Schedule of Rates

Ladakh Schedule of Rates 2024

2,449 rate items from the Ladakh Public Works (R&B), effective 2024-08-01. Searchable, with Excel and CSV download.

Department
Ladakh Public Works (R&B)
Edition
2024 — effective 2024-08-01
Items reproduced
2,449 across 29 chapters
Retrieved
2026-07-29

Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. Reference only — departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items that could not be transcribed unambiguously have been left out rather than guessed.

How to use the Ladakh Schedule of Rates

The ladakh schedule of rates sets the department's accepted rate for each item of work, and estimates for Ladakh government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹0.61 per sqm to ₹10,83,431.40 per cum, spanning 29 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which survives internal review and fails departmental scrutiny. And they miss that a rate is quoted for a different unit than the BOQ uses — a sqm rate applied to a cum quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works