Andhra Pradesh SOR 2026-27

Man Holes & Inspection Chambers as per IS 4111 : Part 1 : 1986 rates

6 man holes & inspection chambers as per is 4111 : part 1 : 1986 items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.

Man Holes & Inspection Chambers as per IS 4111 : Part 1 : 1986 rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹3,673.00 to ₹10,169.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. Reference only — verify against the official source before pricing a bid.

6 items — scroll the table to browse

DescriptionUnit
BMW-B.01Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS 4111: Part1:1986 with cement mortar (1:6) prop usingflyash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specificationEach6,462.00
BMW-B.02Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS 4111: Part1:1986 with cement mortar (1:6) prop usingflyash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specificationEach10,169.00
BMW-B.03Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS 4111: Part1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specificationEach6,259.00
BMW-B.04Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS 4111: Part1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mmincluding plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental andoperational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specificationEach9,778.00
BMW-B.05Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 914.4 mm x 457.2 mm (3'0"x1'6") C.I frame andcover of 40 KgEach6,094.00
BMW-B.06Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame andcover of 20 KgEach3,673.00

Other chapters in this schedule

Pricing man holes & inspection chambers as per is 4111 : part 1 : 1986 against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works