24 bridge : well foundation items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
- Items
- 24
- Lowest rate
- ₹683.00
- Highest rate
- ₹4,29,090.00
- Effective from
- 2022-07-25
S-01/RATE ITEMS24 ITEMS
Bridge : Well Foundation rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹683.00 to ₹4,29,090.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. For reference only: verify against the official source before pricing a bid.
/
Unit
24 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 17.05 | Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation for 8m dia. Well. Note:- For other well diameters rate can be worked out on the basis of cross-sectional area of well. The diameter of the island shall be in the conformity with clause 1203.2 of MoRTH a) For depth of water 1.0 m and height of island to be 1.25 m. (Well Diameter - 8m), ( Island Diameter- 16m) | Each | 94,766.00 |
| 17.06 | Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation for 8m dia. Well. Note:- For other well diameters rate can be worked out on the basis of cross-sectional area of well. The diameter of the island shall be in the conformity with clause 1203.2 of MoRTH b) For depth of water 4.0 m and height of island to be 4.50 m. (Well Diameter - 8m), ( Island Diameter- 16m) | Each | 4,29,090.00 |
| 17.07 | Sinking of 5 m Dia. well for foundation in hard strata (Hard Rock)/Boulder etc. which can be removed by grabing and chiselling soft disintegrated rock which requires special efforts, including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools and all materials available to sink through such strata including removal of obstacles and use of necessary plant and machinery, driver etc and proper setting of wells including all methods except pneumatic sinking (depth 0 to 5 Metres). Note : Add 1)30% Extra for 5 to 10 M depth 2)40% Extra for 10 to 15 M depth 3) 60% Extra for depth 15 M to 20 M 4) 100% Extra for depth above 20 M. | Rmt | 65,909.00 |
| 17.08 | Sinking of 6 m Dia. well for foundation in hard strata (Hard Rock)/Boulder etc. which can be removed by grabing and chiselling soft disintegrated rock which requires special efforts, including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools and all materials available to sink through such strata including removal of obstacles and use of necessary plant and machinery, driver etc and proper setting of wells including all methods except pneumatic sinking (depth 0 to 5 Metres). Note : Add 1)30% Extra for 5 to 10 M depth 2)40% Extra for 10 to 15 M depth 3) 60% Extra for depth 15 M to 20 M 4) 100% Extra for depth above 20 M. | Rmt | 1,00,707.00 |
| 17.09 | Sinking of 7 m Dia. well for foundation in hard strata (Hard Rock)/Boulder etc. which can be removed by grabing and chiselling soft disintegrated rock which requires special efforts, including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools and all materials available to sink through such strata including removal of obstacles and use of necessary plant and machinery, driver etc and proper setting of wells including all methods except pneumatic sinking (depth 0 to 5 Metres). Note : Add 1)30% Extra for 5 to 10 M depth 2)40% Extra for 10 to 15 M depth 3) 60% Extra for depth 15 M to 20 M 4) 100% Extra for depth above 20 M. | Rmt | 1,19,584.00 |
| 17.10 | Sinking of 8 m Dia. well for foundation in hard strata (Hard Rock)/Boulder etc. which can be removed by grabing and chiselling soft disintegrated rock which requires special efforts, including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools and all materials available to sink through such strata including removal of obstacles and use of necessary plant and machinery, driver etc and proper setting of wells including all methods except pneumatic sinking (depth 0 to 5 Metres). Note : Add 1)30% Extra for 5 to 10 M depth 2)40% Extra for 10 to 15 M depth 3) 60% Extra for depth 15 M to 20 M 4) 100% Extra for depth above 20 M. | Rmt | 1,67,261.00 |
| 17.11 | Sinking of 9 m Dia. well for foundation in hard strata (Hard Rock)/Boulder etc. which can be removed by grabing and chiselling soft disintegrated rock which requires special efforts, including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools and all materials available to sink through such strata including removal of obstacles and use of necessary plant and machinery, driver etc and proper setting of wells including all methods except pneumatic sinking (depth 0 to 5 Metres). Note : Add 1)30% Extra for 5 to 10 M depth 2)40% Extra for 10 to 15 M depth 3) 60% Extra for depth 15 M to 20 M 4) 100% Extra for depth above 20 M. | Rmt | 1,80,506.00 |
| 17.12 | Sinking of 10 m Dia. well for foundation in hard strata (Hard Rock)/Boulder etc. which can be removed by grabing and chiselling soft disintegrated rock which requires special efforts, including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools and all materials available to sink through such strata including removal of obstacles and use of necessary plant and machinery, driver etc and proper setting of wells including all methods except pneumatic sinking (depth 0 to 5 Metres). Note : Add 1)30% Extra for 5 to 10 M depth 2)40% Extra for 10 to 15 M depth 3) 60% Extra for depth 15 M to 20 M 4) 100% Extra for depth above 20 M. | Rmt | 1,99,726.00 |
| 17.13 | Providing and constructing one span service road 10m wide to reach island location. For 1 pier location to another pier location ( Depth of standing water 1 m) | Rmt | 5,613.00 |
| 17.14 | Providing and laying in situ / ready mix M-20 cement concrete Trap/ Granite/ Quartzite/ Gneiss metal for R.C.C. well curbs including necessary compacting by vibrating, finishing and curing complete. with fine agreegates of required specifications ( VSI sand finely washed etc ) (excluding reinforcement and including shuttering) A) With Batch Mix Plant With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,479.00 |
| 17.15 | Providing and laying in situ / ready mix M-25 cement concrete Trap/ Granite/ Quartzite/ Gneiss metal for R.C.C. well curbs including necessary compacting by vibrating, finishing and curing complete. with fine agreegates of required specifications ( VSI sand finely washed etc ) (excluding reinforcement and including shuttering) A) With Batch Mix Plant With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,726.00 |
| 17.16 | Providing and laying in situ / ready mix M-30 cement concrete Trap/ Granite/ Quartzite/ Gneiss metal for R.C.C. well curbs including necessary compacting by vibrating, finishing and curing complete. with fine agreegates of required specifications ( VSI sand finely washed etc ) (excluding reinforcement and including shuttering) A) With Batch Mix Plant With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,886.00 |
| 17.17 | Providing and laying in situ / ready mix M-35 cement concrete Trap/ Granite/ Quartzite/ Gneiss metal for R.C.C. well curbs including necessary compacting by vibrating, finishing and curing complete. with fine agreegates of required specifications ( VSI sand finely washed etc ) (excluding reinforcement and including shuttering) A) With Batch Mix Plant With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,973.00 |
| 17.18 | Providing and laying in situ / ready mix M-20 cement concrete trap / granite / quartizite / gneiss metal for the intermediate plug of wells in the dry or under water including compation by vibrating and curing wherever necessary etc complete with fine agreegates of required specifications ( VSI sand finely washed etc ) D) INTERMEDIATE PLUG With Batch Mix Plant, With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,055.00 |
| 17.19 | Providing and laying in situ / ready mix M-25 cement concrete trap / granite / quartizite / gneiss metal for the intermediate plug of wells in the dry or under water including compation by vibrating and curing wherever necessary etc complete with fine agreegates of required specifications ( VSI sand finely washed etc ) D) INTERMEDIATE PLUG With Batch Mix Plant, With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,131.00 |
| 17.20 | Providing and laying in situ / ready mix M-30 cement concrete trap / granite / quartizite / gneiss metal for the intermediate plug of wells in the dry or under water including compation by vibrating and curing wherever necessary etc complete with fine agreegates of required specifications ( VSI sand finely washed etc ) D) INTERMEDIATE PLUG With Batch Mix Plant, With fully automatic micro processor based PLC with SCADA enabled | Cum | 7,472.00 |
| 17.21 | Providing and laying in situ / ready mix M-25 cement concrete of trap / granite / quartzite/ gniess metal for top plug of wells including compaction by vibration and curing etc complete centering formwork shall be of steel/plywood B) With Batch Mix Plant With fully automatic micro processor based PLC with SCADA enabled, fine agreegates of required specifications ( VSI sand finely washed etc ) | Cum | 7,568.00 |
| 17.22 | Providing and laying in situ / ready mix M-30 cement concrete of trap / granite / quartzite/ gniess metal for top plug of wells including compaction by vibration and curing etc complete centering formwork shall be of steel/plywood B) With Batch Mix Plant With fully automatic micro processor based PLC with SCADA enabled fine agreegates of required specifications ( VSI sand finely washed etc ) | Cum | 7,668.00 |
| 17.23 | Providing and laying in situ / ready mix M-25 cement concrete of trap / granite / quartzite/ gniess metal for reinforced cement concrete well caps including necessary formwork compaction by vibrating finishing in CM 1:3 with fine agreegates of required specifications ( VSI sand finely washed etc ) etc complete (Excluding reinforcement) A) Well Cap (With with reversible drum type mixer/ concrete batch mix plant (pan mixer) . | Cum | 7,664.00 |
| 17.24 | Providing and laying in situ / ready mix M-30 cement concrete of trap / granite / quartzite/ gniess metal for reinforced cement concrete well caps including necessary formwork compaction by vibrating finishing in CM 1:3 with fine agreegates of required specifications ( VSI sand finely washed etc ) etc complete (Excluding reinforcement) A) Well Cap (With with reversible drum type mixer/ concrete batch mix plant (pan mixer) . | Cum | 7,810.00 |
| 17.25 | Providing and laying in situ / ready mix M-35 cement concrete of trap / granite / quartzite/ gniess metal for reinforced cement concrete well caps including necessary formwork compaction by vibrating finishing in CM 1:3 with fine agreegates of required specifications ( VSI sand finely washed etc ) etc complete (Excluding reinforcement) A) Well Cap (With with reversible drum type mixer/ concrete batch mix plant (pan mixer) . | Cum | 7,589.00 |
| 17.26 | Providing Sump pit in hard strata in wells as diercted or as shown in drawing including shoring and strutting as necessary and disposing of excavted stuff | Cum | 4,450.00 |
| 17.27 | Providing and filling in well with sand/ rubble and sand/ shingle and sand including compacting between the top and bottom plugs etc. Complete | Cum | 1,822.00 |
| 17.66 | Chipping and dressing of the R.C.C. piles upto 0.60 meter including cleaning reinforcement and removal of dismantled materials upto a distance of 50 meter beyond the building area etc. for providing pile caps. | Each | 683.00 |
S-02/SOURCE RECORD2022-23
- ISSUED BY
- Maharashtra Public Works Department (PWD)
- EFFECTIVE
- 2022-07-25
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS59 MORE
Other chapters in this schedule
- Road Survey and DPR76
- Road Sub grade36
- Road Sub Base and Base Course47
- Road Surfacing Course12
- Rigid Pavement23
- Road Furniture155
- Road Miscellaneous items34
- Road Maintenance39
- Cross Drainage Works28
- Bridge Foundation and Sub Structure40
- Bridge : Bored Pile51
- Bridge Bearings6
SHOW ALL 59 CHAPTERS
- Bridge Super Structure72
- Bridge : Bored Pile New Item18
- Bridge Maintenance19
- Bridge sub structure and Foundation28
- Bored Pile, Well Foundation, sub & Super Structure5
- Arch Bridge8
- Bridge Repair New Item46
- Excavation35
- Pile Foundation: Building57
- Structural Steel Work11
- Plain Cement Concrete9
- Reinforced Cement Concrete53
- Brick Masonry20
- Stone Masonry13
- Concrete Block Masonry9
- Expansion Joint11
- Water Proofing39
- Plastering and Pointing44
- Paving Flooring and dado78
- Wood Finish11
- Oil Painting29
- Colouring25
- Wood Work26
- Roofing and Ceiling57
- Roofing and Ceiling ( New Item)16
- Doors and Windows110
- Iron Work12
- Water Supply and Sanitary Fitting213
- Building Miscellaneous Item23
- Building Maintenance57
- Structural Strengthening16
- Flooring7
- Plumbing19
- Rain water harvesting9
- Others7
- Coastal33
- Block masonary5
- Road work16
- Accoustic20
- Furniture39
- PWD persons28
- Cubical Toilet6
- Building7
- bambusa bamboos item7
- Bridge repair13
- Rebar29
- New Item18
ARCHED / ESTIMATING
Pricing bridge : well foundation against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.