Skip to main content

Tender estimation, priced before the bid closes.

Send the tender documents and the closing date. We take off the quantities, price them on the schedule of rates or rate basis the tender uses, and return the estimate with its workings and a list of clarifications, so your team can decide the bid with time to spare.

What you send, what you get

You send

The tender documents, the drawings and the closing date.

PDFTender documents and addendaDWGDrawingsXLSBOQ format, if the tender gives one

You get

A priced estimate in the tender's own format, with rate build-ups, assumptions, exclusions and clarifications, signed off by an engineer.

TENDER ESTIMATE · ABSTRACT OF COSTSIGNED OFF
ITEMDESCRIPTIONUNITAMOUNT
1Earthwork in excavationm³18.4 L
2RCC M30 in substructurem³1.92 Cr
3Reinforcement, Fe 500Dt1.36 Cr
C-04Liner depth not statedClarify

Illustrative sample.

What it covers

  • Quantities from the drawings

    Every item measured from the tender drawings to the method of measurement the tender specifies, with the working for each.

  • Priced on the right schedule

    Rates from the schedule of rates or data book the tender names, at the edition and cost index in force, with item numbers and page references.

  • Rate analysis where needed

    Items the schedule doesn't cover built up from materials, labour and machinery, so non-schedule items are priced on a stated basis.

  • Clarifications with cost effects

    Gaps and conflicts in the drawings listed with what each one does to the price, ready to raise at the pre-bid meeting or price as a risk.

How we do it

  • Read the tender

    The scope, the BOQ format, the measurement rules and the conditions that move price, such as material escalation, lead distances and who bears which risk.

  • Take off the quantities

    Each item measured from the drawings, with the drawing and dimension it came from.

  • Price on the schedule

    Each item mapped to the exact schedule item, not a near match, and priced at the current edition.

  • Check before it goes

    Drawing values re-read, rates and item mapping checked, and quantities recomputed. An engineer signs it off.

Schedules of rates
CPWD DSR, state PWD and irrigation schedules, water board and railway schedules
Data books
MoRTH Standard Data Book, CPWD Analysis of Rates
Measurement
IS 1200, MoRTH Section 100 and the measurement clauses of each specification
Specifications
MoRTH Specifications for Road and Bridge Works, IRC codes, CPWD specifications

Working to something else? Tell us what your project uses and we’ll confirm it before we start.

General arrangement drawing, longitudinal elevation of a six-span bridge on bored pilesFrom our workA 150 m river bridge, estimated from one drawingA 150 m bridge priced on a Public Works Department schedule from one drawing, the same day, with 23 clarifications.Read the case study

Questions about tender estimation

Send a project

It depends on the size of the package and the state of the drawings. Our fastest so far was a bridge estimate from one drawing on the same day. Tell us the closing date when you send the documents and we'll confirm whether we can meet it.

Yes. We price on the schedule of rates or data book the tender names, at the edition in force, and build up a rate analysis for anything the schedule doesn't cover.

Yes. If the tender gives a BOQ template, the estimate is delivered in it, with our workings and rate build-ups alongside.

No. We give you the priced estimate and its basis. Your team decides the margin, the discount and whether to bid.

Yes. We're happy to sign one before you share the tender documents.

Also in estimating