using Portland Slag Cement | Metre | 11,023.46 |
| 12.50.2 | Driven precast vertical M35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 300mm x 300mm.(Using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery. Using Portland Slag cement | Metre | 2,376.83 |
| 12.51.2 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 500 mm x 500 mm (Using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery. Using Portland Slag Cement | Metre | 3,882.32 |
| 12.52.2 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 750 mm x 750mm.(Using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of material and machinery. Using Portland Slag Cement | Metre | 7,026.62 |
| 12.59A.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M20 with a minimum cement content of 341 kg / cum - (Using Batching plant, Transit mixer and Concrete pump) including all machineries and formwork. (Using Cement SRPC) | Cum | 7,273.32 |
| 12.59B.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M25 with a minimum cement content of 399 kg / cum -(Using Batching plant, Transit Mixer and Concrete Pump) including all machineries and formwork.(Using Cement SRPC) | Cum | 7,893.81 |
| 12.59C.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M30 with a minimum cement content of 407 kg / cum -(Using Batching plant, Transit Mixer and Concrete pump) including all machineries and formwork.(Using Cement SRPC) | Cum | 7,972.27 |
| 12.59D.2 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M35 with a minimum cement content of 422 kg / cum -(Using Batching plant, Transit Mixer and Concrete Pump) including all machineries and formwork.(Using Cement SRPC) | Cum | 8,136.30 |
| 12.59A.2.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M20 with a minimum cement content of 341 kg / cum - (Using Batching plant, Transit mixer and Concrete pump) including all machineries and formwork. Using Portland Slag Cement | Cum | 6,430.64 |
| 12.59B.2.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M25 with a minimum cement content of 399 kg / cum -(Using Batching plant, Transit Mixer and Concrete Pump) including all machineries and formwork.Using Portland Slag Cement | Cum | 6,907.94 |
| 12.59C.2.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M30 with a minimum cement content of 407 kg / cum -(Using Batching plant, Transit Mixer and Concrete pump) including all machineries and formwork. Using Portland Slag Cement | Cum | 6,968.29 |
| 12.59D.2.1 | Cement concrete for reinforced concrete in pile cap complete as per drawing and technical specifications - RCC grade M35 with a minimum cement content of 422 kg / cum -(Using Batching plant, Transit Mixer and Concrete Pump) including all machineries and formwork. Using Portland Slag Cement | Cum | 7,094.47 |
| 12.11C.4.1 | Plain Cement Concrete, in Well Foundation complete as per Drawing and Technical Specifications - Bottom Plug - PCC Grade M35 with a minimum cement content of 419 kg / cum - Using Concrete Mixer | Cum | 9,433.72 |
| 12.11F.4.1 | Reinforced cement concrete, in well foundation complete as per drawing and technical specifications - well cap - RCC grade M35 with a minimum cement content of 422 kg / cum - Using concrete mixer and electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 8,941.24 |
| 12.1.1A.2 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Ordinary Soil - Manual Means - 3 metres to 6 metres depth including the cost of labour and overhead charges | Cum | 577.70 |
| 12.1.1B.2 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Oridnary Soil - Mechanical Means - 3 metres to 6 metres depth including the cost of labour, hire charge of hydraulic excavator and overhead charges | Cum | 91.23 |
| 12.1.1A.3 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Oridnary Soil - Manual Means - Depth above 6 metres including the cost of labour and overhead charges | Cum | 770.26 |
| 12.1.1B.3 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Oridnary Soil - Mechanical Means - above 6 metres depth including the cost of labour, hire charge of hydraulic excavator and overhead charges | Cum | 120.70 |
| 12.3 | Fine aggregate filling in foundation trenches as per drawing and technical specification including the cost of labour, material and overhead charges | Cum | 3,740.22 |
| 12.4 | Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechancially mixed, placed in foundation and compacted by vibration including curing for 14 days including the cost of labour, material, hire charge for concrete mixer, electirc gen set, water tanker and overhead charges | Cum | 6,773.63 |
| 12.5 | Brick Masonry in Cement Mortar 1:3 in foundation complete excluding Pointing and Plastering, as per drawing and technical specifications including the cost of labour, material and overhead charges | Cum | 11,571.55 |
| 12.6 | Cement Mortar 1:3 (1 Cement: 3 fine aggregate) including the cost of labour, material and overhead charges | Cum | 8,426.09 |
| 12.26.1 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 750 mm diametre (Using concrete mixer) | Metre | 6,139.59 |
| 12.28.1 | Driven cast -in -place vertical M35 grade with a minimum cement content of 419 kg / cum R.C.C. pile excluding reinforcement complete as per drawing and technical specifications - 1200 mm diametre (Using concrete mixer) | Metre | 14,874.74 |
| 12.30.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - 750mm diameter pile (Using crane, vibrating pile drawing hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of materials and machinery | Metre | 5,756.91 |
| 12.32.1 | Driven precast vertical M35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 300mm x 300mm.(Using crane and vibrating pile driving hammer with power unit including the cost of materials, labour and transportation cost @ 1% of material and machinery | Metre | 2,410.02 |
| 12.34.1 | Driven precast vertical M 35 grade with a minimum cement content of 419 kg / cum RCC piles excluding reinforcement complete as per drawing and technical specifications - size of pile 750 mm x 750mm.(Using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour and transportation cost @ 1% of material and machinery | Metre | 7,234.05 |
| 12.11C.4.2 | Plain Cement Concrete, in Well Foundation complete as per Drawing and Technical Specifications - Bottom Plug - PCC Grade M35 with a minimum cement content of 419 kg / cum - Using Batching Plant, Transit Mixer and Crane / Concrete Pump, front end loader, electric gen set including the cost of labour, material, admixtures and overhead charges | Cum | 7,478.08 |
| 12.11F.4.2 | Reinforced cement concrete, in well foundation complete as per drawing and technical specifications - well cap - RCC grade M35 with a minimum cement content of 422 kg / cum - Using Batching plant, transit mixer and concrete pump, front end loader, electric gen set including the cost of labour, material, formwork and overhead charges | Cum | 7,117.17 |
Other chapters in this schedule
- Earth Work (70)
- Concrete Work (72)
- Reinforced Concrete Work (131)
- Brick Work (57)
- Stone Work (50)
- Cladding Work (71)
- Wood and PVC Work (493)
- Steel Work (52)
- Flooring (91)
- Roofing (135)
- Finishing (114)
- Repairs To Buildings (108)
- Dismantling And Demolishing (85)
- Miscellaneous Building Work (25)
- Sanitary Installations (226)
- Water Supply (708)
- Drainage (135)
- Pile Work (31)
- Aluminium Work (41)
- Water Proofing (27)
- Rain Water Harvesting & TubeWells (37)
- Conservation of Heritage Buildings (7)
- Structural Glazing Aluminium Composite Panel (5)
- New Technologies and Materials (196)
- Irrigation (50)
- Water Supply (Public Health) (1012)
- Sewerage (Public Health) (213)
- Miscellaneous (Public Health) (71)
- OHT (Works) (8)
- Subsoil Exploration (7)
- Energy Conservation Building Code (137)
- Site Clearance and Dismantling (44)
- Earth Work, Erosion Control and Drainages (40)
- Granular Sub-base (63)
- Base & Bituminous Construction (26)
- Traffic Signs,Markings & Other Road Appurtenances (41)
- Pipe Culverts (5)
- Maintenance of Roads (13)
- Horticulture (25)
- Substructure (54)
- Superstructure (97)
- River Training and Protection Works (10)
- Repair and Rehabilitation (12)
- PMGSY -Works (25)
Pricing foundation against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works