Maintenance of Roads rates
- Items
- 13
- Lowest rate
- ₹2.01
- Highest rate
- ₹896.59
- Effective from
- 2024-08-14
Maintenance of Roads rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹2.01 to ₹896.59. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.
13 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 10.1 | Restoration of rain cuts with soil, murram gravel or a mixture of these clearing the loose soil benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammers, to restore the original alignment, levels and slopes | Cum | 896.59 |
| 10.2 | Making up loss of material/irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment | Sqm | 143.88 |
| 10.3 | Stripping excess soil from shoulder surface to achieve the approved level and compacting it with plate compactor | Sqm | 29.72 |
| 10.4 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and the base of excavation as per Clause 503, backfilling the pot - holes with hot bituminous material as per clause 511, compacting trimming and finishing the surface to form a smooth continuous surface, all as per Clause 3004.2 | Sqm | 149.88 |
| 10.5A | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and the base of excavation as per Clause 503, backfilling the pot - holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to form a smooth continuous surface, all as per Clause 3004.2 - Grading I - 19mm (Nominal Size) | Sqm | 385.60 |
| 10.5B | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and the base of excavation as per Clause 503, backfilling the pot - holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to form a smooth continuous surface, all as per Clause 3004.2 - Grading II - 13mm (Nominal Size) | Sqm | 383.84 |
| 10.6 | Filling of crack using slow curing bitumen emulsion and applying crusher dust in case cracks are wider than 3 mm | Rmt | 6.60 |
| 10.7 | Applying crusher dust to areas of road where bleeding of excess bitumen has occurred | Sqm | 2.01 |
| 10.9 | Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete | Rmt | 604.58 |
| 10.10 | Removal of existing sealant and re-sealing of contraction,longitudinal or expansion joints in concrete pavement with fresh sealant material | Rmt | 81.37 |
| 10.11 | Removal of earth from the choked hill side drain and disposing it on the valley side manually | Rmt | 114.09 |
| 10.12 | Clearance of landslides in soil and ordinary rock by a bull- dozer D 80 A-12 180HP and disposal of the same on the valley side | Cum | 50.98 |
| 10.13 | Clearing of landslide in hard rock requiring blasting for 50 percent of the boulders and disposal of the same on the valley side | Cum | 178.79 |
- ISSUED BY
- Puducherry PWD
- EFFECTIVE
- 2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Earth Work70
- Concrete Work72
- Reinforced Concrete Work131
- Brick Work57
- Stone Work50
- Cladding Work71
- Wood and PVC Work493
- Steel Work52
- Flooring91
- Roofing135
- Finishing114
- Repairs To Buildings108
SHOW ALL 44 CHAPTERS
- Dismantling And Demolishing85
- Miscellaneous Building Work25
- Sanitary Installations226
- Water Supply708
- Drainage135
- Pile Work31
- Aluminium Work41
- Water Proofing27
- Rain Water Harvesting & TubeWells37
- Conservation of Heritage Buildings7
- Structural Glazing Aluminium Composite Panel5
- New Technologies and Materials196
- Irrigation50
- Water Supply (Public Health)1012
- Sewerage (Public Health)213
- Miscellaneous (Public Health)71
- OHT (Works)8
- Subsoil Exploration7
- Energy Conservation Building Code137
- Site Clearance and Dismantling44
- Earth Work, Erosion Control and Drainages40
- Granular Sub-base63
- Base & Bituminous Construction26
- Traffic Signs,Markings & Other Road Appurtenances41
- Pipe Culverts5
- Horticulture25
- Foundation106
- Substructure54
- Superstructure97
- River Training and Protection Works10
- Repair and Rehabilitation12
- PMGSY -Works25
Pricing maintenance of roads against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.