21 special items for ladakh items from the Ladakh Public Works (R&B), effective 2024-08-01.
Special Items for Ladakh rates in the Ladakh Ladakh Schedule of Rates 2024 run from ₹328.15 to ₹17,780.88. Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. Reference only — verify against the official source before pricing a bid.
21 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 32.1 | Providing & fixing stabilized mud concrete solid blocks (adobe) with 3% cement, masonry up to floor five level including hoisting and setting in position in mud mortar using approved quality mud with carriage of material complete | Cum | 7,225.54 |
| 32.2 | Providing & fixing upto floor five level precast sun dried mud bricks in mud mortar using approved quality mud with carriage of material complete | Cum | 6,512.48 |
| 32.3.1 | Providing and laying in position rammed earth in walls (Upto floor One level)Providing and laying in position stabilized rammed earth with 8% cement in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work up to floor one level | Cum | 7,483.09 |
| 32.3.2 | Providing and laying in position rammed earth in walls (Upto floor One level)Providing and laying in position stabilized rammed earth with 5% cement in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work up to floor one level | Cum | 6,773.06 |
| 32.3.3 | Providing and laying in position rammed earth in walls (Upto floor One level)Providing and laying in position rammed earth in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work up to floor one level | Cum | 5,585.30 |
| 32.4.1 | Providing and laying in position rammed earth in walls (above floor two level upto floor five level)Providing and laying in position stabilized rammed earth with 8% cement in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work above floor two level upto floor five level | Cum | 8,439.56 |
| 32.4.2 | Providing and laying in position rammed earth in walls (above floor two level upto floor five level)Providing and laying in position stabilized rammed earth with 5% cement in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work above floor two level upto floor five level | Cum | 7,729.53 |
| 32.4.3 | Providing and laying in position rammed earth in walls (above floor two level upto floor five level)Providing and laying in position rammed earth in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work above floor two level upto floor five level | Cum | 6,541.77 |
| 32.5.1 | Providing and fixing round beams (local Ballies), including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete job;Average diameter 350 mm | Rmt | 1,119.42 |
| 32.5.2 | Providing and fixing round beams (local Ballies), including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete job;Average diameter 225 mm | Rmt | 999.92 |
| 32.6.1 | Providing and fixing traditionally carved wood work (Shingstak) over doors and windows including all accessories as per the direction of the Engineer in-charge, complete with;2nd class kail wood | Sqm | 17,780.88 |
| 32.6.2 | Providing and fixing traditionally carved wood work (Shingstak) over doors and windows including all accessories as per the direction of the Engineer in-charge, complete with;Local willow wood | Sqm | 15,878.55 |
| 32.6.3 | Providing and fixing traditionally carved wood work (Shingstak) over doors and windows including all accessories as per the direction of the Engineer in-charge, complete with;Budloo wood | Sqm | 16,712.26 |
| 32.7 | Providing and fixing local talboos (Second order branch willow tree) including providing an ornamental look and fixing with nails complete job | Sqm | 1,451.55 |
| 32.9 | Providing and laying 200mm thick mud pushka over talboos with 5mm thick dry grass (Yakzes/spoto/dry paddy straw etc), including ramming at OMC | Sqm | 665.79 |
| 32.10 | Providing & fixing brick masonry with cement mortar 1:6 up to floor five level with cured Cellular light weight bricks made of cement, sand and foaming agent with cement content @ 200 kg per Cubic Meter, including carriages complete | Cum | 17,466.94 |
| 32.11 | Providing & fixing upto floor five level compressed earth blocks (CEB) made an appropriate mix of dry inorganic subsoil, non-expansive clay, sand, and aggregate, in mud mortar, including cost of materials complete | Cum | 9,238.98 |
| 32.12 | Providing & fixing upto floor five level compressed stabilized earth blocks (CEB) made an appropriate mix of dry inorganic subsoil, non-expansive clay, sand, and aggregate with 5% cement as stabilizer, in mud mortar, including cost of materials complete | Cum | 10,427.24 |
| 32.13 | Disposal of accumulated snow from roads by mechanical means using loader and tipper/tractor | Cum | 328.15 |
| 32.14 | Providing & fixing stabilized mud concrete solid blocks (adobe) with 3% cement, masonry up to floor five level including hoisting and setting in position in cement mortar 1:6 using approved quality mud with carriage of material complete | Cum | 8,285.03 |
| 32.15 | Providing & fixing mud concrete solid blocks (adobe), masonry up to floor five level including hoisting and setting in position in mud mortar using approved quality mud with carriage of material complete | Cum | 6,512.48 |
Other chapters in this schedule
- Earth work (40)
- Concrete Work (59)
- Reinforced Cement Concrete (106)
- Masonary Work (50)
- Stone Work (43)
- Cladding Work (49)
- Wood and PVC Work (342)
- Steel Work (53)
- Flooring Work (110)
- Roofing Work (123)
- Finishing Work (134)
- Repairs to Building (82)
- Dismantling and Demolishing (60)
- Road Work (121)
- Sanitary Installations (210)
- Water Supply (399)
- Drainage (68)
- Pile Work (31)
- Aluminium Work (33)
- Water Proofing (25)
- River and Canal Protection Work (8)
- Canal Lining Works (31)
- Slip Clearance (5)
- Rain Water Harvasting and Tube Wells (37)
- Conservation Of Heritage Building (7)
- Horticulture and Land Scaping (31)
- Structural Glazing Aluminium Composit Panel (5)
- New Technologies & Materials (166)
Pricing special items for ladakh against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works