Case studies from real projects.
A claims review on a delayed public contract
A claims review for a contractor on a delayed public EPC contract. We read the whole file, valued each claim and the client's likely answer, set out the exposure and drafted the letters to send.
Read the case study- Letter read
- Every
- Claims and exposure
- Both sides
- By strength and timing
- Ranked
- Letters to send
- Ready
- 02 · BRIDGES / ESTIMATES AND BOQS / OCT 2026
A bar bending schedule for a sloping bridge wing wall
A sample schedule for a contractor, from a typical wing wall drawing. The wall falls from 6 m to 2 m, so it was scheduled in five segments, every bar length worked out, with 1.30 t of steel to cut and three points flagged for the designer.
Read the case study - 03 · HIGHWAYS / ESTIMATES AND BOQS / OCT 2026
Road, culverts, bridges and sea walls on an island
The estimate for upgrading a highway on a remote island. The road is priced at island rates built up from sea freight, and the estimate covers over 100 box culverts, six minor bridges, retaining walls and tetrapod sea armour. Each number is traced to its source.
Read the case study - 04 · BRIDGES / ESTIMATES AND BOQS / SEP 2026
A 150 m river bridge, estimated from one drawing
A detailed estimate for a high-level bridge, priced on the Public Works Department's Schedule of Rates from a single general arrangement drawing the same day, with 23 clarifications and ₹80 lakh+ of savings and risks flagged.
Read the case study