Ladakh SOR 2024
Conservation Of Heritage Building rates
7 conservation of heritage building items from the Ladakh Public Works (R&B), effective 2024-08-01.
Conservation Of Heritage Building rates in the Ladakh Ladakh Schedule of Rates 2024 run from ₹58.97 to ₹341.64. Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. Reference only — verify against the official source before pricing a bid.
7 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 28.1 | Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for re-pointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead | Sqm | 58.97 |
| 28.2 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works | Sqm | 330.21 |
| 28.4 | Providing and applying antifungal wash treatment using 3% solution of sodium pentachlorophenate, of reputed brand and manufacturer, on cleaned sand stone surface at desired locations as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 74.33 |
| 28.5 | Ruled / Flush pointing on Red sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime: 1.5 surkhi (50% red and 50% light yellow surkhi): 1/2 marble dust}. (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 341.64 |
| 28.6 | Ruled/ Flush pointing on White sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime: 1.5 surkhi (15% dark red and 85% light yellow surkhi): 1/2 marble dust}. (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 341.64 |
| 28.7 | Applying two or more coat of Ethyl Silicate chemical as approved by Archaeological Survey of India/ Engineer-in-charge, of approved brand and manufacturer, with brush or spray on the existing stone masonry surface till there is no further absorption of chemical by stone surface, including protecting the applied surface from direct sunlight by suitable means during application, all complete as per direction of the Engineer-in-Charge (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 325.91 |
| 28.8 | Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineerin- charge, of approved brand and manufacture, diluted with solvent mineral Turpentine oil in the ratio of 1:12 (One part of approved chemical:12 Part of Turpentine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials & labours involved except scaffolding) | Sqm | 118.60 |
Other chapters in this schedule
- Earth work (40)
- Concrete Work (59)
- Reinforced Cement Concrete (106)
- Masonary Work (50)
- Stone Work (43)
- Cladding Work (49)
- Wood and PVC Work (342)
- Steel Work (53)
- Flooring Work (110)
- Roofing Work (123)
- Finishing Work (134)
- Repairs to Building (82)
- Dismantling and Demolishing (60)
- Road Work (121)
- Sanitary Installations (210)
- Water Supply (399)
- Drainage (68)
- Pile Work (31)
- Aluminium Work (33)
- Water Proofing (25)
- River and Canal Protection Work (8)
- Canal Lining Works (31)
- Slip Clearance (5)
- Rain Water Harvasting and Tube Wells (37)
- Horticulture and Land Scaping (31)
- Structural Glazing Aluminium Composit Panel (5)
- New Technologies & Materials (166)
- Special Items for Ladakh (21)
Pricing conservation of heritage building against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works