R/LADAKH SOR 2024
Slip Clearance rates
5 slip clearance items from the Ladakh Public Works (R&B), effective 2024-08-01.
- Items
- 5
- Lowest rate
- ₹161.20
- Highest rate
- ₹734.98
- Effective from
- 2024-08-01
S-01/RATE ITEMS5 ITEMS
Slip Clearance rates in the Ladakh Ladakh Schedule of Rates 2024 run from ₹161.20 to ₹734.98. Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. For reference only: verify against the official source before pricing a bid.
/
5 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 26.1 | In ordinary soils disposal lead upto 50 m and lift upto 1.5 m | Cum | 161.20 |
| 26.2 | In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m | Cum | 329.46 |
| 26.3 | In soils; mixed with Decomposed Rocks; by blasting or any other means | Cum | 464.30 |
| 26.4 | In medium hard rocks; by blasting | Cum | 520.45 |
| 26.5 | In hard rocks; by blasting | Cum | 734.98 |
S-02/SOURCE RECORD2024
- ISSUED BY
- Ladakh Public Works (R&B)
- EFFECTIVE
- 2024-08-01
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS28 MORE
Other chapters in this schedule
- Earth work40
- Concrete Work59
- Reinforced Cement Concrete106
- Masonary Work50
- Stone Work43
- Cladding Work49
- Wood and PVC Work342
- Steel Work53
- Flooring Work110
- Roofing Work123
- Finishing Work134
- Repairs to Building82
SHOW ALL 28 CHAPTERS
- Dismantling and Demolishing60
- Road Work121
- Sanitary Installations210
- Water Supply399
- Drainage68
- Pile Work31
- Aluminium Work33
- Water Proofing25
- River and Canal Protection Work8
- Canal Lining Works31
- Rain Water Harvasting and Tube Wells37
- Conservation Of Heritage Building7
- Horticulture and Land Scaping31
- Structural Glazing Aluminium Composit Panel5
- New Technologies & Materials166
- Special Items for Ladakh21
ARCHED / ESTIMATING
Pricing slip clearance against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.