Skip to main content
R/ANDHRA PRADESH SOR 2026-27

Legend Plates rates

8 legend plates items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.
Items
8
Lowest rate
₹33.00
Highest rate
₹583.00
Effective from
2026-06-01
S-01/RATE ITEMS8 ITEMS

Legend Plates rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹33.00 to ₹583.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 97 chapters

8 items. Scroll the table to browse

DescriptionUnit
MAT-04257Danger Notice Plates of size ---------------------, shall comply with IS:2551- 1982250x200mm,Nos292.00
MAT-04258Danger Notice Plates of size ---------------------, shall comply with IS:2551- 1982200x150mm,Nos259.00
MAT-04259Danger Notice Plates of size ---------------------, shall comply with IS:2551- 1982150x100mm,Nos129.00
ELEC-8.2.2Bus bar chamber 100mm x 40mmNos70.00
ELEC-8.2.3Cable Alley 100mm x 40mmNos70.00
ELEC-8.2.4Earth 40mm x 20mmNos65.00
ELEC-8.2.6Semi oval type aluminum anodized legend plates ON / OFF / Forward / Reverse / Start / Stop / UP / DOWN / R Phase / Y Phase / B Phase / Trip / Open / Close / Left / Right / Motor on / Motor off / Accept / Retract / Reset / Emergency / Running / Pump off / Emergency Stop / Emergency on / SlowNos33.00
ELEC-8.2.7Shock instruction chart in English / Hindi / Telugu duly framed with front glassNos583.00
S-02/SOURCE RECORD2026-27
ISSUED BY
Board of Chief Engineers, Government of Andhra Pradesh
EFFECTIVE
2026-06-01Parts I, II and IV of the 2026-27 schedule — Water Resources, Roads & Bridges, and Public Health — are not reproduced here. See the official source for those.
RETRIEVED
2026-07-29
S-03/CHAPTERS88 MORE

Other chapters in this schedule

SHOW ALL 88 CHAPTERS
ARCHED / ESTIMATING

Pricing legend plates against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.