Skip to main content

Andhra Pradesh SOR 2026-27

Raceways and Junction Boxes rates

9 raceways and junction boxes items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.

Raceways and Junction Boxes rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹407.00 to ₹1,225.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. Reference only — verify against the official source before pricing a bid.

9 items — scroll the table to browse

DescriptionUnit
MAT-04199Supply of …………G I Raceways of 2mm thick with top cover and required hardware etc complete.100mm x 38mmMetre549.00
MAT-04200Supply of …………G I Raceways of 2mm thick with top cover and required hardware etc complete.150mm x 38mmMetre722.00
MAT-04201Supply of …………G I Raceways of 2mm thick with top cover and required hardware etc complete.300mm x 38mmMetre1,225.00
MAT-04202Supply of …………G I Raceways of 2mm thick with top cover and required hardware etc complete.100mm x 25mmMetre510.00
MAT-04203Supply of …………G I Raceways of 2mm thick with top cover and required hardware etc complete.150mm x 25mmMetre667.00
MAT-04204Supply of …………G I Raceways of 2mm thick with top cover and required hardware etc complete.300mm x 25mmMetre1,201.00
MAT-04205Supply of …………..G.I. Junction box of 2mm thick for direct acces to cables at the inter section of Raceways.172mm x 52mmNos407.00
MAT-04206Supply of …………..G.I. Junction box of 2mm thick for direct acces to cables at the inter section of Raceways.222mm x 52mmNos516.00
MAT-04207Supply of …………..G.I. Junction box of 2mm thick for direct acces to cables at the inter section of Raceways.372mm x 52mmNos959.00

Other chapters in this schedule

Pricing raceways and junction boxes against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works