Bridge Maintenance rates

19 bridge maintenance items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.

Bridge Maintenance rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹97.00 to ₹67,000.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.

19 items — scroll the table to browse

DescriptionUnit
16.01Providing and injecting epoxy grout including structuring of crack in the body of slab girder by sand blasting, fixing inlet tube arrangement including cost of materials, machinery required for the work and labour charges etc. complete.KG1,381.00
16.02Repairing of honey combed or spilling area by chipping out the damaged spalled or honey combed portion of concrete up to rusted rebars, cleaning of all rust, scale and loose materials, scaffolding, compressed air machinery etc. complete. (item includes use of air compressor, chipping machine and scaffolding for height 8 to 10 meter)Sqm794.00
16.03Providing and applying well mixed polymer cement slurry in ratio 1:2 over well soaked but surface dry concrete and steel rebar for adhesion of fresh cement and sand mortar as per specification as directed etc. complete. (item includes use of polymers like sikaapproved or similar materials of relevant specification and scaffolding for height 8 to 10 meter)Sqm823.00
16.04Repairs of expansion joints by removing rich mix cement concrete including stacking the spoil as directed with all leads, lifts etc. complete. (use of equipments like air compressor is considered in the item)Sqm3,710.00
16.09Providing and injecting epoxy grout including structuring of cracks in the body of slab girder, fixing inlet tube arrangement including cost of materials, machinery required for the work labour charges etc. (2kg of grout is considered per hole)Each2,766.00
51.140Chipping of all loose and Spalling of concrete to bottom of slab, beams etc.(wherever required), cleaning of reinforcement, carrying out thorough sand blasting, application of anti-corrosive zinc rich epoxy primer to exposed reinforcement including cost of material, labour, equipment, tools, scaffolding etc. complete.Sqm515.00
51.141Providing and applying epoxy bonding agent for bonding old to new concrete for structural members prior applying the epoxy mortar to the concrete surfaces etc complete.Sqm516.00
51.142Providing and applying epoxy mortar of resin and hardner with Sillica sand upto 20 mm thickness of Sika/Fosroc/Pidilite or its equivalent including proper wire brushing etc complete as per the direction of Site-In-Charge.Sqm4,858.00
51.143Charges for groove cutting of15 mm x 15 mm deep along crack and sealing and refilling the same with epoxy mortar including cost of material, labour etc. completeRmt459.00
51.145Bearing cleaning and pier cap cleaning for the proper movement of bearing etc. complete including all tools and machineries scaffolding etc. complete as per the direction of Site in Charge.Each9,605.00
51.146Providing and applying “high strength, non shrink free flow grout material” i. e. micro concrete (like shrink comp or equivalent) having compressive strength as 400 Kilogram/sq.cm. including finishing the surface and curing for 07 days. Etc complete. The usage of this non shrink concrete with zero slump is to allow to occupy every free space leaving no voids, thereby producing dense concrete with proper bonding with concrete (The quoted rates to be inclusive of all materials, labours, tools & tackles, transportation, taxes etc complete) to be applied for foundation and strengthening of pier etc and as per the direction of Site-In-Charge. (The product like Ultratech/Rendroc (RGL) of FOSROC or its equivalent)Cum67,000.00
51.147Providing applying Polymer modified cement mortar pointing to the stone massonry structure including chipping, cleaning, applying bonding agent, stagging, curing and and all tools and tackes including safety etc. complete.Sqm1,435.00
51.148Grouting to the Dowel bars with epoxy of resin+hardner to ensure the proper fixing of dowel bars including all the machineries etc. complete, as per the direction of Site- In- Charge.Each429.00
51.149Providing and applying waterfroof coating to the concrete surface to resist entry of moisture and prevent growth of fungus etc. complete as per the direction of site in charge.Sqm97.00
51.151Strengthening structural elements by providing & fixing CARBON FIBER (Make Sika or BASF or FOSROC) Surface preparation: Grinding concrete substrate, cleaning it with wire brush removing oil, laitance if present, rounding sharp edges to min 25 mm radius etc. complete.Profiling: providing & Applying compatible Mbrace primer on prepared substrate, Filling the holes and uneven surface with high strength epoxy putty etc. complete IF Required. Wrapping: Providing & Applying first coat of Saturant, cutting the carbon fiber sheet to size, wrapping the fiber sheet to structural element at desired orientation using tamping roller to avoid any air voids etc. complete.Sand pasting: Providing & Applying second coat of Saturant after min. 12 hrs, rectify air voids if any paste the rive sand on it to make surface rough to take any further finishes(Mode of measurement: Per sq.mt of Mbrace CF 400 sheet applied and not surface area of Concrete application & Quantity will be measured including wastage) The rate includes all type of material,application,equipment & scaffolding etc complete. Rate is applicable for all height & level.Sqm6,260.00
51.152Replacement of existing damaged Expansion joints by providing and laying of Strip Seal Expansion Joint System, including removal of existing damaged exp joints by dismantling of deck slab, wearing coat etc. and back filling of the recess up to final finish level with conc of grade M-35, complete as per M.O.R. T&H specification.Rmt19,016.00
51.153Providing Polymer modified cement Mortar treatment after removing of existing, clading, plaster, gunite & cleaning and preparing the surface.Applying Polymer cement bond coat and Polymer modified cement Mortar as per manufacturer specification up to 50 mm thick with 8% polymer by weight of cement to fill the all cavities & making protective cover plaster including shutteringSqm6,345.00
51.154Providing, drilling and fixing Nipples for pressure injection grouting of polymer cement grout etc. completeEach266.00
51.155Filling voids/honeycomb with high pressure injection grouting of Polymer Cement Grout (10% of Polymer by Weight of Cement)KG219.00

Pricing bridge maintenance against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.