Wood Finish rates
11 wood finish items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
- Items
- 11
- Lowest rate
- ₹27.00
- Highest rate
- ₹829.00
- Effective from
- 2022-07-25
S-01/RATE ITEMS11 ITEMS
Wood Finish rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹27.00 to ₹829.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. For reference only: verify against the official source before pricing a bid.
/
11 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 34.01 | Providing and applying boiled linseed oil in one coat, to the new wood work, including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 27.00 |
| 34.02 | Providing and applying boiled linseed oil in two coats to the new wood work, including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 44.00 |
| 34.03 | Providing and applying Wax polish to the new wood work including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 56.00 |
| 34.04 | Providing and applying Wax polish to the old wood work including knotting, preparing the surface, scaffolding etc. complete as directed. | Sqm | 45.00 |
| 34.05 | Providing and applying French polish for required finish on previously polished wood including knotting, preparing the surfaces, scaffolding etc. complete as directed | Sqm | 123.00 |
| 34.06 | Providing and applying french polish to new wood work, for required finishing including. knotting, preparing the surfaces, scaffolding etc. complete as directed. | Sqm | 241.00 |
| 34.07 | Providing and applying varnish in one coat on previously varnished wood work including knotting, preparing the surface, scrapping, scaffolding, etc. complete. | Sqm | 41.00 |
| 34.08 | Providing and applying Varnish in two coats on new wood work including knotting, preparing the surface, scaffolding etc. Complete. | Sqm | 64.00 |
| 34.09 | Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping, applying French polish , scaffolding if required etc. complete. Note:The work to be executed on prior approval of Superintending Engineer will be necessary. | Sqm | 829.00 |
| 34.10 | Providing and applying coal tar in one coat on previously coal tarred wood including preparing the surface, scaffolding etc. complete. (coal tar shall be minimum 300 grams per One Square Metre.) | Sqm | 67.00 |
| 34.11 | Providing and applying coal tar in two coats on new wood work including preparing the surface, scaffolding etc. complete. (coal tar shall be minimum 500 grams per One Square Metre.) | Sqm | 105.00 |
S-02/SOURCE RECORD2022-23
- ISSUED BY
- Maharashtra Public Works Department (PWD)
- EFFECTIVE
- 2022-07-25
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS59 MORE
Other chapters in this schedule
- Road Survey and DPR76
- Road Sub grade36
- Road Sub Base and Base Course47
- Road Surfacing Course12
- Rigid Pavement23
- Road Furniture155
- Road Miscellaneous items34
- Road Maintenance39
- Cross Drainage Works28
- Bridge Foundation and Sub Structure40
- Bridge : Bored Pile51
- Bridge Bearings6
SHOW ALL 59 CHAPTERS
- Bridge Super Structure72
- Bridge : Bored Pile New Item18
- Bridge Maintenance19
- Bridge : Well Foundation24
- Bridge sub structure and Foundation28
- Bored Pile, Well Foundation, sub & Super Structure5
- Arch Bridge8
- Bridge Repair New Item46
- Excavation35
- Pile Foundation: Building57
- Structural Steel Work11
- Plain Cement Concrete9
- Reinforced Cement Concrete53
- Brick Masonry20
- Stone Masonry13
- Concrete Block Masonry9
- Expansion Joint11
- Water Proofing39
- Plastering and Pointing44
- Paving Flooring and dado78
- Oil Painting29
- Colouring25
- Wood Work26
- Roofing and Ceiling57
- Roofing and Ceiling ( New Item)16
- Doors and Windows110
- Iron Work12
- Water Supply and Sanitary Fitting213
- Building Miscellaneous Item23
- Building Maintenance57
- Structural Strengthening16
- Flooring7
- Plumbing19
- Rain water harvesting9
- Others7
- Coastal33
- Block masonary5
- Road work16
- Accoustic20
- Furniture39
- PWD persons28
- Cubical Toilet6
- Building7
- bambusa bamboos item7
- Bridge repair13
- Rebar29
- New Item18
ARCHED / ESTIMATING
Pricing wood finish against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.