Pipe Culverts rates

5 pipe culverts items from the Puducherry PWD, effective 2024-08-14.
Items
5
Lowest rate
₹5,826.22
Highest rate
₹16,257.25
Effective from
2024-08-14
S-01/RATE ITEMS5 ITEMS

Pipe Culverts rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹5,826.22 to ₹16,257.25. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 46 chapters
Unit

5 items. Scroll the table to browse

DescriptionUnit
9.1Plain cement concrete 1:3:6 mix with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 daysCum5,826.22
9.2ALaying reinforced cement concrete pipe Np4/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling,concrete and masonry works in head walls and parapets-1000mm diaMetre7,746.95
9.2BLaying reinforced cement concrete pipe Np4/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling,concrete and masonry works in head walls and parapets-1200mm diaMetre8,022.98
9.3ALaying reinforced cement concrete pipe Np4/ prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works back filling, concrete and masonry works in head walls and parapets - 1000mm. DiaMetre15,691.10
9.3BLaying reinforced cement concrete pipe Np4/ prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works back filling, concrete and masonry works in head walls and parapets - 1200mm. DiaMetre16,257.25
S-02/SOURCE RECORD2024-25
ISSUED BY
Puducherry PWD
EFFECTIVE
2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
RETRIEVED
2026-07-29
S-03/CHAPTERS44 MORE

Other chapters in this schedule

SHOW ALL 44 CHAPTERS
ARCHED / ESTIMATING

Pricing pipe culverts against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.