Maharashtra SOR 2022-23
Wood Finish rates
11 wood finish items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
Wood Finish rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹27.00 to ₹829.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.
/
11 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 34.01 | Providing and applying boiled linseed oil in one coat, to the new wood work, including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 27.00 |
| 34.02 | Providing and applying boiled linseed oil in two coats to the new wood work, including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 44.00 |
| 34.03 | Providing and applying Wax polish to the new wood work including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 56.00 |
| 34.04 | Providing and applying Wax polish to the old wood work including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 45.00 |
| 34.05 | Providing and applying French polish for required finish on previously polished wood including knotting, preparing the surfaces, scaffolding etc. complete as directed | Sqm | 123.00 |
| 34.06 | Providing and applying french polish to new wood work, for required finishing including. knotting, preparing the surfaces, scaffolding etc. complete as directed. | Sqm | 241.00 |
| 34.07 | Providing and applying varnish in one coat on previously varnished wood work including knotting, preparing the surface, scrapping, scaffolding, etc. complete. | Sqm | 41.00 |
| 34.08 | Providing and applying Varnish in two coats on new wood work including knotting, preparing the surface, scaffolding etc. Complete. | Sqm | 64.00 |
| 34.09 | Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping, applying French polish , scaffolding if required etc. complete. Note:The work to be executed on prior approval of Superintending Engineer will be necessary. | Sqm | 829.00 |
| 34.10 | Providing and applying coal tar in one coat on previously coal tarred wood including preparing the surface, scaffolding etc. complete. (coal tar shall be minimum 300 grams per One Square Metre.) | Sqm | 67.00 |
| 34.11 | Providing and applying coal tar in two coats on new wood work including preparing the surface, scaffolding etc. complete. (coal tar shall be minimum 500 grams per One Square Metre.) | Sqm | 105.00 |
Other chapters in this schedule
- Road Survey and DPR (76)
- Road Sub grade (36)
- Road Sub Base and Base Course (47)
- Road Surfacing Course (12)
- Rigid Pavement (23)
- Road Furniture (155)
- Road Miscellaneous items (34)
- Road Maintenance (39)
- Cross Drainage Works (28)
- Bridge Foundation and Sub Structure (40)
- Bridge : Bored Pile (51)
- Bridge Bearings (6)
- Bridge Super Structure (72)
- Bridge : Bored Pile New Item (18)
- Bridge Maintenance (19)
- Bridge : Well Foundation (24)
- Bridge sub structure and Foundation (28)
- Bored Pile, Well Foundation, sub & Super Structure (5)
- Arch Bridge (8)
- Bridge Repair New Item (46)
- Excavation (35)
- Pile Foundation: Building (57)
- Structural Steel Work (11)
- Plain Cement Concrete (9)
- Reinforced Cement Concrete (53)
- Brick Masonry (20)
- Stone Masonry (13)
- Concrete Block Masonry (9)
- Expansion Joint (11)
- Water Proofing (39)
- Plastering and Pointing (44)
- Paving Flooring and dado (78)
- Oil Painting (29)
- Colouring (25)
- Wood Work (26)
- Roofing and Ceiling (57)
- Roofing and Ceiling ( New Item) (16)
- Doors and Windows (110)
- Iron Work (12)
- Water Supply and Sanitary Fitting (213)
- Building Miscellaneous Item (23)
- Building Maintenance (57)
- Structural Strengthening (16)
- Flooring (7)
- Plumbing (19)
- Rain water harvesting (9)
- Others (7)
- Coastal (33)
- Block masonary (5)
- Road work (16)
- Accoustic (20)
- Furniture (39)
- PWD persons (28)
- Cubical Toilet (6)
- Building (7)
- bambusa bamboos item (7)
- Bridge repair (13)
- Rebar (29)
- New Item (18)
Pricing wood finish against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.