Ladakh SOR 2024
Dismantling and Demolishing rates
60 dismantling and demolishing items from the Ladakh Public Works (R&B), effective 2024-08-01.
Dismantling and Demolishing rates in the Ladakh Ladakh Schedule of Rates 2024 run from ₹2.95 to ₹5,689.25. Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. Reference only — verify against the official source before pricing a bid.
60 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 15.1 | Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-charge | Cum | 689.71 |
| 15.2.1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - chargeNominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | Cum | 1,974.16 |
| 15.2.2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - chargeNominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | Cum | 1,218.08 |
| 15.3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | Cum | 2,880.07 |
| 15.4 | Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge | Cum | 2,574.65 |
| 15.5 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge | Cum | 1,080.25 |
| 15.6 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work | KG | 8.21 |
| 15.7.1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn mud mortar | Cum | 571.22 |
| 15.7.2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn lime mortar with old mughal bricks | Cum | 1,443.06 |
| 15.7.3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn lime mortar | Cum | 689.71 |
| 15.7.4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn cement mortar | Cum | 1,668.74 |
| 15.8.1 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured)From brick work in mud mortar (rate is for 1000 Nos) | Nos | 3,852.80 |
| 15.8.2 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured)From brick work in lime mortar (rate is for 1000 Nos) | Nos | 4,509.86 |
| 15.8.3 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured)From brick work in cement mortar (rate is for 1000 Nos) | Nos | 5,689.25 |
| 15.9 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | Cum | 938.74 |
| 15.9.2 | In cement mortar | Cum | 1,991.43 |
| 15.10.1 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn lime mortar | Cum | 1,187.28 |
| 15.10.2 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn cement mort | Cum | 2,330.02 |
| 15.11.1 | Removing mortar from and cleaning stones and concrete articles (net quantity concrete articles (net quantity of stacks of cleaned materials will be measured)In lime mortar | Cum | 398.10 |
| 15.11.2 | Removing mortar from and cleaning stones and concrete articles (net quantity concrete articles (net quantity of stacks of cleaned materials will be measured)In cement mortar | Cum | 568.91 |
| 15.17.1 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead inR.S. Joists | KG | 2.95 |
| 15.30 | Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 206.31 |
| 15.31 | Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 170.75 |
| 15.32 | Demolishing thatch roofing including mats, bamboo, jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Sqm | 47.13 |
| 15.33 | Dismantling wooden ballies in posts and struts including stacking within 50metres lead | Metre | 16.97 |
| 15.34.1 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base ofT' or 'L' iron or pipe | Each | 206.28 |
| 15.34.2 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base ofR.C.C | Each | 228.51 |
| 15.35 | Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead | Each | 16.27 |
| 15.36 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead | KG | 29.83 |
| 15.37 | Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead | Sqm | 54.89 |
| 15.38 | Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead | Sqm | 64.51 |
| 15.39.1 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadUp to 10 mm thick | Sqm | 54.08 |
| 15.39.2 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadThickness above 10 mm up to 25 mm | Sqm | 69.15 |
| 15.39.3 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadThickness above 25 mm up to 40 mm | Sqm | 80.21 |
| 15.40.1 | Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres leadThickness up to 40 mm | Sqm | 241.04 |
| 15.40.2 | Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres leadThickness above 40 mm up to 75 mm | Sqm | 359.28 |
| 15.41 | Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead | Sqm | 51.66 |
| 15.42.1 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead75 to 80 mm dia pipe | Metre | 61.30 |
| 15.42.2 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead100 mm dia pipe | Metre | 63.25 |
| 15.42.3 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead150 mm dia pipe | Metre | 65.14 |
| 15.43.1 | Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeWater bound macadam road | Sqm | 179.04 |
| 15.44.1 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge15 mm to 40 mm nominal bore | Metre | 139.81 |
| 15.45.1 | Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-chargeUp to 150 mm diametre | Metre | 367.25 |
| 15.46.1 | Dismantling steel cylinder R.C. pipes excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in-chargeUp to 600 mm diametre | Metre | 596.13 |
| 15.47.1 | Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-chargeUp to 150 mm diametre | Metre | 268.94 |
| 15.48 | Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge | Each | 574.80 |
| 15.49 | Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer- incharge | Each | 336.59 |
| 15.50 | Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres lead | Each | 3,953.59 |
| 15.51 | Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap | Each | 785.91 |
| 15.52 | Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | Each | 811.03 |
| 15.53.1 | Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metresUp to 150 mm diametre | Each | 295.12 |
| 15.54 | Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead | Each | 655.16 |
| 15.55.1 | Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead120 x 120 cm (outside to outside) | Each | 894.39 |
| 15.55.2 | Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead210 x 120 cm (outside to outside) | Each | 1,592.05 |
| 15.55.3 | Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead320 x 120 cm (outside to outside) | Each | 1,941.64 |
| 15.56 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead | Sqm | 44.58 |
| 15.57 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and fal ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer-in-charge | Sqm | 51.68 |
| 15.58 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars | Cum | 2,630.27 |
| 15.59 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge | Cum | 379.28 |
| 15.60 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | Cum | 226.40 |
Other chapters in this schedule
- Earth work (40)
- Concrete Work (59)
- Reinforced Cement Concrete (106)
- Masonary Work (50)
- Stone Work (43)
- Cladding Work (49)
- Wood and PVC Work (342)
- Steel Work (53)
- Flooring Work (110)
- Roofing Work (123)
- Finishing Work (134)
- Repairs to Building (82)
- Road Work (121)
- Sanitary Installations (210)
- Water Supply (399)
- Drainage (68)
- Pile Work (31)
- Aluminium Work (33)
- Water Proofing (25)
- River and Canal Protection Work (8)
- Canal Lining Works (31)
- Slip Clearance (5)
- Rain Water Harvasting and Tube Wells (37)
- Conservation Of Heritage Building (7)
- Horticulture and Land Scaping (31)
- Structural Glazing Aluminium Composit Panel (5)
- New Technologies & Materials (166)
- Special Items for Ladakh (21)
Pricing dismantling and demolishing against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works