Ladakh SOR 2024
Stone Work rates
43 stone work items from the Ladakh Public Works (R&B), effective 2024-08-01.
Stone Work rates in the Ladakh Ladakh Schedule of Rates 2024 run from ₹75.11 to ₹2,15,070.92. Transcribed from UT of Ladakh, Public Works (R&B) Department — Ladakh Schedule of Rates (LSoR) 2024, Order No.58-LA-PW(R&B) of 2024 dated 24.07.2024, operative from 1 August 2024. Reference only — verify against the official source before pricing a bid.
43 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 7.1.1 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) upto plinth level withCement mortar 1:6 (1 cement: 6 coarse sand) | Cum | 6,761.86 |
| 7.2.1 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the likeCement mortar 1:6 (1 cement: 6 coarse sand) | Cum | 8,467.75 |
| 7.4.1 | Extra for random rubble masonry with hard stone inSquare or rectangular pillars | Cum | 965.56 |
| 7.5 | Extra for random rubble masonry with hard stone curved on plan for a mean radius not exceeding 6 m | Cum | 934.25 |
| 7.6.1 | Coursed rubble masonry (first sort) with hard stone in foundation and plinth withCement mortar 1:6 (1 cement: 6 coarse sand) | Cum | 8,210.02 |
| 7.7.1 | Coursed rubble masonry (second sort) with hard stone in foundation & plinth with: Cement mortar 1:6 (1 cement: 6 coarse sand) Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level | Cum | 7,596.01 |
| 7.8.1 | Masonry work (first sort), in cement mortar 1:6 (1 cement: 6 coarse sand) | Cum | 9,887.53 |
| 7.8.2 | Masonry work (second sort), in cement mortar 1:6 (1 cement: 6 coarse sand) | Cum | 9,273.69 |
| 7.10.1 | Extra for coursed rubble masonry with hard stone (first or second sort) inSquare or rectangular pillars | Cum | 1,079.72 |
| 7.10.2 | Extra for coursed rubble masonry with hard stone (first or second sort) inCircular pillars | Cum | 2,873.10 |
| 7.11 | Extra for coursed rubble masonry with hard stone (first or second sort) curved on plan for a mean radius not exceeding 6 m | Cum | 1,024.36 |
| 7.13.1A | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeExtra for using white cement Extra labour for lifting of material | Cum | 4,422.98 |
| 7.14.1.1 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 coarse sand) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — One face dressedRed sand stone | Cum | 1,39,997.54 |
| 7.14.1.2 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 coarse sand) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — One face dressedWhite sand stone | Cum | 1,58,695.25 |
| 7.14.2.1 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 coarse sand) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — Both face dressedRed sand stone | Cum | 1,96,107.18 |
| 7.14.2.2 | Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement: 3 coarse sand) including centering, shuttering and pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — Both face dressedWhite sand stone | Cum | 2,15,070.92 |
| 7.15.1.1 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — One face dressedRed sand stone | Cum | 86,933.69 |
| 7.15.1.2 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — One face dressedWhite sand stone | Cum | 1,04,298.11 |
| 7.15.2.1 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — Both faced punchedRed sand stone | Cum | 1,03,435.28 |
| 7.15.2.2 | Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade — Both faced punchedWhite sand stone | Cum | 1,22,399.03 |
| 7.16 | Extra for stone work, random rubble / coursed rubble masonry / ashlar masonry above floor V level for every four floors or part thereof | Cum | 1,692.94 |
| 7.17.1 | Extra for plain ashlar or ashlar punched inSquare or rectangular pillars | Cum | 3,509.29 |
| 7.18 | Extra for stone work; plain ashlar or ashlar punched curved on plan with a mean radius not exceeding 6 m | Cum | 2,441.24 |
| 7.19 | Extra for additional cost of centering for arches exceeding 6m span including all strutting, bolting, wedging etc. and removal (area of soffit to be measured) | Cum | 159.42 |
| 7.20.1 | Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeRed sand stone | Cum | 1,17,961.25 |
| 7.20.2 | Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeWhite sand stone | Cum | 1,36,925.00 |
| 7.21.1 | Extra for stone work ashlar sunk or moulded or sunk and moulded or carved inTriangular or Square or rectangular pillars | Cum | 4,577.33 |
| 7.21.2 | Extra for stone work ashlar sunk or moulded or sunk and moulded or carved inCircular or polygonal pillars | Cum | 12,969.11 |
| 7.24 | Extra for stone work (veneer work) curved on plan with a mean radius not exceeding 6 m | Cum | 2,552.21 |
| 7.26 | Providing and fixing stone dowels 10x5x2.50 cm cut to double wedge shape as per design in cement mortar 1:2 (1 cement: 2 coarse sand), including making the necessary chases | Cum | 75.11 |
| 7.29.1 | Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm projection in cement mortar 1:4 (1 cement: 4 coarse sand), including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeRed sand stone | Sqm | 1,871.24 |
| 7.29.2 | Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm projection in cement mortar 1:4 (1 cement: 4 coarse sand), including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeWhite sand stone | Cum | 1,922.45 |
| 7.31 | Providing and fixing red sand stone brackets 55x22.5x45 cm sunk and moulded including providing and fixing with 4 Nos gun metal cramp 25x6 mm 30 cm long | Cum | 7,907.89 |
| 7.32.1 | Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement: 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeRed sand stone | Cum | 89,072.59 |
| 7.32.2 | Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement: 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shadeWhite sand stone | Cum | 89,072.59 |
| 7.33.1 | Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement: 3 coarse sand), including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etcRed sand stone | Cum | 14,827.88 |
| 7.33.2 | Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement: 3 coarse sand), including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etcWhite sand stone | Cum | 14,874.83 |
| 7.34 | Extra for laying stone work in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. NOTE:- The quantity will be calculated by multiplying the depth measured from sub-soil water level up to the centre of gravity of stone work under sub - water with the quantity of stone work in cum executed under the sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1 m, 0.05 m or more shall be taken as 0.1 m and less than 0.05 m ignored | Metre | 914.13 |
| 7.35 | Extra for laying stone work in or under foul position | Cum | 386.99 |
| 7.38.1.1 | Stone tile work for wall lining upto 10 m height with special adhesive over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), including pointing in white cement with an admixture of pigment to match the stone shade — 8mm thick (mirror polished and machine cut edge)Granite stone of any colour and shade | Cum | 3,413.45 |
| 7.38.1.2 | Stone tile work for wall lining upto 10 m height with special adhesive over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), including pointing in white cement with an admixture of pigment to match the stone shade — 8mm thick (mirror polished and machine cut edge)Raj Nagar plain white marble/ Udaipur green marble/ Zebra black marble | Cum | 2,971.61 |
| 7.39.1 | Random rubble masonry with hard stone laid dry in foundation, plinth & wallsLaid without bond stone | Cum | 4,732.86 |
| 7.39.2 | Random rubble masonry with hard stone laid dry in foundation, plinth & wallsLaid with bond stone | Cum | 4,793.46 |
Other chapters in this schedule
- Earth work (40)
- Concrete Work (59)
- Reinforced Cement Concrete (106)
- Masonary Work (50)
- Cladding Work (49)
- Wood and PVC Work (342)
- Steel Work (53)
- Flooring Work (110)
- Roofing Work (123)
- Finishing Work (134)
- Repairs to Building (82)
- Dismantling and Demolishing (60)
- Road Work (121)
- Sanitary Installations (210)
- Water Supply (399)
- Drainage (68)
- Pile Work (31)
- Aluminium Work (33)
- Water Proofing (25)
- River and Canal Protection Work (8)
- Canal Lining Works (31)
- Slip Clearance (5)
- Rain Water Harvasting and Tube Wells (37)
- Conservation Of Heritage Building (7)
- Horticulture and Land Scaping (31)
- Structural Glazing Aluminium Composit Panel (5)
- New Technologies & Materials (166)
- Special Items for Ladakh (21)
Pricing stone work against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works