YOU SEND
Drawings, specifications and the rate basis your project uses.
DWGGeneral arrangement drawingsPDFSpecificationXLSRate basis
WE PREPARE
Our AI does the first pass and marks anything it isn’t sure of. An engineer resolves every marked item and signs the work off.
YOU GET
A detailed estimate with quantities, rate build-ups, assumptions and exclusions, signed off by an engineer.
BILL OF QUANTITIES · BRIDGE, SPAN 2SIGNED OFF
ITEMDESCRIPTIONUNITQTY
2.03Reinforcement steel, Fe500t186
2.07M35 concrete, pier capsm³312
3.02Elastomeric bearingsnos24
WHAT IT CAN INCLUDE
01
Quantity take-offs and BOQs
Quantities measured from your drawings to the method of measurement your project uses, such as IS 1200, POMI, RICS NRM or CESMM4, and set out in the format your tender asks for.
02
Rate analysis
Rate build-ups from materials, labour and machinery against your rate basis, such as the CPWD DSR or a state schedule of rates.
03
Detailed estimates
Quantities and rates brought together, with the assumptions and exclusions written down so you can see what the number includes.
04
Bar bending schedules
Bar shapes, diameters, numbers and lengths scheduled from the reinforcement drawings, and updated when the drawings are revised.
QUESTIONS04