Maharashtra SOR 2022-23
Stone Masonry rates
13 stone masonry items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
Stone Masonry rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹4,734.00 to ₹13,274.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.
/
13 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 28.01 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete. | Cum | 5,025.00 |
| 28.02 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:5 in basements including scaffolding, bailing out water manually, racking out joints when plastering is to be done striking joints where no pointing or plastering is to be done and watering etc.complete. | Cum | 5,157.00 |
| 28.03 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stone in cement mortar 1:3 in basement with patent water proofing compound added to it at rate of 1Kilogramper bag of cement including bailing out water manually, scaffolding racking out joints when plastering is to be done and watering etc. complete. | Cum | 5,530.00 |
| 28.04 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in superstructure including racking out joints when plastering is to be done / striking joints when no plastering is to be done on inside watering and scaffolding etc.complete. | Cum | 5,534.00 |
| 28.05 | Providing random rubble masonry second sort of trap / granite / quartzite / gneiss /jamba stones in cement mortar 1:6 in plinth including bailing out water manually , striking joints on unexposed faces. (Excluding pointing) etc.complete. | Cum | 4,734.00 |
| 28.06 | Providing random rubble masonry second sort of trap / granite / quartzite / gneiss /jamba stones in cement mortar 1:6 in superstructure racking out joints when plastering is to be done / striking joints when no pointing or plastering is to be done on the inside watering and scaffolding etc.complete. | Cum | 5,423.00 |
| 28.07 | Providing random rubble masonry first sort of trap / granite / quartzite / gneiss /jamba stones in cement mortar 1:6 in external walls of plinth including bailing out water manually , racking out joints when pointing is to be done and striking joints from inside including watering etc.complete. | Cum | 5,940.00 |
| 28.08 | Providing random rubble masonry first sort of trap /granite / quartzite / gneiss /jamba stones in cement mortar 1:6 in superstructure including bailing out water manually ,raking out joints from outside and striking joints when no pointing or plastering is to be done from inside watering and scaffolding etc.complete. | Cum | 6,288.00 |
| 28.09 | Providing coursed rubble masonry second sort of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in external walls of plinth including bailing out water manually , striking joints inside and raking out joints from outside and watering etc.complete | Cum | 11,703.00 |
| 28.10 | Providing coursed rubble masonry second sort of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in superstructure including raking out joints when plastering is to be done and striking joints when no plastering is to be done on the inside, watering scaffolding etc.complete. | Cum | 12,303.00 |
| 28.11 | Providing coursed rubble masonry first sort of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in external work of plinth including bailing out water manually, striking joints inside and watering etc.complete. | Cum | 12,427.00 |
| 28.12 | Providing coursed rubble masonry first sort of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in superstructure including racking out joints on the inside when plastering is to be done, watering and scaffolding etc. complete. | Cum | 13,274.00 |
| 28.13 | Providing coursed rubble masonry first sort for pillars of trap / granite / quartzite / gneiss stones in cement mortar 1:6 including pointing with cement mortar 1:3 scaffolding and watering etc.complete. | Cum | 12,485.00 |
Other chapters in this schedule
- Road Survey and DPR (76)
- Road Sub grade (36)
- Road Sub Base and Base Course (47)
- Road Surfacing Course (12)
- Rigid Pavement (23)
- Road Furniture (155)
- Road Miscellaneous items (34)
- Road Maintenance (39)
- Cross Drainage Works (28)
- Bridge Foundation and Sub Structure (40)
- Bridge : Bored Pile (51)
- Bridge Bearings (6)
- Bridge Super Structure (72)
- Bridge : Bored Pile New Item (18)
- Bridge Maintenance (19)
- Bridge : Well Foundation (24)
- Bridge sub structure and Foundation (28)
- Bored Pile, Well Foundation, sub & Super Structure (5)
- Arch Bridge (8)
- Bridge Repair New Item (46)
- Excavation (35)
- Pile Foundation: Building (57)
- Structural Steel Work (11)
- Plain Cement Concrete (9)
- Reinforced Cement Concrete (53)
- Brick Masonry (20)
- Concrete Block Masonry (9)
- Expansion Joint (11)
- Water Proofing (39)
- Plastering and Pointing (44)
- Paving Flooring and dado (78)
- Wood Finish (11)
- Oil Painting (29)
- Colouring (25)
- Wood Work (26)
- Roofing and Ceiling (57)
- Roofing and Ceiling ( New Item) (16)
- Doors and Windows (110)
- Iron Work (12)
- Water Supply and Sanitary Fitting (213)
- Building Miscellaneous Item (23)
- Building Maintenance (57)
- Structural Strengthening (16)
- Flooring (7)
- Plumbing (19)
- Rain water harvesting (9)
- Others (7)
- Coastal (33)
- Block masonary (5)
- Road work (16)
- Accoustic (20)
- Furniture (39)
- PWD persons (28)
- Cubical Toilet (6)
- Building (7)
- bambusa bamboos item (7)
- Bridge repair (13)
- Rebar (29)
- New Item (18)
Pricing stone masonry against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works