Pile Work rates
- Items
- 31
- Lowest rate
- ₹2,359.62
- Highest rate
- ₹23,625.58
- Effective from
- 2024-08-14
Pile Work rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹2,359.62 to ₹23,625.58. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.
31 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 20.1.1 | Providing, driving with hydraulic piling rigs with power units and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 400 mm dia piles | Metre | 2,495.31 |
| 20.2A.1 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate lengthfor setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawier mounted telescopic boom hydraulic pilling rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) Note:Truck Mounted rotary / TMR/Tube well boring machine shall not be used- 600mm dia piles | Metre | 4,979.10 |
| 20.1.2 | Providing, driving with hydraulic piling rigs with power units and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 450 mm dia piles | Metre | 3,075.47 |
| 20.2A.2 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate lengthfor setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawier mounted telescopic boom hydraulic pilling rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) Note:Truck Mounted rotary / TMR/Tube well boring machine shall not be used- 750mm dia piles | Metre | 7,262.08 |
| 20.1.3 | Providing, driving with hydraulic piling rigs with power units and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 500 mm dia piles | Metre | 3,691.41 |
| 20.2A.3 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate lengthfor setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawier mounted telescopic boom hydraulic pilling rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) Note:Truck Mounted rotary / TMR/Tube well boring machine shall not be used- 1000 mm dia piles | Metre | 12,293.99 |
| 20.1.4 | Providing, driving with hydraulic piling rigs with power unitsand installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 550 mm dia piles | Metre | 4,089.88 |
| 20.2A.4 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate lengthfor setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawier mounted telescopic boom hydraulic pilling rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) Note:Truck Mounted rotary / TMR/Tube well boring machine shall not be used- 1200 mm dia piles | Metre | 16,314.22 |
| 20.1.5 | Providing, driving with hydraulic piling rigs with power unitsand installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 750 mm dia piles | Metre | 7,053.58 |
| 20.1.6 | Providing, driving with hydraulic piling rigs with power units and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 1000 mm dia piles | Metre | 11,740.11 |
| 20.1.7 | Providing, driving with hydraulic piling rigs with power units and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) -1200 mm dia piles | Metre | 15,549.98 |
| 20.1.8 | Providing, driving with hydraulic piling rigs with power units and installing driven cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) - 1500 mm dia piles | Metre | 22,267.16 |
| 20.2.1 | Boring, providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc, by percussion drilling using direct mud circulation (DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 450 mm dia piles - Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used | Metre | 2,359.62 |
| 20.2.2 | Boring, providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc, by percussion drilling using direct mud circulation (DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 500 mm dia piles - Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used | Metre | 2,791.08 |
| 20.2.3 | Boring, providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc, by percussion drilling using direct mud circulation (DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 600 mm dia piles - Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used | Metre | 3,736.53 |
| 20.2.4 | Boring, providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc, by percussion drilling using direct mud circulation (DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 750 mm dia piles - Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used | Metre | 5,715.20 |
| 20.3.1 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diametre and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (Length of pile for payment shall be measured upto to the bottom of pile cap) - 300 mm dia piles | Metre | 2,609.65 |
| 20.3.2 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diametre and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (Length of pile for payment shall be measured upto to the bottom of pile cap) - 400 mm dia piles | Metre | 3,365.93 |
| 20.3.3 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diametre and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (Length of pile for payment shall be measured upto to the bottom of pile cap) - 450 mm dia piles | Metre | 3,814.69 |
| 20.3.4 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diametre and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (Length of pile for payment shall be measured upto to the bottom of pile cap) - 550 mm dia piles | Metre | 4,302.61 |
| 20.4.1 | Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter (only the nos, of extra bulbs are to be paid) - 300mm dia piles | Each | 2,393.28 |
| 20.4.2 | Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter (only the nos, of extra bulbs are to be paid) - 400mm dia piles | Each | 2,705.06 |
| 20.4.3 | Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter (only the nos, of extra bulbs are to be paid) - 450mm dia piles | Each | 2,893.84 |
| 20.4.4 | Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter (only the nos, of extra bulbs are to be paid) - 550mm dia piles | Each | 3,162.46 |
| 20.5.1 | Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and lenghth below the pile cap in M-25 cement concrete to carry safe working load not less than specified. With a central through preformed hole with M.S.black pipe of dia, 40mm for grouting with cement sand grouting mix 1:2 (1 cement: 2 fine aggregate) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap) - 400 mm dia piles | Metre | 3,725.93 |
| 20.5.2 | Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and lenghth below the pile cap in M-25 cement concrete to carry safe working load not less than specified. With a central through preformed hole with M.S.black pipe of dia, 40mm for grouting with cement sand grouting mix 1:2 (1 cement: 2 fine aggregate) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap) - 450 mm dia piles | Metre | 4,754.97 |
| 20.5.3 | Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and lenghth below the pile cap in M-25 cement concrete to carry safe working load not less than specified. With a central through preformed hole with M.S.black pipe of dia, 40mm for grouting with cement sand grouting mix 1:2 (1 cement: 2 fine aggregate) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap) - 500 mm dia piles | Metre | 4,914.48 |
| 20.5.4 | Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and lenghth below the pile cap in M-25 cement concrete to carry safe working load not less than specified. With a central through preformed hole with M.S.black pipe of dia, 40mm for grouting with cement sand grouting mix 1:2 (1 cement: 2 fine aggregate) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap) - 550 mm dia piles | Metre | 5,607.46 |
| 20.2A.5 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate lengthfor setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawier mounted telescopic boom hydraulic pilling rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) Note:Truck Mounted rotary / TMR/Tube well boring machine shall not be used- 1500 mm dia piles | Metre | 23,625.58 |
| 20.5.5 | Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and lenghth below the pile cap in M-25 cement concrete to carry safe working load not less than specified. With a central through preformed hole with M.S.black pipe of dia, 40mm for grouting with cement sand grouting mix 1:2 (1 cement: 2 fine aggregate) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap) - 750 mm dia piles | Metre | 10,756.46 |
| 20.5.6 | Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and lenghth below the pile cap in M-25 cement concrete to carry safe working load not less than specified. With a central through preformed hole with M.S.black pipe of dia, 40mm for grouting with cement sand grouting mix 1:2 (1 cement: 2 fine aggregate) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap) - 1000 mm dia piles | Metre | 14,805.11 |
- ISSUED BY
- Puducherry PWD
- EFFECTIVE
- 2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Earth Work70
- Concrete Work72
- Reinforced Concrete Work131
- Brick Work57
- Stone Work50
- Cladding Work71
- Wood and PVC Work493
- Steel Work52
- Flooring91
- Roofing135
- Finishing114
- Repairs To Buildings108
SHOW ALL 44 CHAPTERS
- Dismantling And Demolishing85
- Miscellaneous Building Work25
- Sanitary Installations226
- Water Supply708
- Drainage135
- Aluminium Work41
- Water Proofing27
- Rain Water Harvesting & TubeWells37
- Conservation of Heritage Buildings7
- Structural Glazing Aluminium Composite Panel5
- New Technologies and Materials196
- Irrigation50
- Water Supply (Public Health)1012
- Sewerage (Public Health)213
- Miscellaneous (Public Health)71
- OHT (Works)8
- Subsoil Exploration7
- Energy Conservation Building Code137
- Site Clearance and Dismantling44
- Earth Work, Erosion Control and Drainages40
- Granular Sub-base63
- Base & Bituminous Construction26
- Traffic Signs,Markings & Other Road Appurtenances41
- Pipe Culverts5
- Maintenance of Roads13
- Horticulture25
- Foundation106
- Substructure54
- Superstructure97
- River Training and Protection Works10
- Repair and Rehabilitation12
- PMGSY -Works25
Pricing pile work against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.