Maharashtra SOR 2022-23
Road Maintenance rates
39 road maintenance items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
Road Maintenance rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹8.00 to ₹8,939.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.
/
39 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 8.01 | Labour for filling pot holes with premix asphalt chips, cleaning the road surface with wire brushes and gunny bags, applying tack coat, spreading mixture hand ramming or light compaction with power roller conveying material to the site of work (excluding cost and of material fuel and heating asphalt) etc complete. | Sqm | 73.00 |
| 8.02 | Labour for metal patch repairs including preparing surface, adding required quantity of metal, murum, watering, ramming etc complete. Spec.No.: As directed by Engineer- in- charge. (excluding cost and of material ) | Sqm | 94.00 |
| 8.03 | Restoration of rain cuts with soil, murum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORTH specification clause 3002 | Cum | 199.00 |
| 8.04 | Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC as per MORTH specification clause 3003 | Sqm | 52.00 |
| 8.05 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings as per MORTH specification clause 3003 | Sqm | 21.00 |
| 8.06 | Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method filled with 75mm B.M, applying bitumen tack coat at the bottom and vertical sides as per as per MORTH specification clause 3004.1 and 3004.2 | Cum | 8,939.00 |
| 8.07 | Patch repair on already filled pot holes with 20 mm premix carpet and seal coat as per MORTH specification clause 3004.1 and 3004.2 | Sqm | 230.00 |
| 8.08 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat as per MORTH specification clause 3004.1 and 3004.2 | Sqm | 342.00 |
| 8.09 | Maintenance of gravel road including making up the loss of profile, rectifying corrugated surface, filling up of depressions, pot holes and erosion gullies by adding fresh material and compacting it with appropriate equipment or to strip excess of material from the road surface as per drawings etc complete | Sqm | 104.00 |
| 8.10 | Providing pick and roll surface by picking the old WBM surface to the required standard, adding 30% of 40mm size metal and required quantity of murum including laying sectioning, watering, compacting with static roller with thin layer of murum blindage on carrageway, watering and compacting by static roller, including cost of all materials, loading, unloading, stacking and labour etc. complete. Spec.No. : As directed by Engineer- in-charge. | Sqm | 115.00 |
| 8.11 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling etc. complete | Sqm | 250.00 |
| 8.12 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains etc. complete | Rmt | 18.00 |
| 8.13 | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing etc. complete | Each | 2,423.00 |
| 8.14 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings etc. complete | KM | 4,798.00 |
| 8.15 | Maintenance of Kilometer stones, and 200 metre by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone etc. complete | KM | 1,086.00 |
| 8.16 | Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location etc. complete | Each | 258.00 |
| 8.17 | Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. complete | Sqm | 8.00 |
| 8.18 | Maintenance of guard stones/ boundry stones/ indicator stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and white washing etc. complete | KM | 1,081.00 |
| 8.19 | Repair of steel railing to bring it to original shape cleaning and repainting as per drawing etc. complete | Rmt | 435.00 |
| 8.20 | Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings etc. complete | Rmt | 835.00 |
| 8.21 | Removal of steel railing and refixing of railing to submersible bridges including cleaning and repainting etc complete | Rmt | 506.00 |
| 8.22 | White washing two coats on parapet walls and white washing and geru lime painting to tree trunks including preparation of surface by cleaning scraping etc. complete | Sqm | 26.00 |
| 8.23 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge. | Sqm | 10.00 |
| 8.24 | Providing and Laying Pressure Sensitive Technology ( PST ) based Insstapattch ready mix compound for repair potholes, manufactured from aggregates of 4-12 mm, treated with special grade bitumen, Pressure Sensitive Polymer( PSP) and Cross Linking Chemical (CLC) agents etc, technically evaluated for repairs on bitumenous/concrete surfaces, confirming to CRRI and IRC accreduted norms for pressure sensitive polymer products for repairs of Potholes on road/ Pavements, havinfg upto 25mm thick insstapattch layer on base of compacted aggregates ( Crusher Brocken ) of 50mm thickness including labours, material, tools and tampering etc complete. | Sqm | 938.00 |
| 8.25 | Providing, laying and rolling Micro seal surfacing ( 10 mm thick ) for preventive maintainance including supplying all materials , preparing the existing road surface , heating bitumen , aggregates , lime in hot mix plant , laying the mix seal surfacing by paver finisher and compaction by power roller etc complete.( Using 60/70 bulk bitumen for mixing and tack coat over black topped surface by using 0.14 Cum per 10 Sqm. of crusher aggregate passing 100 % through 6.30 mm sieve and retained100 % on 0.075 mm size sieve 0.2 Kg / Sqm lime and 11.00 kg / 10 Sqm bulk bitumen for fixing and 0.50 kg / Sqm for tack coat ) Spec: As directed by Engineer In Charge and IRC SP 78 - 2008 | Sqm | 136.00 |
| 8.26 | Providing, laying and rolling Micro seal surfacing ( 10 mm thick ) for preventive maintainance including supplying all materials , preparing the existing road surface , heating bitumen , aggregates , lime in hot mix plant , laying the mix seal surfacing by paver finisher and compaction by power roller etc complete.( Using 60/70 bulk bitumen for mixing and tack coat over black topped surface by using 0.14 Cum per 10 Sqm. of crusher aggregate passing 100 % through 9.50 mm sieve and retained100 % on 0.075 mm size sieve 0.2 Kg / Sqm lime and 9.50 kg / 10 Sqm bulk bitumen for fixing and 0.50 kg / Sqm for tack coat ) Spec: As directed by Engineer In Charge and IRC SP 78 -2008 | Sqm | 127.00 |
| 8.27 | Providing and laying shoulder drain of trap rubble of 0.45 x 0.45 meter section at 45 degree angle to the road edge including hand packing, filling voids with sand/shingle of approved quality and ramming etc. complete as desired. | Rmt | 353.00 |
| 8.28 | Providing and laying Pressure Sensitive Technology ( PST ) based ready mix compound for repairing potholes, manufactured from aggregates of 4-12mm, treated compound having mix of bituminous antistriping compound, stabilizer, Pressure Sensitive Polymer and water repellent compound like oil soluble polyacid etc. having good consistency for laying, technically evaluated for repairs on bituminous/concrete surface confirming to CRRI and IRC accrediated norms for pressure sensitive polymer products for repairs fo potholes on road/ pavement having upto 25mm thick ready thickness including labours, material, tools and tampering etc. complete. (Undertaking shall be taken from the supplier before starting the work) | Sqm | 881.00 |
| 8.29 | Supply of self watering system Multi Stage Tree guard / Protctor 110 mm dia & total height of 1800 mm made up with HDPE. In tubular section, first stage will be 600mm long & second and forth stage 65% perforated casting in HDPE tubular section of 300mm long each tubular section & third and fifth stage of plain 300mm long each tubular section in 110mm dia. all sections fix with stagewise with leakproof fixing arrangement 2 no tubular rubber section of 75mm dia, 1.5mm thick & length 350 mm (fix on both 65% perforated tubular section at top for increase the water holding capacity as per plant height). The specially designed rubber water holding device of size 90mm dia outerside & 12mm dia innerside of 1.5mm thick as per design fix on 40mm dia. 100mm long pvc pipe seperately.(for inserting the plants). 2 nos 40mm dia. treated bamboo of 2.00 mtr. height (buried 150 mm below the bottom of excavated pit & stand with tubular section) 2 nos rubber/pvc ties ( fix at bottom & top of plain tubular section with bamboo) 2 nos 5mm dia. fromate (fixing at bottom o tubular section for deep root irrigation system) 2 nos 600mm long HDPE lateral pipe of 5mm dia. with deep roor irrigation system (insert in the gromate & pit, away form 200 mm from plant roots). 1200 mm long barbed wire of 14 guage (The treeguard is rapping with 1200 mm long barbed wire over third plain tubular section for protection against cattles & other external factors) as per technical specification & manual. ( Cost of Plant & fixing charges will be extra as per approved rates). (Note :- Plant Height should be required above 2.50 m & Dia of stem 25 mm at bottom) | Each | 1,290.00 |
| 8.30 | Supply of self watering system tree guard in 110 mm dia, 1.80 mt height made up of cotton canvas cloth of polymer pipe of 15 litres water storage capacity stand with 2 nos. 40 mm dia treated bamboo of 2 mt ht. tie with tag at two nos and specially designed dexpandable rubber seal 110 mm dia outer & 25 mm dia. inner dia installed on bottom of pipe, and 0.60 m long HDPE lateral pipe 2 nos 5mm dia to carry the water near root zone connected with gromate fix in treeguard and rapping 1.20m long barbed wire to middle of treeguard for protection agianst cattles and other external factors as per specification. ( cost of plant & fixing charges will be extra as per approved rates). (Note :- Plant height should be required above 2.50 m & Dia of stem 25 mm at bottom ) | Each | 1,127.00 |
| 8.31 | Fixing and Transporting of self watering system tree guard-insertion of sapling in self watering tree guard and capping the bottom with expandable rubber seal. Supporting the bamboo with the help of cable tie. Bamboo to be buried 0.15 mt ht. below of excavated pit. Strengthening the bamboo in pit with adequate measures. Circulating the barbed wire around tree guard at middle ht. from bottom and fixing it. Thr rates excluding the cost of barbed wire, bamboo, expandable seal, tree guard and all other required material. Fixing to be carried out as per manual instruction. | Each | 125.00 |
| 8.32 | Providing 50 mm thick Full grout bituminous treatment including supplying all materials , prepairing the exisisting road surface,applying tack coat @ 0.735 kg / sqm and laying the required thickness of metal layer, heating and spraying bitumen of specified Grade at the rate of 5.00 kg / sqm , spreading chips and laying seal coat of specified Grade of bitumen of 1.70 Kg/sqm and compacting , making the surface good etc. complete ( For only Patch Repair works / For Road work ) (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 715.00 |
| 8.33 | Providing 50 mm thick semi grout bituminous treatment including supplying all materials , prepairing the exisisting road surface,applying tack coat @ 0.735 kg / sqm and laying the required thickness of metal layer, heating and spraying bitumen of specified Grade at the rate of 2.75 kg / sqm , spreading chips and laying seal coat of specified Grade of bitumen of 1.25 Kg/sqm and compacting , making the surface good etc. complete ( For only Patch Repair works / For Road work ) (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 552.00 |
| 8.34 | Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. ( For Repair works only) | Sqm | 331.00 |
| 8.35 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat at the rate of 0.30 Kg Sqm.( for repair works only) | Sqm | 265.00 |
| 51.131 | Rehabilitation of existing damaged asphalt pavement by Cold In-Place Recycling (CIPR) process, using foamed bitumen as binder and cement as filler, as per IRC 120-2015 / IRC 37-2018: Providing a layer of fresh aggregates as per design mix by evenly pre-spreading on the exisiting damaged asphalt surface using paver or motor grader to achieve the desired gradation and profile of the road. 1% cement by weight of the mix shall be pre- spread on the layer of fresh aggregates using a truck-mounted automated binder spreader with micro-processor controlled weighing and spreading system. The binder spreader shall have variable working width upto 2.4m to efficiently manage the width of the whole pavement. The pre-spread fresh aggregates and cement and the existing damaged pavement shall be then pulverized and recycled in-situ up to design depth by injecting 2- 2.5% bitumen (VG30) as foamed bitumen as per design mix using a self-propelled wheeled Recycler equipment with a minimum working width of 2m or 2.4m and minimum engine horsepower of 305 kW. The Recycler equipment should have in-built automated water-spraying system and temperature-controlled foamed bitumen injection system with variable and controlled working depth of up to 500 mm. The entire in-situ recycling process shall be carried out in a single pass including milling and pulverizing of existing asphalt pavement with pre-spread aggregate and cement up to desired depth and simultaneous injection of foamed bitumen and water as per job mix design.The resultant recycled mix should be then compacted to required density using 14-20 tonne vibratory padfoot compactor as per design depth; profiled by motor grader and further compacted by smooth vibratory roller and PTR and complete in all respects as required including all materials, labor, machinery, etc. (This cold recycled surface shall be then covered with tack coat and bituminous concrete of 50mm thickness, cost of both to be accounted separately) | Cum | 7,370.00 |
| 51.134 | Milling of existing bituminous surface to specified depth of bituminous layer including disposal of removed material with all lift and lead upto 1000 m etc complete. Using machine like Writgen (W100) or equivalent | Sqm | 44.00 |
| 51.135 | Providing and applying low viscosity bitumen emulsion RS1 for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. | Sqm | 38.00 |
| 51.137 | Providing and laying a Stress Absorbing Membrane Interlayer (SAMI) / bitumen impregnated geotextile layer after cleaning the road surface, geotextile conforming to requirements of clause 703.3, laid over a tack coat with 1.05Kilogramper One Square Metre of paving grade bitumen 80 - 100 penetration / emulsion as per requirement and as directed by Engineer in Charge. | Sqm | 125.00 |
Other chapters in this schedule
- Road Survey and DPR (76)
- Road Sub grade (36)
- Road Sub Base and Base Course (47)
- Road Surfacing Course (12)
- Rigid Pavement (23)
- Road Furniture (155)
- Road Miscellaneous items (34)
- Cross Drainage Works (28)
- Bridge Foundation and Sub Structure (40)
- Bridge : Bored Pile (51)
- Bridge Bearings (6)
- Bridge Super Structure (72)
- Bridge : Bored Pile New Item (18)
- Bridge Maintenance (19)
- Bridge : Well Foundation (24)
- Bridge sub structure and Foundation (28)
- Bored Pile, Well Foundation, sub & Super Structure (5)
- Arch Bridge (8)
- Bridge Repair New Item (46)
- Excavation (35)
- Pile Foundation: Building (57)
- Structural Steel Work (11)
- Plain Cement Concrete (9)
- Reinforced Cement Concrete (53)
- Brick Masonry (20)
- Stone Masonry (13)
- Concrete Block Masonry (9)
- Expansion Joint (11)
- Water Proofing (39)
- Plastering and Pointing (44)
- Paving Flooring and dado (78)
- Wood Finish (11)
- Oil Painting (29)
- Colouring (25)
- Wood Work (26)
- Roofing and Ceiling (57)
- Roofing and Ceiling ( New Item) (16)
- Doors and Windows (110)
- Iron Work (12)
- Water Supply and Sanitary Fitting (213)
- Building Miscellaneous Item (23)
- Building Maintenance (57)
- Structural Strengthening (16)
- Flooring (7)
- Plumbing (19)
- Rain water harvesting (9)
- Others (7)
- Coastal (33)
- Block masonary (5)
- Road work (16)
- Accoustic (20)
- Furniture (39)
- PWD persons (28)
- Cubical Toilet (6)
- Building (7)
- bambusa bamboos item (7)
- Bridge repair (13)
- Rebar (29)
- New Item (18)
Pricing road maintenance against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works