Expansion Joint Fillers rates

11 expansion joint fillers items from the Board of Chief Engineers, Government of Andhra Pradesh, effective 2026-06-01.
Items
11
Lowest rate
₹14.00
Highest rate
₹810.00
Effective from
2026-06-01
S-01/RATE ITEMS11 ITEMS

Expansion Joint Fillers rates in the Andhra Pradesh Common Schedule of Rates — Part-III (Buildings, Water Supply & Electrical) 2026-27 run from ₹14.00 to ₹810.00. Transcribed from Government of Andhra Pradesh — Common Schedule of Rates 2026-27, Part-III (Buildings), Board of Chief Engineers. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 97 chapters
Unit

11 items. Scroll the table to browse

DescriptionUnit
BMT-U.01Supply of high performance expansion joint filler board conforming to M.O.S.T 18 mm THICKSqm420.00
BMT-U.02Supply of high performance expansion joint filler board conforming to M.O.S.T 20 mm THICKSqm583.00
BMT-U.03Supply of high performance expansion joint filler board conforming to M.O.S.T 25 mm THICKSqm810.00
BMT-U.04Supply of expansion joint filler board for buildings, columns, beams and slabs 20 mm THICKSqm305.00
BMT-U.05Supply of expansion joint filler board for buildings, columns, beams and slabs 25 mm THICKSqm376.00
BMT-U.06Supply of expansion joint filler board for buildings, columns, beams and slabs 50 mm THICKSqm757.00
BMT-U.07Supply of back up to cold applied sealant in construction and longitudinal joint 10 mm ODRm14.00
BMT-U.08Supply of back up to cold applied sealant in construction and longitudinal joint 12 mm ODRm16.00
BMT-U.09Supply of back up to cold applied sealant in construction and longitudinal joint 15 mm ODRm18.00
BMT-U.10Supply of back up to cold applied sealant in construction and longitudinal joint 20 mm ODRm25.00
BMT-U.11Supply of back up to cold applied sealant in construction and longitudinalRm31.00
S-02/SOURCE RECORD2026-27
ISSUED BY
Board of Chief Engineers, Government of Andhra Pradesh
EFFECTIVE
2026-06-01Parts I, II and IV of the 2026-27 schedule — Water Resources, Roads & Bridges, and Public Health — are not reproduced here. See the official source for those.
RETRIEVED
2026-07-29
S-03/CHAPTERS88 MORE

Other chapters in this schedule

SHOW ALL 88 CHAPTERS
ARCHED / ESTIMATING

Pricing expansion joint fillers against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.