Ladakh Schedule of Rates 2024
- Items reproduced
- 2,449
- Chapters
- 29
- Edition
- 2024
- Effective from
- 2024-08-01
- ISSUED BY
- Ladakh Public Works (R&B)
- EFFECTIVE
- 2024-08-01
- RETRIEVED
- 2026-07-29
Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.
Browse by chapter
2,449 items across 29 chapters. Each chapter is searchable and sortable.
- 01Earth work40
- 02Concrete Work59
- 03Reinforced Cement Concrete106
- 04Masonary Work50
- 05Stone Work43
- 06Cladding Work49
- 07Wood and PVC Work342
- 08Steel Work53
- 09Flooring Work110
- 10Roofing Work123
- 11Finishing Work134
- 12Repairs to Building82
- 13Dismantling and Demolishing60
- 14Road Work121
- 15Sanitary Installations210
- 16Water Supply399
- 17Drainage68
- 18Pile Work31
- 19Aluminium Work33
- 20Water Proofing25
- 21River and Canal Protection Work8
- 22Canal Lining Works31
- 23Slip Clearance5
- 24Rain Water Harvasting and Tube Wells37
- 25Conservation Of Heritage Building7
- 26Horticulture and Land Scaping31
- 27Structural Glazing Aluminium Composit Panel5
- 28New Technologies & Materials166
- 29Special Items for Ladakh21
How to use the Ladakh Schedule of Rates
The ladakh schedule of rates sets the department's accepted rate for each item of work, and estimates for Ladakh government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹0.61 per sqm to ₹10,83,431.40 per cum, spanning 29 chapters from earthwork through to finishing trades.
Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A sqm rate applied to a cum quantity is a large error that looks reasonable on a spreadsheet.
For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.
Pricing a live tender against this schedule
Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.