Skip to main content

Civil quantities, traced to the drawings

Take-off, bills of quantities, queries and revisions for highway, bridge and drainage projects, wherever the project is.

Island highway, detailed project reportRead the case study
47.3 km
of road
45 items
in the bill
4,544
values traced
32 points
referred to an engineer

What you receive

  1. 01

    Bill of quantities

    In the client’s format and numbering.

  2. 02

    Measurement records

    Every quantity, back to its sheet.

  3. 03

    Revision reports

    Each reissue compared with the last.

  4. 04

    Clarification queries

    Ready to send to the client.

How a job runs

  1. 01
    Day 0

    You send the drawings

    As issued, with the due date.

  2. 02
    Within a day

    We agree a fixed fee

    Or ask what we need first.

  3. 03
    During the job

    We take off every sheet

    Open points go to an engineer.

  4. 04
    Before you submit

    You get the bill

    And every reissue, matched.

The work we cover

Roads and highways Box culverts Bridges Retaining and toe walls Drainage Earthworks Coastal protection

Measured toCESMM4MMHWPOMIMoRTHor the method your project names.

Questions

The drawings as issued, in PDF; the bill of quantities format, if one is specified; any earthworks, survey or geotechnical reports; and your deadline.

Roads and highways, box culverts, bridges, retaining walls, drainage, earthworks and coastal protection.

The one the project specifies: CESMM4 or the Method of Measurement for Highway Works in the UK, POMI in the Gulf, MoRTH and IS 1200 in India, or a method written for the project. Each bill item records the clause it is measured under.

Tell us the deadline when you send the drawings. We confirm whether we can meet it, and the fixed fee, within one working day.

Each reissued sheet is matched to the previous issue by title, drawing number and content. We report what has changed, which bill items are affected and any new inconsistency between documents.

Coming next

A single 6 × 3 m box culvert cell as drawn, against a twin 3 × 3 m alternative.

Value engineering

In development

Alternatives compared against the design as drawn.

A road corridor on a curve, with its cross-section templates set out along it and a culvert crossing under the embankment.

Design

Planned

Drawings from the same model as the quantities.