85 dismantling and demolishing items from the Puducherry PWD, effective 2024-08-14.

Dismantling And Demolishing rates in the Puducherry Puducherry Schedule of Rates 2024-25 run from ₹2.22 to ₹4,436.23. Transcribed from Puducherry PWD — Puducherry Schedule of Rates 2024-25, Puducherry region. Base PDF only; PWD has since issued Correction Slip-3 (22 January 2025) for all four regions, so some rates here may be superseded.. Reference only — verify against the official source before pricing a bid.

85 items — scroll the table to browse

DescriptionUnit
15.1Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer-in-chargeCum787.17
15.2.1Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. - Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)Cum2,319.77
15.2.2Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. - Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)Cum1,411.93
15.3Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- chargeCum3,454.76
15.4Demolishing R.B.work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- chargeCum3,038.67
15.5Extra for cutting reinforcement bars manually / by mechanical means in R.C.C or R.B work (payment shall be made on the cross sectional area of R.C.C. or R.B.work) as per direction of Engineer-in-chargeSqm1,091.17
15.6Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. workKG8.70
15.7.1Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in mud mortarCum637.79
15.7.2Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. - in lime mortar with old mughal bricksCum1,717.57
15.7.3Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres leadas per direction of Engineer-in-charge. - in lime mortarCum787.17
15.7.4Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortarCum1,903.69
15.8.1Removing mortar from bricks and cleaning bricks including stacking with in a lead of 50 m (stacks of cleaned bricks shall be measured) - From brick work in mud mortarNos4.47
15.8.2Removing mortar from bricks and cleaning bricks including stacking with in a lead of 50 m (stacks of cleaned bricks shall be measured) - From brick work in lime mortarNos5.28
15.8.3Removing mortar from bricks and cleaning bricks including stacking with in a lead of 50 m (stacks of cleaned bricks shall be measured) - From brick work in cement mortarNos6.71
15.9.1Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. - in lime mortarCum1,072.65
15.9.2Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortarCum2,279.72
15.10.1Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in lime mortarCum1,357.86
15.10.2Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. - in cement mortarCum2,674.52
15.11.1Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) - in lime mortarCum452.62
15.11.2Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) - in cement mortarCum666.73
15.12.1Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead - of area 3 sqm and belowEach383.14
15.12.2Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead - of area beyond 3 sq.metresEach522.07
15.13.1Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead - of area 3 sqm and belowEach143.22
15.13.2Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead - of area beyond 3 sqmEach188.01
15.14.1Dismantling wood work in frames, trusses, purlins and rafters upto 10 metres span and 5 metres height including stacking the material within 50 metres lead - of sectional area 40 square centimetres and aboveCum4,434.37
15.14.2Dismantling wood work in frames, trusses, purlins and rafters upto 10 metres span and 5 metres height including stacking the material within 50 metres lead - of sectional area below 40 square centimetresMetre17.74
15.17.1Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in - R.S.joistsKG3.32
15.17.2Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in - channels,angles,tees and flatsKG2.22
15.18Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets,welding etc.including dismembering and stacking within 50 metres leadKG5.48
15.19Dismantling steel work manually / by mechanical means in built up sections without distembering and stacking within 50 metres leadKG3.86
15.22Extra for marking of structural steel work required to be re- erectedKG4.27
15.23.1Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for thickness of tiles 10mm to 25mmSqm74.33
15.23.2Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for thickness of tiles above 25 mm and upto 40 mmSqm119.92
15.24Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable matrial within 50 metres leadCum1,125.26
15.25Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm254.33
15.26Demolishing brick tile covering in terraching including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm110.99
15.27Demolishing mud phaska in terraching and disposal of material within 50 metres leadCum797.85
15.28.1Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of - G.S.sheetSqm164.83
15.28.2Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of - Asbestos Cement sheetSqm77.08
15.29Dismantling stone slab roofing over wooden karries or R.C.C.battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres leadCum2,543.31
15.30Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm231.71
15.31Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm207.38
15.32Demolishing thatch roofing including mats, bamboo,jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm58.28
15.33Dismantling wooden ballies in posts and struts including stacking within 50metre leadMetre19.22
15.34.1Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of - 'T' or 'L'iron or pipeEach198.62
15.34.2Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of - R.C.CEach198.88
15.35Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres leadEach7.52
15.36Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres leadKG37.44
15.37Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres leadSqm62.02
15.38Dismantling expanded metal or I.R.C fabrics with necessary battens and beading including stacking the serviceable material within 50 metres leadSqm71.88
15.39.1Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead - upto 10mm thickSqm56.45
15.39.2Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead - thickness above 10mm upto 25mmSqm72.00
15.39.3Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead - thickness above 25mm upto 40mmSqm82.80
15.40.1Dismantling precast concrete or stone slabs in walls, partion walls etc. including stacking within 50 metres lead - thickness upto 40mmSqm285.53
15.40.2Dismantling precast concrete or stone slabs in walls, partion walls etc. including stacking within 50 metres lead - thickness above 40mm upto 75mmSqm428.06
15.41Dismantling cement asbestos or other hard board ceiling or partion walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres leadSqm55.74
15.42.1Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead - 75 to 80mm dia pipeMetre69.30
15.42.2Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead - 100 mm dia pipeMetre71.13
15.42.3Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead - 150mm dia pipeMetre72.93
15.43.1Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. - water bound macadam roadSqm203.67
15.43.2Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge.- bituminous roadSqm403.74
15.44.1Dismantling G.I.pipes (external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge.- 15mm to 40mm nominal boreMetre133.24
15.44.2Dismantling G.I.pipes (external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge.- above 40mm nominal boreMetre139.71
15.45.1Dismantling C.I.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge.- upto 150mm diametreMetre322.57
15.45.2Dismantling C.I.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge.- above 150mm dia upto 300mm diaMetre439.67
15.45.3Dismantling C.I.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge. - above 300mm diametreMetre596.07
15.46.1Dismantling steel cylinder RC.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in- charge. - upto 600 mm diametreMetre655.25
15.46.2Dismantling steel cylinder RC.pipes including excavation and refilling trenches after taking out the pipes, manually / by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in- charge. - above 600 mm diametreMetre1,643.69
15.47.1Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge.- upto 150mm diametreMetre303.45
15.47.2Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge.- above 150mm diametreMetre362.74
15.48Taking out C.I.cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually / by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-chargeEach668.26
15.49Taking out C.I.cover with frame from R.C.C top slab of inspection chambers of various sizes including demolishing of R.C.C.work manually / by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in- chargeEach388.53
15.50Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviseable materials within 50 metres leadEach4,436.23
15.51Dismantling of road gully chamber of various sizes including C.I.grating with frame including stacking of useful materilas near the site and disposal of unserviceable matreials within 50 metres lead including refilling the excavated gapEach885.70
15.52Dismantling of flushing cistern of all types (C.I / PVC / Vitrous china) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres leadEach118.30
15.53.1Dismantling of C.I.sluice valve including stacking of useful material within a lead of 50 metres - upto 150mm diametreEach309.27
15.53.2Dismantling of C.I.sluice valve including stacking of useful material within a lead of 50 metres - above 150mm diametreEach1,181.63
15.54Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres leadEach732.66
15.55.1Dismantling of cement concrete platform along with curtain walls and base concrete etc.including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead - 120 x120 cm (outside to outside)Each1,026.91
15.55.2Dismantling of cement concrete platform along with curtain walls and base concrete etc.including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead - 210 x120 cm (outside to outside)Each1,579.09
15.55.3Dismantling of cement concrete platform along with curtain walls and base concrete etc.including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead - 320 x120 cm (outside to outside)Each2,233.26
15.56Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres leadSqm52.47
15.57Dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres leadSqm55.74
15.58Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials upto a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement barsCum2,845.27
15.59Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometreCum457.52

Pricing dismantling and demolishing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.