Puducherry SOR 2024-25
Dismantling And Demolishing rates
85 dismantling and demolishing items from the Puducherry PWD, effective 2024-08-14.
Dismantling And Demolishing rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹2.22 to ₹4,436.23. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.
85 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 15.1 | Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer-in-charge | Cum | 787.17 |
| 15.2.1 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. - Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | Cum | 2,319.77 |
| 15.2.2 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. - Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) | Cum | 1,411.93 |
| 15.3 | Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge | Cum | 3,454.76 |
| 15.4 | Demolishing R.B.work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge | Cum | 3,038.67 |
| 15.5 | Extra for cutting reinforcement bars manually / by mechanical means in R.C.C or R.B work (payment shall be made on the cross sectional area of R.C.C. or R.B.work) as per direction of Engineer-in-charge | Sqm | 1,091.17 |
| 15.6 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work | KG | 8.70 |
| 15.7.1 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in mud mortar | Cum | 637.79 |
| 15.7.2 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. - in lime mortar with old mughal bricks | Cum | 1,717.57 |
| 15.7.3 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres leadas per direction of Engineer-in-charge. - in lime mortar | Cum | 787.17 |
| 15.7.4 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortar | Cum | 1,903.69 |
| 15.8.1 | Removing mortar from bricks and cleaning bricks including stacking with in a lead of 50 m (stacks of cleaned bricks shall be measured) - From brick work in mud mortar | Nos | 4.47 |
| 15.8.2 | Removing mortar from bricks and cleaning bricks including stacking with in a lead of 50 m (stacks of cleaned bricks shall be measured) - From brick work in lime mortar | Nos | 5.28 |
| 15.8.3 | Removing mortar from bricks and cleaning bricks including stacking with in a lead of 50 m (stacks of cleaned bricks shall be measured) - From brick work in cement mortar | Nos | 6.71 |
| 15.9.1 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. - in lime mortar | Cum | 1,072.65 |
| 15.9.2 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortar | Cum | 2,279.72 |
| 15.10.1 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in lime mortar | Cum | 1,357.86 |
| 15.10.2 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. - in cement mortar | Cum | 2,674.52 |
| 15.11.1 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) - in lime mortar | Cum | 452.62 |
| 15.11.2 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) - in cement mortar | Cum | 666.73 |
| 15.12.1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead - of area 3 sqm and below | Each | 383.14 |
| 15.12.2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead - of area beyond 3 sq.metres | Each | 522.07 |
| 15.13.1 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead - of area 3 sqm and below | Each | 143.22 |
| 15.13.2 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead - of area beyond 3 sqm | Each | 188.01 |
| 15.14.1 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 metres span and 5 metres height including stacking the material within 50 metres lead - of sectional area 40 square centimetres and above | Cum | 4,434.37 |
| 15.14.2 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 metres span and 5 metres height including stacking the material within 50 metres lead - of sectional area below 40 square centimetres | Metre | 17.74 |
| 15.17.1 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in - R.S.joists | KG | 3.32 |
| 15.17.2 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in - channels,angles,tees and flats | KG | 2.22 |
| 15.18 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets,welding etc.including dismembering and stacking within 50 metres lead | KG | 5.48 |
| 15.19 | Dismantling steel work manually / by mechanical means in built up sections without distembering and stacking within 50 metres lead | KG | 3.86 |
| 15.22 | Extra for marking of structural steel work required to be re- erected | KG | 4.27 |
| 15.23.1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm | Sqm | 74.33 |
| 15.23.2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for thickness of tiles above 25 mm and upto 40 mm | Sqm | 119.92 |
| 15.24 | Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable matrial within 50 metres lead | Cum | 1,125.26 |
| 15.25 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 254.33 |
| 15.26 | Demolishing brick tile covering in terraching including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 110.99 |
| 15.27 | Demolishing mud phaska in terraching and disposal of material within 50 metres lead | Cum | 797.85 |
| 15.28.1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of - G.S.sheet | Sqm | 164.83 |
| 15.28.2 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of - Asbestos Cement sheet | Sqm | 77.08 |
| 15.29 | Dismantling stone slab roofing over wooden karries or R.C.C.battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Cum | 2,543.31 |
| 15.30 | Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 231.71 |
| 15.31 | Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 207.38 |
| 15.32 | Demolishing thatch roofing including mats, bamboo,jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 58.28 |
| 15.33 | Dismantling wooden ballies in posts and struts including stacking within 50metre lead | Metre | 19.22 |
| 15.34.1 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of - 'T' or 'L'iron or pipe | Each | 198.62 |
| 15.34.2 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of - R.C.C | Each | 198.88 |
| 15.35 | Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead | Each | 7.52 |
| 15.36 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead | KG | 37.44 |
| 15.37 | Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead | Sqm | 62.02 |
| 15.38 | Dismantling expanded metal or I.R.C fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead | Sqm | 71.88 |
| 15.39.1 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead - upto 10mm thick | Sqm | 56.45 |
| 15.39.2 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead - thickness above 10mm upto 25mm | Sqm | 72.00 |
| 15.39.3 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead - thickness above 25mm upto 40mm | Sqm | 82.80 |
| 15.40.1 | Dismantling precast concrete or stone slabs in walls, partion walls etc. including stacking within 50 metres lead - thickness upto 40mm | Sqm | 285.53 |
| 15.40.2 | Dismantling precast concrete or stone slabs in walls, partion walls etc. including stacking within 50 metres lead - thickness above 40mm upto 75mm | Sqm | 428.06 |
| 15.41 | Dismantling cement asbestos or other hard board ceiling or partion walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead | Sqm | 55.74 |
| 15.42.1 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead - 75 to 80mm dia pipe | Metre | 69.30 |
| 15.42.2 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead - 100 mm dia pipe | Metre | 71.13 |
| 15.42.3 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead - 150mm dia pipe | Metre | 72.93 |
| 15.43.1 | Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. - water bound macadam road | Sqm | 203.67 |
| 15.43.2 | Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge.- bituminous road | Sqm | 403.74 |
| 15.44.1 | Dismantling G.I.pipes (external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge.- 15mm to 40mm nominal bore | Metre | 133.24 |
| 15.44.2 | Dismantling G.I.pipes (external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge.- above 40mm nominal bore | Metre | 139.71 |
| 15.45.1 | Dismantling C.I.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge.- upto 150mm diametre | Metre | 322.57 |
| 15.45.2 | Dismantling C.I.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge.- above 150mm dia upto 300mm dia | Metre | 439.67 |
| 15.45.3 | Dismantling C.I.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge. - above 300mm diametre | Metre | 596.07 |
| 15.46.1 | Dismantling steel cylinder RC.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in- charge. - upto 600 mm diametre | Metre | 655.25 |
| 15.46.2 | Dismantling steel cylinder RC.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in- charge. - above 600 mm diametre | Metre | 1,643.69 |
| 15.47.1 | Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge.- upto 150mm diametre | Metre | 303.45 |
| 15.47.2 | Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge.- above 150mm diametre | Metre | 362.74 |
| 15.48 | Taking out C.I.cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually / by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge | Each | 668.26 |
| 15.49 | Taking out C.I.cover with frame from R.C.C top slab of inspection chambers of various sizes including demolishing of R.C.C.work manually / by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in- charge | Each | 388.53 |
| 15.50 | Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviseable materials within 50 metres lead | Each | 4,436.23 |
| 15.51 | Dismantling of road gully chamber of various sizes including C.I.grating with frame including stacking of useful materilas near the site and disposal of unserviceable matreials within 50 metres lead including refilling the excavated gap | Each | 885.70 |
| 15.52 | Dismantling of flushing cistern of all types (C.I / PVC / Vitrous china) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | Each | 118.30 |
| 15.53.1 | Dismantling of C.I.sluice valve including stacking of useful material within a lead of 50 metres - upto 150mm diametre | Each | 309.27 |
| 15.53.2 | Dismantling of C.I.sluice valve including stacking of useful material within a lead of 50 metres - above 150mm diametre | Each | 1,181.63 |
| 15.54 | Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead | Each | 732.66 |
| 15.55.1 | Dismantling of cement concrete platform along with curtain walls and base concrete etc.including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead - 120 x120 cm (outside to outside) | Each | 1,026.91 |
| 15.55.2 | Dismantling of cement concrete platform along with curtain walls and base concrete etc.including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead - 210 x120 cm (outside to outside) | Each | 1,579.09 |
| 15.55.3 | Dismantling of cement concrete platform along with curtain walls and base concrete etc.including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead - 320 x120 cm (outside to outside) | Each | 2,233.26 |
| 15.56 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead | Sqm | 52.47 |
| 15.57 | Dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead | Sqm | 55.74 |
| 15.58 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials upto a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars | Cum | 2,845.27 |
| 15.59 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometre | Cum | 457.52 |
Other chapters in this schedule
- Earth Work (70)
- Concrete Work (72)
- Reinforced Concrete Work (131)
- Brick Work (57)
- Stone Work (50)
- Cladding Work (71)
- Wood and PVC Work (493)
- Steel Work (52)
- Flooring (91)
- Roofing (135)
- Finishing (114)
- Repairs To Buildings (108)
- Miscellaneous Building Work (25)
- Sanitary Installations (226)
- Water Supply (708)
- Drainage (135)
- Pile Work (31)
- Aluminium Work (41)
- Water Proofing (27)
- Rain Water Harvesting & TubeWells (37)
- Conservation of Heritage Buildings (7)
- Structural Glazing Aluminium Composite Panel (5)
- New Technologies and Materials (196)
- Irrigation (50)
- Water Supply (Public Health) (1012)
- Sewerage (Public Health) (213)
- Miscellaneous (Public Health) (71)
- OHT (Works) (8)
- Subsoil Exploration (7)
- Energy Conservation Building Code (137)
- Site Clearance and Dismantling (44)
- Earth Work, Erosion Control and Drainages (40)
- Granular Sub-base (63)
- Base & Bituminous Construction (26)
- Traffic Signs,Markings & Other Road Appurtenances (41)
- Pipe Culverts (5)
- Maintenance of Roads (13)
- Horticulture (25)
- Foundation (106)
- Substructure (54)
- Superstructure (97)
- River Training and Protection Works (10)
- Repair and Rehabilitation (12)
- PMGSY -Works (25)
Pricing dismantling and demolishing against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works