Repair and Rehabilitation rates
- Items
- 12
- Lowest rate
- ₹91.23
- Highest rate
- ₹3,665.37
- Effective from
- 2024-08-14
Repair and Rehabilitation rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹91.23 to ₹3,665.37. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. For reference only: verify against the official source before pricing a bid.
12 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 16.1 | Removal of existing cement concrete wearing coat including its disposal complete as per technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m | Sqm | 193.60 |
| 16.2 | Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12mm thick mastic asphalt including disposal with all lift and lead upto 1000m | Sqm | 144.48 |
| 16.5A | Sealing of cracks / porous concrete by injection process through nipples/ grouting complete as per technical specifications- Cement grout | KG | 362.27 |
| 16.5B | Sealing of cracks / porous concrete by injection process through nipples / grouting complete as per technical specifications - cement mortar (1:1) grouting | KG | 406.63 |
| 16.7 | Sealing of crack / porous concrete with epoxy grout by injection through nipples complete as per clause 2803.1 | Sqm | 91.23 |
| 16.9 | Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, fine aggregate, coarse aggregates, water and quick setting compound in the proportion as per clause 2807.1, fine aggregate and coarse aggregates conforming to IS: 383 and Table 1 of IS: 9012 respectively, water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg / cum, strength not less than 25 Mpa and workmanship conforming to clause 2807.6 | Sqm | 419.30 |
| 16.11 | Epoxy bonding of new concrete to old concrete | Sqm | 659.00 |
| 16.17 | Replacement of expansion joints complete as per drawings | Rmt | 3,665.37 |
| 16.18 | Replacement of damaged concrete railing | Rmt | 687.15 |
| 16.19 | Replacement of crash barrier | Rmt | 1,329.03 |
| 16.20 | Replacement of damaged mild steel railing | Rmt | 558.77 |
| 16.21 | Repair of concrete crash barrier with cement concrete of M30 grade by cutting and trimming the damaged portion to a regular shape, cleaning the area to be repaired thorougly, applying cement concrete after erection of proper formwork | Rmt | 384.56 |
- ISSUED BY
- Puducherry PWD
- EFFECTIVE
- 2024-08-14From the Puducherry PWD website, which lists this schedule as "PSR 2024-25 (with effect from 14th August 2024 onwards)". The PDF itself prints no date anywhere in its 1,216 pages.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Earth Work70
- Concrete Work72
- Reinforced Concrete Work131
- Brick Work57
- Stone Work50
- Cladding Work71
- Wood and PVC Work493
- Steel Work52
- Flooring91
- Roofing135
- Finishing114
- Repairs To Buildings108
SHOW ALL 44 CHAPTERS
- Dismantling And Demolishing85
- Miscellaneous Building Work25
- Sanitary Installations226
- Water Supply708
- Drainage135
- Pile Work31
- Aluminium Work41
- Water Proofing27
- Rain Water Harvesting & TubeWells37
- Conservation of Heritage Buildings7
- Structural Glazing Aluminium Composite Panel5
- New Technologies and Materials196
- Irrigation50
- Water Supply (Public Health)1012
- Sewerage (Public Health)213
- Miscellaneous (Public Health)71
- OHT (Works)8
- Subsoil Exploration7
- Energy Conservation Building Code137
- Site Clearance and Dismantling44
- Earth Work, Erosion Control and Drainages40
- Granular Sub-base63
- Base & Bituminous Construction26
- Traffic Signs,Markings & Other Road Appurtenances41
- Pipe Culverts5
- Maintenance of Roads13
- Horticulture25
- Foundation106
- Substructure54
- Superstructure97
- River Training and Protection Works10
- PMGSY -Works25
Pricing repair and rehabilitation against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.