Glass Materials rates

21 glass materials items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.
Items
21
Lowest rate
₹372.00
Highest rate
₹1,911.00
Effective from
2026-06-01
S-01/RATE ITEMS21 ITEMS

Glass Materials rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹372.00 to ₹1,911.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 97 chapters

21 items. Scroll the table to browse

DescriptionUnit
BMT-I.01Plain Float Glass 4 mm thickSqm479.00
BMT-I.02Plain Float Glass 5 mm thickSqm585.00
BMT-I.03Plain Float Glass 6 mm thickSqm735.00
BMT-I.04Plain Float Glass 8 mm thickSqm1,050.00
BMT-I.05Plain Float Glass 10 mm thickSqm1,218.00
BMT-I.06Plain Float Glass 12 mm thickSqm1,449.00
BMT-I.07Tinted - Bronze/ Green Glass 4 mm thickSqm620.00
BMT-I.08Tinted - Bronze/ Green Glass 5 mm thickSqm735.00
BMT-I.09Tinted - Bronze/ Green Glass 6 mm thickSqm876.00
BMT-I.10Tinted - Bronze/ Green Glass 8 mm thickSqm1,223.00
BMT-I.11Tinted - Bronze/ Green Glass 10 mm thickSqm1,533.00
BMT-I.12Tinted - Bronze/ Green Glass 12 mm thickSqm1,911.00
BMT-I.13Pin headed Glass 4 mm thickSqm372.00
BMT-I.14Pin headed Glass 5 mm thickSqm489.00
BMT-I.15Frosted / Ground Glass 4 mm thickSqm609.00
BMT-I.16Frosted / Ground Glass 5 mm thickSqm775.00
BMT-I.17Toughened Plain Glass 5 mm (including Glass)Sqm846.00
BMT-I.18Toughened Plain Glass 6 mm (including Glass)Sqm963.00
BMT-I.19Toughened Plain Glass 8 mm (including Glass)Sqm1,170.00
BMT-I.20Toughened Plain Glass 10 mm (including Glass)Sqm1,430.00
BMT-I.21Toughened Plain Glass 12 mm (including Glass)Sqm1,620.00
S-02/SOURCE RECORD2026-27
ISSUED BY
Board of Chief Engineers, Government of Andhra Pradesh
EFFECTIVE
2026-06-01Parts I, II and IV of the 2026-27 schedule — Water Resources, Roads & Bridges, and Public Health — are not reproduced here. See the official source for those.
RETRIEVED
2026-07-29
S-03/CHAPTERS88 MORE

Other chapters in this schedule

SHOW ALL 88 CHAPTERS
ARCHED / ESTIMATING

Pricing glass materials against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.