Skip to main content
R/ANDHRA PRADESH SOR 2026-27

Dismantling rates

13 dismantling items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.
Items
13
Lowest rate
₹21.00
Highest rate
₹606.00
Effective from
2026-06-01
S-01/RATE ITEMS13 ITEMS

Dismantling rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹21.00 to ₹606.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 97 chapters
Unit

13 items. Scroll the table to browse

DescriptionUnit
BMT-S.01Stone masonry in cement mortarCum606.00
BMT-S.02Terracing work in roofs or floors10 Sqm256.00
BMT-S.03Flat stones in roof or floors including lifting10 Sqm222.00
BMT-S.04Pan tiled or Mangalore tiled roof without roof timbers10 Sqm186.00
BMT-S.05Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers10 Sqm222.00
BMT-S.06Wrought and framed timber in roofs or floorsCum321.00
BMT-S.07Old lime mortar plaster10 Sqm73.00
BMT-S.08Old cement mortar plaster10 Sqm91.00
BMT-S.09Dry rough stone revetment for aprons and stacking within 40 M leadCum110.00
BMT-S.10Revetment for aprons and stacking grouted within 40 leadCum80.00
BMT-S.12Through scraping of old plastered surface10 Sqm67.00
BMT-S.13Washing of plastered surface with soap, soda and water (or with soda lime and water)10 Sqm21.00
BMT-S.15Clean removal of cement plaster from walls and raking out joint 200 mm deep10 Sqm82.00
S-02/SOURCE RECORD2026-27
ISSUED BY
Board of Chief Engineers, Government of Andhra Pradesh
EFFECTIVE
2026-06-01Parts I, II and IV of the 2026-27 schedule — Water Resources, Roads & Bridges, and Public Health — are not reproduced here. See the official source for those.
RETRIEVED
2026-07-29
S-03/CHAPTERS88 MORE

Other chapters in this schedule

SHOW ALL 88 CHAPTERS
ARCHED / ESTIMATING

Pricing dismantling against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.