River and Canal Protection Work rates

8 river and canal protection work items from the Ladakh Public Works (R&B), effective 2024-08-01.
Items
8
Lowest rate
₹10.50
Highest rate
₹315.12
Effective from
2024-08-01
S-01/RATE ITEMS8 ITEMS

River and Canal Protection Work rates in the Ladakh Ladakh Schedule of Rates 2024 run from ₹10.50 to ₹315.12. Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 29 chapters
Unit

8 items. Scroll the table to browse

DescriptionUnit
23.13Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materialsSqm118.80
23.14Opening out old wire crates those and re-binding after fillingSqm45.45
23.15Tipping stone-filled wire crates in position; including equipment chargesCum315.12
23.16Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sandBag17.98
23.17Loading/Unloading sand/ earth filled bags in lorries; lead upto 50mBag13.74
23.18Loading sand / earth filled bags in boats; lead upto 50mBag10.50
23.19.1Unloading sand/earth filled bags from boatsPlacing in dryBag11.82
23.19.2Unloading sand/earth filled bags from boatsPlacing in WaterBag23.13
S-02/SOURCE RECORD2024
ISSUED BY
Ladakh Public Works (R&B)
EFFECTIVE
2024-08-01
RETRIEVED
2026-07-29
S-03/CHAPTERS28 MORE

Other chapters in this schedule

SHOW ALL 28 CHAPTERS
ARCHED / ESTIMATING

Pricing river and canal protection work against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.