Porcelain Rewirable Fuse Units rates

6 porcelain rewirable fuse units items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.
Items
6
Lowest rate
₹161.00
Highest rate
₹1,678.00
Effective from
2026-06-01
S-01/RATE ITEMS6 ITEMS

Porcelain Rewirable Fuse Units rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹161.00 to ₹1,678.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 97 chapters

6 items. Scroll the table to browse

DescriptionUnit
MAT-02943Supply of …... Porcelain Rewireable Fuse Units. Makes: As per list of recommended brands.32A, 240VNos161.00
MAT-02944Supply of …... Porcelain Rewireable Fuse Units. Makes: As per list of recommended brands.32A, 415VNos240.00
MAT-02945Supply of …... Porcelain Rewireable Fuse Units. Makes: As per list of recommended brands.63A, 415VNos403.00
MAT-02946Supply of …... Porcelain Rewireable Fuse Units. Makes: As per list of recommended brands.100A, 415VNos835.00
MAT-02947Supply of……... Porcelain Rewireable Fuse Units with extension strip. Makes: As per list of recommended brands.200A, 415VNos1,366.00
MAT-02948Supply of……... Porcelain Rewireable Fuse Units with extension strip. Makes: As per list of recommended brands.300A, 415VNos1,678.00
S-02/SOURCE RECORD2026-27
ISSUED BY
Board of Chief Engineers, Government of Andhra Pradesh
EFFECTIVE
2026-06-01Parts I, II and IV of the 2026-27 schedule — Water Resources, Roads & Bridges, and Public Health — are not reproduced here. See the official source for those.
RETRIEVED
2026-07-29
S-03/CHAPTERS88 MORE

Other chapters in this schedule

SHOW ALL 88 CHAPTERS
ARCHED / ESTIMATING

Pricing porcelain rewirable fuse units against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.