Puducherry SOR 2024-25
Horticulture rates
25 horticulture items from the Puducherry PWD, effective 2024-08-14.
Horticulture rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹25.07 to ₹4,68,459.43. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.
25 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 11.1 | Spreading of sludge farm yard manure or/ and good earth in required thickness(cost of sludge, farm-yard manure or/and good earth to be paid for separately) | Cum | 219.74 |
| 11.2A | Grassing with 'Doob' grass including watering and maintenance of the lawn for 30 days or more tlii the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed-in rows 15cm apart in either direction | Sqm | 27.89 |
| 11.2B | Grassing with 'Doob' grass including watering and maintenance of the lawn for 30 days or more tlii the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed-in rows 7.5 cm apart in either direction | Sqm | 41.02 |
| 11.3 | Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm | Sqm | 25.07 |
| 11.4 | Maintenance of lawns or Turfing of slopes (rough grassing) for a period of one year including watering,etc | Sqm | 254.95 |
| 11.5 | Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal of rubbish, dressing and supplying doob grass roots at 10 cm apart, including supplying and spreading of farmyard manure at rate of 0.6 cum per 100 sqm | Sqm | 37.96 |
| 11.6 | Maintenance of lawns with fine grassing for the first year including watering, etc | Sqm | 214.10 |
| 11.7A | Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metre and supplying and planting two rows of hedge plants at 30 cm apart | Rmt | 521.42 |
| 11.7B | Maintenance of hedge for one year | Rmt | 442.39 |
| 11.8A | Planting flowering plants and shrubs in central verge - 200 plants and 800 shrubs in two rows in one km length of road where width of verge is 3m and above | Rmt | 73.06 |
| 11.8B | Maintenance of flowering plants and shrubs in central verge for one year - 200 plants and 800 shrubs in two rows in one km length of road where width of verge is 3m and above | KM | 4,68,459.43 |
| 11.9 | Planting of trees by the roadside (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farmyard/ sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year | Each | 2,266.50 |
| 11.10 | Renovation lawns including weeding forking the ground, top dressing with forked soil, watering and maintenance the lawns, for 30 days or more, till the grass forms a thick lawn, free from weeds, and fit for moving and disposal of rubish as directed, including supplying good earth, if needed but excluding the cost of well decayed farmyard manure | Sqm | 38.17 |
| 11.11 | Supply at site of work well decayed farm yard manure, from any available source, approved, screening and stacking | Cum | 387.35 |
| 11.12 | Supply at site of work / store - deoiled neem cake duly packed in used gunny bags | Quintal | 1,408.56 |
| 11.13 | Supplying sludge duly stacked at site/store | Cum | 63.39 |
| 11.14 | Half brick circular tree guard in 2nd class brick internal diametre 1.25 m and height 1.2 m above ground and 0.20 m below ground, bottom two courses laid dry and top three courses in cement mortar 1:6 (1 cement: 6 fine aggregate) and the intermediate courses being in dry honey comb masonry as per design complete | Each | 3,222.76 |
| 11.15 | Edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metre | Metre | 65.18 |
| 11.16 | Making tree guard 53 cm dia and 1.3 m high as per Design from empty bitumen drum, slit suitably to permit sun and air, (supplied by the department at stock issue rate) including providing and fixing 2 nos. MS sheet rings 50 x 0.5 mm with rivets, complete in all respect | Each | 2,229.14 |
| 11.17 | Maing tree guard 53 cm dia 2 metre high as per design from empty bitumen drums, slit suitably to permit sun and air, (supplied by the department at stock issue rate) including providing and fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and providing and fixing 2 nos. MS sheet rings 50 x 0.5 mm with rivets complete in all respects | Each | 4,877.93 |
| 11.18 | Wrought iron and mild steel welded work (using angles, square bars, tees and channel grills, grating frames, gates and treeguards of any size and design etc. including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately | Quintal | 14,465.83 |
| 11.19 | Providing and fixing MS iron tree guard 60 cm dia and 2 metre high abvoe ground level formed of 4 Nos. (25 x 6 mm) and 8 Nos. (25 x 3 mm)vertical MS riveted to 3 Nos. (25 x 6 mm) iron rings in two halves, bolted together with 8 mm dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming complete in all respects | Each | 3,319.18 |
| 11.20 | Providing and fixing tree guard 0.60 metre square, 2 metre high fabricated with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire 3 mm dia welded and fabricated as per design in two halves bolted together | Each | 4,196.10 |
| 11.21 | Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of 6 m by grubbing and levelling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm yard / sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering | Hectare | 1,53,570.80 |
| 11.29A | Supply of circular shaped steel tree guard of 45 cm dia and 1.5m height, which includes leg height of 15 cm. The tree guard circular frame is made out of 3 nos of horizontal rings using 20mm X 6mm, M.S. flats and vertical legs of 3 nos using 10 mm rod, intermediate gaps are welded with 9 nos of 6 mm rod verticals. The tree guard will be painted in green colour and required lettering will be provided in the name boards of size 23 cm X 51 cm at center and 15 cm X 51cm at the top using 20 gauge thick sheet, supported with 20 mm X 6mm M.S.flats at rear side all complete | Sqm | 927.92 |
Other chapters in this schedule
- Earth Work (70)
- Concrete Work (72)
- Reinforced Concrete Work (131)
- Brick Work (57)
- Stone Work (50)
- Cladding Work (71)
- Wood and PVC Work (493)
- Steel Work (52)
- Flooring (91)
- Roofing (135)
- Finishing (114)
- Repairs To Buildings (108)
- Dismantling And Demolishing (85)
- Miscellaneous Building Work (25)
- Sanitary Installations (226)
- Water Supply (708)
- Drainage (135)
- Pile Work (31)
- Aluminium Work (41)
- Water Proofing (27)
- Rain Water Harvesting & TubeWells (37)
- Conservation of Heritage Buildings (7)
- Structural Glazing Aluminium Composite Panel (5)
- New Technologies and Materials (196)
- Irrigation (50)
- Water Supply (Public Health) (1012)
- Sewerage (Public Health) (213)
- Miscellaneous (Public Health) (71)
- OHT (Works) (8)
- Subsoil Exploration (7)
- Energy Conservation Building Code (137)
- Site Clearance and Dismantling (44)
- Earth Work, Erosion Control and Drainages (40)
- Granular Sub-base (63)
- Base & Bituminous Construction (26)
- Traffic Signs,Markings & Other Road Appurtenances (41)
- Pipe Culverts (5)
- Maintenance of Roads (13)
- Foundation (106)
- Substructure (54)
- Superstructure (97)
- River Training and Protection Works (10)
- Repair and Rehabilitation (12)
- PMGSY -Works (25)
Pricing horticulture against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works