R/MAHARASHTRA SOR 2022-23
Concrete Block Masonry rates
9 concrete block masonry items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
- Items
- 9
- Lowest rate
- ₹996.00
- Highest rate
- ₹7,765.00
- Effective from
- 2022-07-25
S-01/RATE ITEMS9 ITEMS
Concrete Block Masonry rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹996.00 to ₹7,765.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. For reference only: verify against the official source before pricing a bid.
/
Unit
9 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 29.01 | Providing and laying masonry of I.S. Standard C.C. hollow block 100 x 200 x 400 mm with 100mm thick in cement mortar 1:6 proportion for superstructure including curing, scaffolding etc. complete. | Sqm | 1,231.00 |
| 29.02 | Providing and laying masonry of I.S. Standard C.C. hollow block 200 x 200 x 400 with 200mm thick mm in cement mortar 1:6 proportion for superstructure including curing, scaffolding etc. complete. | Sqm | 1,332.00 |
| 29.03 | Providing and constructing masonry in precast solid Concrete Block (Grade D-50 As per I.S. 2185, Part-I, 1974, Reframed 1987) having compressive strength 5-00 N/mm2) of size (300 mm x 200 mm x 150mm) in cement mortar 1:6 for superstructure including striking joints on unexposed faces, racking out joints on exposed faces, watering, curing and scaffolding etc. complete. | Cum | 7,638.00 |
| 29.04 | Providing and constructing masonry in Autoclaved Areaclaved ( Celluar) Concrete Block of aproved manufacturer confirming to IS 2185 Part III 1984 of size ( 625x240x225)mm in extra fine jointing mortar of fixoblock of in foundaions and plinth of inner walls/in plinth external walls including bailing out water,striking joints on unexposed faces,racking out joints on exposed faces and watering etc.complete | Cum | 7,682.00 |
| 29.05 | Providing and constructing masonry in Autoclaved Areaclaved ( Celluar) Concrete Block of aproved manufacturer confirming to IS 2185 Part III 1984 of size ( 625x240x225)mm in extra fine jointing mortar of fixoblock of in superstucture including,striking joints,racking out joints watering and scaffolding etc.complete | Cum | 7,765.00 |
| 29.06 | Providing and constructing masonry in Autoclaved Areaclaved (Celluar) Concrete Block of aproved manufacturer confirming to IS 2185 Part III 1984 of size (625x 240x100)mm in extra fine jointing mortar of fixoblock of in half brick thick wall including 2 hoop iron strips 25mm x 1.6mm at every third course,properly bend and bonded at ends scaffolding racking out joints and watering compete | Sqm | 996.00 |
| 29.11 | Providing Green Build Product (GBP) Build Fast Plus masonry ecofriendly wet mix /Blocks laying Adhesive is a pre-polymerized, wet mix jointing adhesive which is suitable for Building masonry walls with all kind of blocks with thickness of thin layer of 2mm to 4mm between masonry units. There is no need to pre-wet the Blocks nor to post cure the wall with water.Confirming to IS 2185 of size 75 x 240x 650 mm in superstructure including striking joints, racking outjoints faces and scaffolding etc. complete. | Sqm | 1,551.00 |
| 29.12 | Providing Green Build Product (GBP) Build Fast Plus masonry ecofriendly wet mix /Blocks of size 100 X 240 x 650 mm laying Adhesive is a pre-polymerized, wet mix jointing adhesive which is suitable for Building masonry walls with all kind of blocks with thickness of thin layer of 2mm to 4mm between masonry units. There is no need to pre-wet the Blocks nor to post cure the wall with water.Confirming to IS 2185 of size in superstructure including striking joints, racking out joints faces and scaffolding etc. complete. | Sqm | 1,757.00 |
| 29.13 | Providing Green Build Product (GBP) Build Fast Plus masonry ecofriendly wet mix /Blocks of size 200 X 240 x 650 mm laying Adhesive is a pre-polymerized, wet mix jointing adhesive which is suitable for Building masonry walls with all kind of blocks with thickness of thin layer of 2mm to 4mm between masonry units. There is no need to pre-wet the Blocks nor to post cure the wall with water.Confirming to IS 2185 of size in superstructure including striking joints, racking out joints faces and scaffolding etc. complete. | Sqm | 2,795.00 |
S-02/SOURCE RECORD2022-23
- ISSUED BY
- Maharashtra Public Works Department (PWD)
- EFFECTIVE
- 2022-07-25
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS59 MORE
Other chapters in this schedule
- Road Survey and DPR76
- Road Sub grade36
- Road Sub Base and Base Course47
- Road Surfacing Course12
- Rigid Pavement23
- Road Furniture155
- Road Miscellaneous items34
- Road Maintenance39
- Cross Drainage Works28
- Bridge Foundation and Sub Structure40
- Bridge : Bored Pile51
- Bridge Bearings6
SHOW ALL 59 CHAPTERS
- Bridge Super Structure72
- Bridge : Bored Pile New Item18
- Bridge Maintenance19
- Bridge : Well Foundation24
- Bridge sub structure and Foundation28
- Bored Pile, Well Foundation, sub & Super Structure5
- Arch Bridge8
- Bridge Repair New Item46
- Excavation35
- Pile Foundation: Building57
- Structural Steel Work11
- Plain Cement Concrete9
- Reinforced Cement Concrete53
- Brick Masonry20
- Stone Masonry13
- Expansion Joint11
- Water Proofing39
- Plastering and Pointing44
- Paving Flooring and dado78
- Wood Finish11
- Oil Painting29
- Colouring25
- Wood Work26
- Roofing and Ceiling57
- Roofing and Ceiling ( New Item)16
- Doors and Windows110
- Iron Work12
- Water Supply and Sanitary Fitting213
- Building Miscellaneous Item23
- Building Maintenance57
- Structural Strengthening16
- Flooring7
- Plumbing19
- Rain water harvesting9
- Others7
- Coastal33
- Block masonary5
- Road work16
- Accoustic20
- Furniture39
- PWD persons28
- Cubical Toilet6
- Building7
- bambusa bamboos item7
- Bridge repair13
- Rebar29
- New Item18
ARCHED / ESTIMATING
Pricing concrete block masonry against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.