Miscellaneous (Public Health) rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹142.11 to ₹9,015.97. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.
71 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 33.10 | Cutting holes upto 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the holes after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement:2 fine aggregate:4 graded stone aggregate 20mm nominal size) including finishing complete so as to make it leak proof | Each | 421.16 |
| 33.22.1 | Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site, lead upto 50 metres: 80 mm diameter C.I. pipe | Metre | 308.74 |
| 33.22.2 | Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site, lead upto 50 metres: 100 mm diameter C.I. pipe | Metre | 325.01 |
| 33.22.4 | Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site, lead upto 50 metres: 150 mm diameter C.I. pipe | Metre | 355.96 |
| 33.22.5 | Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site, lead upto 50 metres: 200 mm diameter C.I. pipe | Metre | 400.34 |
| 33.22.6 | Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site, lead upto 50 metres: 250 mm diameter C.I. pipe | Metre | 443.17 |
| 33.22.7 | Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site, lead upto 50 metres: 300 mm diameter C.I. pipe | Metre | 483.26 |
| 33.23.1 | Labour for cutting C.I. pipe with steel saw:- 80mm diameter C.I. pipe | Each | 142.11 |
| 33.23.2 | Labour for cutting C.I. pipe with steel saw:- 100mm diameter C.I. pipe | Each | 189.68 |
| 33.23.3 | Labour for cutting C.I. pipe with steel saw:- 125mm diameter C.I. pipe | Each | 261.29 |
| 33.23.4 | Labour for cutting C.I. pipe with steel saw:- 150mm diameter C.I. pipe | Each | 355.80 |
| 33.23.5 | Labour for cutting C.I. pipe with steel saw:- 200mm diameter C.I. pipe | Each | 474.44 |
| 33.23.6 | Labour for cutting C.I. pipe with steel saw:- 250mm diameter C.I. pipe | Each | 592.44 |
| 33.23.7 | Labour for cutting C.I. pipe with steel saw:- 300mm diameter C.I. pipe | Each | 711.08 |
| 33.23.8 | Labour for cutting C.I. pipe with steel saw:- 350mm diameter C.I. pipe | Each | 829.08 |
| 33.24 | Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site | Cum | 1,564.90 |
| 33.25A | Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete. (Excluding cost of stone) | Sqm | 666.90 |
| 33.27.1.1 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -Upto 60 mts depth ending below ground level | Metre | 1,536.10 |
| 33.27.1.2 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. - From 60mts and upto 90 mts. Depth ending below ground level | Metre | 1,663.60 |
| 33.27.1.3 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. - From 90mts and upto 120 mts. Depth ending below ground level | Metre | 1,763.80 |
| 33.27.1.4 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 120mts and upto 150 mts. Depth ending below ground level | Metre | 1,857.30 |
| 33.27.1.5 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 150mts and upto 180 mts. Depth ending below ground level | Metre | 1,886.20 |
| 33.27.1.6 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 180mts and upto 210 mts. Depth ending below ground level | Metre | 1,947.30 |
| 33.27.1.7 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 210mts and upto 240 mts. Depth ending below ground level | Metre | 2,003.40 |
| 33.27.1.8 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 240mts and upto 270 mts. Depth ending below ground level | Metre | 2,073.10 |
| 33.27.1.9 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 270mts and upto 300 mts. Depth ending below ground level | Metre | 2,119.00 |
| 33.27.1.10 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. - From 300mts and upto 330 mts. Depth ending below ground level | Metre | 2,169.90 |
| 33.27.1.11 | Drilling of borewell any where in UT of Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. - From 330mts and upto 360 mts. Depth ending below ground level | Metre | 2,215.80 |
| 33.27.2.1 | Reaming from 140/150 mm dia pilot bore to 300mm dia bore. Upto 60 mts depth ending below ground level | Metre | 385.70 |
| 33.27.2.2 | Reaming from 140/150 mm dia pilot bore to 300mm dia bore. From 60 mts and upto 90 mts depth ending from ground level | Metre | 409.50 |
| 33.27.2.3 | Reaming from 140/150 mm dia pilot bore to 300mm dia bore. From 90 mts and upto 120 mts depth ending from ground level | Metre | 436.70 |
| 33.27.2.4 | Reaming from 140/150 mm dia pilot bore to 300mm dia bore. From 120 mts and upto 150 mts depth ending from ground level | Metre | 443.50 |
| 33.27.2.5 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 150 mts and upto 180 mts depth ending from ground level | Metre | 463.90 |
| 33.27.2.6 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 180 mts and upto 210 mts depth ending from ground level | Metre | 487.70 |
| 33.27.2.7 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 210 mts and upto 240 mts depth ending from ground level | Metre | 509.80 |
| 33.27.2.8 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 240 mts and upto 270 mts depth ending from ground level | Metre | 528.50 |
| 33.27.2.9 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 270 mts and upto 300 mts depth ending from ground level | Metre | 557.40 |
| 33.27.2.10 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 300 mts and upto 330 mts depth ending from ground level | Metre | 579.40 |
| 33.27.2.11 | Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 300 mts and upto360 mts depth ending from ground level | Metre | 599.80 |
| 33.27.3.1 | Reaming from 200 mm dia pilot bore to 350mm dia bore. Upto 60 mts depth ending below ground level | Metre | 433.30 |
| 33.27.3.2 | Reaming from 200mm dia pilot bore to 350mm dia bore. From 60 mts and upto 90 mts depth ending below ground level | Metre | 458.80 |
| 33.27.3.3 | Reaming from 200mm dia pilot bore to 350mm dia bore. From 90 mts and upto 120 mts depth ending below ground level | Metre | 487.70 |
| 33.27.3.4 | Reaming from 200mm dia pilot bore to 350mm dia bore. From 120mts and upto 150 mts depth ending below ground level | Metre | 503.00 |
| 33.27.3.5 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 150 mts and upto 180 mts depth ending from ground level | Metre | 520.00 |
| 33.27.3.6 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 180 mts and upto 210 mts depth ending from ground level | Metre | 559.10 |
| 33.27.3.7 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 210 mts and upto 240 mts depth ending from ground level | Metre | 638.90 |
| 33.27.3.8 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 240 mts and upto 270 mts depth ending from ground level | Metre | 655.90 |
| 33.27.3.9 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 270 mts and upto 300 mts depth ending from ground level | Metre | 671.20 |
| 33.27.3.10 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 300 mts and upto 330 mts depth ending from ground level | Metre | 693.30 |
| 33.27.3.11 | Reaming from 200mm dia pilot bore to 350mm dia bore.From 330 mts and upto 360 mts depth ending from ground level | Metre | 710.30 |
| 33.27.4.1 | Reaming from 300 mm dia pilot bore to 400/450mm dia. Upto 60 mts depth ending below ground level | Metre | 594.70 |
| 33.27.4.2 | Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 60 mts and upto 90 mts depth ending below ground level | Metre | 666.10 |
| 33.27.4.3 | Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 90 mts and upto 120 mts depth ending below ground level | Metre | 710.30 |
| 33.27.4.4 | Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 120 mts and upto 150 mts depth ending below ground level | Metre | 752.80 |
| 33.27.4.5 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 150 mts and upto180 mts depth ending below ground level | Metre | 783.40 |
| 33.27.4.6 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 180 mts and upto210 mts depth ending below ground level | Metre | 805.40 |
| 33.27.4.7 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 210 mts and upto240 mts depth ending below ground level | Metre | 824.10 |
| 33.27.4.8 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 240 mts and upto270 mts depth ending below ground level | Metre | 863.20 |
| 33.27.4.9 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 270 mts and upto300 mts depth ending below ground level | Metre | 895.50 |
| 33.27.4.10 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 300 mts and upto330 mts depth ending below ground level | Metre | 939.70 |
| 33.27.4.11 | Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 330 mts and upto360 mts depth ending below ground level | Metre | 972.00 |
| 33.27.5 | Charges for developing the borewells with air compressor of 600 CFM capacity including transportation labour and fuel charges for compressor and conducting yield test by "V" Notch methods | Hour | 9,015.97 |
| 33.27.7 | Supplying of UPVC plain casing pipe for borewells conforming to I.S. 12818 -1992 with relevent amendments with class designation 'CM' and with minimum wall thickness 10mm including transportation and stocking at site -200mm dia | Metre | 3,512.50 |
| 33.27.8 | Supplying of UPVC ribbed screen slotted pipe for borewells conforming to IS 12818 -1992 with relevent amendments with class designation 'RS' and with minimum wall thickness 10mm including transportation and stocking at site - 200mm dia | Metre | 4,144.14 |
| 33.27.9 | Supplying of MS centering guide of size 25 mm x 3 mm thickness suitable for 200 mm UPVC pipe | Nos | 180.67 |
| 33.27.10 | Lowering of UPVC plain casing pipe/ribbed screen slotted pipes into the borewell including cost of cleaning material,fixing of M.S centering guide size of 25mm x 3mm thick suitable for 200mm dia UPVC pipe,including cost of labour for positioning of assembly for lowering purpose using rig | Nos | 155.08 |
| 33.27.11 | Supplying transportation and packing of 8mm size down gauge graded pebbles including filling the annular space gradually complete.The pebbles disintegrated pieces. should be free from any disintegrated pieces | Cum | 5,989.30 |
| 33.27.12 | Supplying, transporting and packing of clay balls including filling the annular space gradually complete. The clay balls should be free from any sand particles | Cum | 4,282.14 |
| 33.27.13 | Providing and fixing M.S. top cover suitable for UPVC pipes including the cost of materials and labour etc | Nos | 1,006.65 |
| 33.27.14 | Drilling 200mm dia borehole in hard rock formation by DTH method (Down the hole hammer) inside the already inserted 200mm UPVC casing pipe.The entire column is to be cleaned at site.The rate includes hire charges for the power rig for drilling the bores,the cost of fuel charges,transporting to and fro the power rig flushing the bore using compressor providing danger lights during night time etc.,complete | Metre | 1,187.04 |
| 33.27.16 | Providing and fixing of UPVC End Cap embedded in M.S. Cone suitable for UPVC casing pipe including the cost of materials and labour for jointing | Nos | 2,031.43 |
Other chapters in this schedule
- Earth Work (70)
- Concrete Work (72)
- Reinforced Concrete Work (131)
- Brick Work (57)
- Stone Work (50)
- Cladding Work (71)
- Wood and PVC Work (493)
- Steel Work (52)
- Flooring (91)
- Roofing (135)
- Finishing (114)
- Repairs To Buildings (108)
- Dismantling And Demolishing (85)
- Miscellaneous Building Work (25)
- Sanitary Installations (226)
- Water Supply (708)
- Drainage (135)
- Pile Work (31)
- Aluminium Work (41)
- Water Proofing (27)
- Rain Water Harvesting & TubeWells (37)
- Conservation of Heritage Buildings (7)
- Structural Glazing Aluminium Composite Panel (5)
- New Technologies and Materials (196)
- Irrigation (50)
- Water Supply (Public Health) (1012)
- Sewerage (Public Health) (213)
- OHT (Works) (8)
- Subsoil Exploration (7)
- Energy Conservation Building Code (137)
- Site Clearance and Dismantling (44)
- Earth Work, Erosion Control and Drainages (40)
- Granular Sub-base (63)
- Base & Bituminous Construction (26)
- Traffic Signs,Markings & Other Road Appurtenances (41)
- Pipe Culverts (5)
- Maintenance of Roads (13)
- Horticulture (25)
- Foundation (106)
- Substructure (54)
- Superstructure (97)
- River Training and Protection Works (10)
- Repair and Rehabilitation (12)
- PMGSY -Works (25)
Pricing miscellaneous (public health) against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works