Engineering work,from tender to site.

Send us one package or a regular workload. Below is what we need from you for each service and what you get back.

SCROLL TO WALK THROUGH A PROJECT
B-01 · TENDERTender and Bid SupportTender documents reviewed and the technical side of your bid drafted.
YOU SEND
PDFTender documentsPDFAddenda and clarificationsDOCBid timeline
YOU GET
RISK REGISTER · HIGHWAY PACKAGESIGNED OFF
REFCLAUSERISKACTION
R-014.2Liquidated damages uncappedClarify
R-027.1Utility shifting by contractorPrice
R-0312.4Rate validity 180 daysNote
More about Tender and Bid Support
B-02 · BIDEstimating and QuantitiesEstimates, bills of quantities, rate analysis and bar bending schedules.
YOU SEND
DWGGeneral arrangement drawingsPDFSpecificationXLSRate basis
YOU GET
BILL OF QUANTITIES · BRIDGE, SPAN 2SIGNED OFF
ITEMDESCRIPTIONUNITQTY
2.03Reinforcement steel, Fe500t186
2.07M35 concrete, pier capsm³312
3.02Elastomeric bearingsnos24
More about Estimating and Quantities
B-03 · DESIGNDesign Checks and DrawingsCalculations and drawings checked before they go out, and shop drawings and as-builts prepared.
YOU SEND
PDFDesign calculationsDWGDrawings for issuePDFApplicable codes
YOU GET
CHECK LOG · PIER CAP CALCULATIONSSIGNED OFF
REFITEMFINDINGSTATUS
C-01Load combinationsCombination missing from setOpen
C-02CoverMatches specificationClosed
C-03ShearWithin capacityClosed
More about Design Checks and Drawings
B-04 · CONTRACTContract ManagementNotices, variations, claims and payment applications, prepared on time from your contract and site records.
YOU SEND
PDFContract booksPDFCorrespondence both waysXLSRunning bills and site records
YOU GET
NOTICE REGISTER · PACKAGE 2SIGNED OFF
REFEVENTCLAUSESTATUS
N-04Late issue of pier drawings20.2Due in 6 days
V-12Additional piling at A213.3Submitted
P-07Interim payment 714.3Submitted
More about Contract Management
B-05/CODES AND STANDARDS