Puducherry SOR 2024-25
Stone Work rates
50 stone work items from the Puducherry PWD, effective 2024-08-14.
Stone Work rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹34.30 to ₹1,58,961.00. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.
50 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 7.1.1 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement: 6 fine aggregate: 12 graded stone aggregate 20mm nominal size) upto plinth level with - cement mortar 1:6 (1 cement: 6 fine aggregate) | Cum | 6,524.37 |
| 7.2.1 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1cement: 6 fine aggregate: 12 graded stone aggregate 20mm nominal size) at window sills, ceiling level and the like - cement mortar 1:6 (1 cement: 6 fine aggregate) | Cum | 8,298.27 |
| 7.4.1 | Extra for random rubble masonry with hard stone in - square or rectangular pillars | Cum | 1,014.34 |
| 7.4.2 | Extra for random rubble masonry with hard stone in - circular pillars | Cum | 2,589.21 |
| 7.5 | Extra for random rubble masonry with hard stone curved on plan for a mean radius not exceeding 6m | Cum | 945.35 |
| 7.6.1 | Coursed rubble masonry (first sort) with hard stone in foundation and plinth with - cement mortar 1:6 (1 cement: 6 fine aggregate) | Cum | 8,166.54 |
| 7.7.1 | Coursed rubble masonry (second sort) with hard stone in foundation and plinth with - cement mortar 1:6 (1 cement: 6 fine aggregate) | Cum | 7,539.16 |
| 7.8.1 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level - Masonry work (first sort), in cement mortar 1:6 (1 cement: 6 fine aggregate) | Cum | 9,899.62 |
| 7.8.2 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level - Masonry work (second sort), in cement mortar 1:6 (1 cement: 6 fine aggregate) | Cum | 9,272.24 |
| 7.10.1 | Extra for coursed rubble masonry with hard stone (first or second sort) - in square or rectangular pillars | Cum | 1,135.98 |
| 7.10.2 | Extra for coursed rubble masonry with hard stone (first or second sort) - in circular pillars | Cum | 2,965.49 |
| 7.11 | Extra for coursed rubble masonry with hard stone (first or second sort) curved on plan for a mean radius not exceeding 6m | Cum | 1,039.24 |
| 7.12.1.1 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement:2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - red sand stone | Cum | 52,503.00 |
| 7.12.1.2 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement:2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - white sand stone | Cum | 53,453.00 |
| 7.12.2.1 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement:2 stone dust) with an admixture of pigment matching the stone shade - both faces dressed - red sand stone | Cum | 76,703.00 |
| 7.12.2.2 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement:2 stone dust) with an admixture of pigment matching the stone shade - both faces dressed -white sand stone | Cum | 77,652.00 |
| 7.13.1.1 | Stone work plain ashlar in arches in superstructure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - red sand stone | Cum | 56,402.00 |
| 7.13.1.2 | Stone work plain ashlar in arches in superstructure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - white sand stone | Cum | 57,353.00 |
| 7.13.2.1 | Stone work plain ashlar in arches in superstructure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - both faces dressed - red sand stone | Cum | 80,603.00 |
| 7.13.2.2 | Stone work plain ashlar in arches in superstructure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - both faces dressed - white sand stone | Cum | 81,551.00 |
| 7.14.1.1 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - red sand stone | Cum | 96,882.00 |
| 7.14.1.2 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - white sand stone | Cum | 97,831.00 |
| 7.14.2.1 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - both faces dressed - red sand stone | Cum | 1,58,012.00 |
| 7.14.2.2 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 fine aggregate) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - both faces dressed - white sand stone | Cum | 1,58,961.00 |
| 7.15.1.1 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - red sand stone | Cum | 48,586.00 |
| 7.15.1.2 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - one face dressed - white sand stone | Cum | 49,533.00 |
| 7.15.2.1 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture og pigment matching the stone shade - both faced punched - red sand stone | Cum | 68,864.00 |
| 7.15.2.2 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 fine aggregate) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - both faced punched - white sand stone | Cum | 69,813.00 |
| 7.16 | Extra for stone work, Random rubble / Coursed rubble masonry / Ashlar masonry above floor V level for every four floors or part thereof | Cum | 184.54 |
| 7.17.1 | Extra for plain ashlar or ashlar punched in - square or rectangular pillars | Cum | 1,620.00 |
| 7.18 | Extra for stone work; plain ashlar or ashlar punched curved on plan with a mean radius not exceeding 6 m | Cum | 1,127.00 |
| 7.19 | Extra for additional cost of centering for arches exceeding 6 m span including all strutting, bolting, wedging etc. and removal (area of soffit to be measured) | Sqm | 393.50 |
| 7.20.1 | Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1cement:6 fine aggregate) including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - red sand stone | Cum | 81,396.00 |
| 7.20.2 | Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1cement:6 fine aggregate) including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - white sand stone | Cum | 82,345.00 |
| 7.21.1 | Extra for stone work ashalr sunk or moulded or carved in - triangular or square or rectangular pillars | Cum | 2,114.00 |
| 7.21.2 | Extra for stone work ashalr sunk or moulded or carved in - circular or polygonal pillars | Cum | 5,988.00 |
| 7.24 | Extra for stone work (veneer work) curved on plan with a mean radius not exceeding 6m | Cum | 1,620.00 |
| 7.26 | Providing and fixing stone dowels 10x5x2.50 cm cut to double wedge shape as per design in cement mortar 1:2 (1 cement: 2 fine aggregate) including making the necessary chases | Each | 34.30 |
| 7.28.1.1 | Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the wall as measured along the slope in cement mortar 1:4 (1 cement: 4 fine aggregate) with 12mm diameter anchoring steel bar, 45 cm long, fixed in each stone and supported on and including with brick cove in cement mortar 1:4 (1 cement:4 fine aggregate) including pointing in cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - red sand stone - with common burnt clay F.P.S (non modular) bricks of class designation 3.5 | Sqm | 2,621.32 |
| 7.28.2.1 | Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the wall as measured along the slope in cement mortar 1:4 (1 cement: 4 fine aggregate) with 12mm diameter anchoring steel bar, 45 cm long, fixed in each stone and supported on and including with brick cove in cement mortar 1:4 (1 cement:4 fine aggregate) including pointing in cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - white sand stone - with common burnt clay F.P.S (non modular) bricks of class designation 3.5 | Sqm | 2,816.93 |
| 7.29.1 | Providing and fixing horizontal chajja of stone 40mm thick and upto 80cm projection in cement mortar 1:4 (1 cement: 4 fine aggregate) including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - red sand stone | Sqm | 1,650.35 |
| 7.29.2 | Providing and fixing horizontal chajja of stone 40mm thick and upto 80cm projection in cement mortar 1:4 (1 cement: 4 fine aggregate) including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade - white sand stone | Sqm | 1,821.07 |
| 7.31 | Providing and fixing red sand stone brackets 55x22.5x45 cm sunk and moulded including providing and fixing with 4 nos gun metal cramp 25x6 mm 30 cm long and dowel bars 7.5 cm long 6mm dia as per design | Each | 6,322.59 |
| 7.32.1 | Stone work, plain in copings, cornices, string courses and plinth course, upto 75 mm thick in cement mortar 1:6 (1 cement: 6 fine aggregate) including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an amixture of pigment matching the stone shade - red sand stone | Cum | 79,011.02 |
| 7.32.2 | Stone work, plain in copings, cornices, string courses and plinth course, upto 75 mm thick in cement mortar 1:6 (1 cement: 6 fine aggregate) including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an amixture of pigment matching the stone shade -white sand stone | Cum | 79,959.97 |
| 7.33.1 | Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement: 3 fine aggregate), including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc - red sand stone | Sqm | 16,166.89 |
| 7.33.2 | Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement: 3 fine aggregate), including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc - white sand stone | Sqm | 16,323.38 |
| 7.35 | Extra for laying stone work in or under foul position | Cum | 450.27 |
| 7.38.1.1 | Stone tile work for wall lining upto 10m height with special adhesive over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 fine aggregate), including pointing in white cement with an admixture of pigment to match the stone shade - 8mm thick (mirror polished and machine cut edge) - granite stone of any colour and shade | Sqm | 2,927.65 |
| 7.38.1.2 | Stone tile work for wall lining upto 10m height with special adhesive over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 fine aggregate), including pointing in white cement with an admixture of pigment to match the stone shade - 8mm thick (mirror polished and machine cut edge) - raj nagar plain white marble / udaipur green marble / zebra black marble | Sqm | 2,781.83 |
Other chapters in this schedule
- Earth Work (70)
- Concrete Work (72)
- Reinforced Concrete Work (131)
- Brick Work (57)
- Cladding Work (71)
- Wood and PVC Work (493)
- Steel Work (52)
- Flooring (91)
- Roofing (135)
- Finishing (114)
- Repairs To Buildings (108)
- Dismantling And Demolishing (85)
- Miscellaneous Building Work (25)
- Sanitary Installations (226)
- Water Supply (708)
- Drainage (135)
- Pile Work (31)
- Aluminium Work (41)
- Water Proofing (27)
- Rain Water Harvesting & TubeWells (37)
- Conservation of Heritage Buildings (7)
- Structural Glazing Aluminium Composite Panel (5)
- New Technologies and Materials (196)
- Irrigation (50)
- Water Supply (Public Health) (1012)
- Sewerage (Public Health) (213)
- Miscellaneous (Public Health) (71)
- OHT (Works) (8)
- Subsoil Exploration (7)
- Energy Conservation Building Code (137)
- Site Clearance and Dismantling (44)
- Earth Work, Erosion Control and Drainages (40)
- Granular Sub-base (63)
- Base & Bituminous Construction (26)
- Traffic Signs,Markings & Other Road Appurtenances (41)
- Pipe Culverts (5)
- Maintenance of Roads (13)
- Horticulture (25)
- Foundation (106)
- Substructure (54)
- Superstructure (97)
- River Training and Protection Works (10)
- Repair and Rehabilitation (12)
- PMGSY -Works (25)
Pricing stone work against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works