Skip to main content

Maharashtra SOR 2022-23

Road work rates

16 road work items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.

Road work rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹8.00 to ₹12,770.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.

16 items — scroll the table to browse

DescriptionUnit
50.48Water proofing of subgrade:waterproofing on top compacted (as per relevant MORT&H specification)sub grade and shoulder soil base with organosilance Nanotechonology & nano acrylic co-polymer with water (<1000 ppm TDS)in the ratio of 1KilogramOrganosilance Nanotechonology :1Kilogramnano acrylic co-polymer :200 liter water spray @3 liter/ One Square Metre in two spray application (1.5 liter +1.5 liter) as per direction of the Engineer-in-charge. with prior approval of concerned Superitending Engineer.Sqm15.00
50.50Tack coat (with Silance nanotechnology):preparing and applying of water soluable organo silance nanotechnology (for bitumen emulsion application ,IRC approved) with cationic bitumen emulsion CRS1 amd water (< 1000 ppm TDS) in the ratio of 1:4Kilogram organo silance : 100Kilogram cationic bitumen emulsion CRSS1: 200 liter water. with prior approval of concerned Superitending Engineer.Sqm8.00
50.51Construction of stabilised soil base with organo silance by providing locally available moorum/soil(70%) mixed with 30% GSB ॥ with 2% cement by MDD of mix, 0.6 Kilogram/Cum nanotechnology silane & 0.6 Kilogram/ cum of Acrilic Nano - Co polymer, Spreading in uniform layers with grader on prepared surface by mixing in place method withrotavator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Table 2.3 of IRC SP - 77-2008 as per direcion of Engineer - in -charge. with prior approval of concerned Superitending Engineer.Cum1,613.00
50.52Construction of stabilised soil base with organo silance by providing locally available moorum/soil(70%) mixed with 30% GSB ॥ with 3% cement by MDD of mix, 0.6 Kilogram/Cum nanotechnology silane & 0.6 Kilogram/ cum of Acrilic Nano - Co polymer, Spreading in uniform layers with grader on prepared surface by mixing in place method withrotavator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Table 2.3 of IRC SP - 77-2008 as per direcion of Engineer - in -charge.with prior approval of concerned Superitending Engineer.Cum1,701.00
50.53Construction of stabilised soil base with organo silance by providing locally available moorum/soil(70%) mixed with 30% GSB ॥ with 4% cement by MDD of mix, 0.6 Kilogram/Cum nanotechnology silane & 0.6 Kilogram/ cum of Acrilic Nano - Co polymer, Spreading in uniform layers with grader on prepared surface by mixing in place method withrotavator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Table 2.3 of IRC SP - 77-2008 as per direcion of Engineer - in -charge.Cum1,789.00
50.54Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.Cum730.00
50.55Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking rubble obtained by blasting.(Hand broken).Cum780.00
50.56Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).Cum700.00
50.57Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken).Cum750.00
50.58Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .Cum85.00
50.59Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.Sqm27.00
50.60Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.Sqm37.00
50.61Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.Sqm25.00
50.62Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.Sqm34.00
51.178Providing and laying White Topping as per IRC-SP 76-2015 over bituminous surface (Existing bituminous surface preparation to be done if necessary either by milling or levelling course with BM/DLC to correct surface profile and to be paid separately) with unreinforced M-40 grade Pavement Quality Concrete using Ordinary Portland Cement (OPC 43/OPC 53-Grade) at 357kg/cum and 105 kgs of Fly Ash (Replacement of Fly Ash to the extent of 15% and Fine aggregate by 10%) coarse aggregate, fine aggregate and Admixture confirming to IS 9130-1999 (R-2004) polymeric synthetic fibre as per ASTM (1116) such as polyester / polyethylene / polypropylene / Glass fibre at 1.20 kg/cum, mixed in batching and mixing plant or weigh batcher as per approved mix design to achieve minimum flexural strength or modulus of rupture of concrete 4.50 MPa at 28 days limiting maximum water cement ratio to 0.40, transported to site, laid with mechanical paver finisher, spread, vibrated, compacted and finished in a continuous operation to the lines and grades as per drawing, texture finishing of surface, spraying two layers of curing compound, curing with water sprayed on hessian cloth covered over concrete surface, groove cutting grid 1m x 1m to a depth of 1/3 of the Thickness and of width 3-5 mm as per design including cost of all material, side form work, sealing joints labour and HOM of machineries etc. complete as per specifications..Cum7,424.00
51.181BITUMNOUS CONCRETE :- Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with HIMA Grade bituminous binder like ART (Highly Modified Asphalt Binder having not less than 90°C Softening Point and not less than 90% Elastic Recovery) @ 5.4% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepeared in Batch Type Hot Mix Plant and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired 40/50 mm compacted thickness and density as per specification, complete and as per directions of Engineer-in- Charge.Cum12,770.00

Pricing road work against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works