OHT (Works) rates
- Items
- 8
- Lowest rate
- ₹570.04
- Highest rate
- ₹1,623.63
- Effective from
- 2024-08-14
OHT (Works) rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹570.04 to ₹1,623.63. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.
8 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 34.1.1 | Providing two legged scaffolding using 15 cm diameter blue - gum posts or casurina posts or best quality bamboo - posts of 4m over all length (3.0m height + 0.5 m projection + 0.5 into the ground) the distance between the two rows being 1.25 m and the spacing of posts with 0.5 m overlap on either side and braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc in a complete form using coir and nails 1 m run (Rate of scaffolding for a height of 3 m and lenghth of 1 m) | Rmt | 611.69 |
| 34.1.2 | Exta for Providing two legged scaffolding for every additional height of 2.5 m (Rate for scaffolding for a height of 3 m and length of 1m) | Rmt | 570.04 |
| 34.2.1 | Centering and shuttering including struting, propping for 3m height and removal of form for floor slabs, roof slabs, landings, balconies and access platforms | Sqm | 1,569.43 |
| 34.2.2 | Centering and shuttering including, strutting, propping etc, and removal of form for foundations,footing, bases of columns etc | Sqm | 1,569.42 |
| 34.2.3 | Centering and shuttering including strutting, propping etc and removal of form for walls (any thickness) including attached pillastering, buttresses, plinth and string courses etc | Sqm | 1,596.52 |
| 34.2.4 | Centering and shuttering including strutting, propping etc and removal of form for lintels, beams, girders, bracers brussummers and cantilevers etc | Sqm | 1,569.42 |
| 34.2.5 | Centering and shuttering including strutting, propping etc and removal of form for columns, pillars, piers, abutments, posts and struts | Sqm | 1,623.63 |
| 34.2.6 | Centering and shuttering including strutting, propping etc and removal of form for vertical and horizontal firms individually or forming box louvers bund, fascias and lares boards | Sqm | 1,596.52 |
- ISSUED BY
- Puducherry PWD
- EFFECTIVE
- 2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Earth Work70
- Concrete Work72
- Reinforced Concrete Work131
- Brick Work57
- Stone Work50
- Cladding Work71
- Wood and PVC Work493
- Steel Work52
- Flooring91
- Roofing135
- Finishing114
- Repairs To Buildings108
SHOW ALL 44 CHAPTERS
- Dismantling And Demolishing85
- Miscellaneous Building Work25
- Sanitary Installations226
- Water Supply708
- Drainage135
- Pile Work31
- Aluminium Work41
- Water Proofing27
- Rain Water Harvesting & TubeWells37
- Conservation of Heritage Buildings7
- Structural Glazing Aluminium Composite Panel5
- New Technologies and Materials196
- Irrigation50
- Water Supply (Public Health)1012
- Sewerage (Public Health)213
- Miscellaneous (Public Health)71
- Subsoil Exploration7
- Energy Conservation Building Code137
- Site Clearance and Dismantling44
- Earth Work, Erosion Control and Drainages40
- Granular Sub-base63
- Base & Bituminous Construction26
- Traffic Signs,Markings & Other Road Appurtenances41
- Pipe Culverts5
- Maintenance of Roads13
- Horticulture25
- Foundation106
- Substructure54
- Superstructure97
- River Training and Protection Works10
- Repair and Rehabilitation12
- PMGSY -Works25
Pricing oht (works) against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.