R/MAHARASHTRA SOR 2022-23
bambusa bamboos item rates
7 bambusa bamboos item items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
- Items
- 7
- Lowest rate
- ₹1,225.00
- Highest rate
- ₹11,300.00
- Effective from
- 2022-07-25
S-01/RATE ITEMS7 ITEMS
bambusa bamboos item rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹1,225.00 to ₹11,300.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. For reference only: verify against the official source before pricing a bid.
/
Unit
7 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 52.05 | Providing and constricting Rammed Earth walls built out of normal compacted soil with temporary steel formwork, similar to one for concreting, has to be erected; soil is placed into the framework and compacted. Soon after finishing compacting, the formwork can be removed. The ideal soil for this kind of building consists in a good mix of different sizes of granularity, from clay (about 10-40%) to silt (about 10-40%) to sand (about 35-65%) and even very fine gravel. Top soil and organic soil have a strong smell of moldy, especially when fresh or humid are not suitable for building.The mix for rammed earth wall shall consist of soil, sand and cement / lime (5% to 8%) as binding material. The minimum thickness shall be around 35cm, mainly to allow stability and thermal mass. The work must got done under supervision of an experience Mason including necessary scaffolding, formwork, labour, material and finishing etc. complete. | Cum | 11,300.00 |
| 52.06 | Providing and fixing Bamboo Shingle roofing with top layer of Bamboo shingles, made of flattened CCB pressure treated bamboo of 50-100mm dia and in size of 450mm x150mm and 3 to 5 mm thick laid over bamboo battens of minimum 25mm thickness, perpendicular to rafter/Beam at spacing of 150mm c/c including laying of bituminous sheet 3 mm thick and minimum overlap of 300 mm placed over sub-purling which is laid parallel to main rafter /beam consisting of 50mm dia not less than 3m length at spacing of 300mm c/c on treated Bamboo woven matt of approved design made out of thin Bamboo strips, supported by CCB treated Bamboo purlins of min dia 50mm not less than 3m length at spacing of 300mm c/c and WPC sheet 6 mm thick, junction details as per drawing and design including all Bamboo accessories like CCB treated Shingles,antiabrasive fire retardant coating ( top and bottom surfaces of roofing system as directed by Engineer in Charge), Bamboo, bamboo mats, SS clamps, nails, Screws, including required scaffolding and cost of labour material with all lead & lifts and machinery & equipment charges, etc complete. | Sqm | 10,150.00 |
| 52.07 | Providing and fixing in position Phenol bonded Bamboo wood flooring with planks of sizes 14mm thick, 1800 mm length (minium) and 130 mm wide (minimum), in approved colour, texture and finish, having Performance Appraisal certified (PAC) issued by Building Materials & Technology Promotion Council (BMTPC). The flooring shall be fixed with tongue and groove interlocking system, with underlayment of 4mm thick expanded poly ethylene foam sheets having density 40kg/One One Cubic Metre, over prepared surface with necessary quarter round planks of size 1900mm x 18mm and door reducer of size 1900mm x 44mm, whereever required. The bamboo wood planks shall have minimum density of 1000 kg/One One Cubic Metre & minimum Hardness 1000kgf. with Eco friendly UV coating, all complete as per direction of Engineer in -charge. Ground floor | Sqm | 5,006.00 |
| 52.08 | Providing & fixing in position Phenol bonded Bamboo wood partition 60mm thick at all height with planks of size 10mm thick, 1800mm length ( minimum) and 130mm ( minimum), in approved colour, texture and finish, on both side having Performance Appraisal Certificate (PAC ) issued by Building Material & Technology Promotion Council (BMTPC), with necessary profiled edges fixed with 40 mm SS screws 5nos in each tile to frame made of second class teak wood of size 40 x 40 mm in center of each tiles and bottom / top of work height. The bamboo wood planks shall have minimum density of 1000kg / cum & minimum Hardness 1000kgf. with Eco friendly UV coating, all complete as per direction of the Engineer in -charge. | Sqm | 9,650.00 |
| 52.09 | Providing & fixing after cutting in proper size & shape bamboo pole of Dentrocalamus stocksii with minimum wall thickness of 10 mm of size 50 mm(+/- 5 mm) diameter (i.e., 50mm dia. in bottom & top dia. should be 35mm & average dia. should not be less than 40mm & taper length should not more than 2.5mm per Rmt), which is well seasoned by freshly cut canes including treatment with preservative inside the bamboo pole &dosing with CCB (Chromium Copper Bromate) using pressure vacuum treatment plant with retention level of minimum 8% and in accordance with IS 9096. These bamboos are used for making beams & columns including bending of bamboos, joining, bunching of bamboos, assembly and its installation as per design using bamboo pegs (45 degree), SS Studs fixed with nuts & bolts (304 grade), GI plates coated with epoxy coating, including transportation & cost of material, antiabrasive fire retardant coating before bunching of bamboos( Two coats before bunching and final coat after complete installation as directed by Engineer in Charge) , necessary scaffolding with all lead, lift, machinery & equipment charges, etc. complete, as directed by the Engineer in charge | Rmt | 1,225.00 |
| 52.10 | Providing and fixing in roof system after cutting in proper size and shape Griha Certified WPP sheet made of wood polymer composite - WPC) of thickness 6mm, density more than 550 kg/cum, having proper screw holding capacity. This board shall not be pasted with treated bamboo mats and fixed over bamboo purlins with SS Nails/SS Screws. The bamboo mat design visible from below may be hapazard. The rates shall be including trasportation, cost of WPC Board and all fixtures and fastenings with necessary scaffolding with all lead and lift, machinery and equipment charges etc. complete as directed by Engineer in charge. | Sqm | 1,430.00 |
| 52.11 | Supply & Application of Fire retardant Polish with Fire Retardant sealer field coat of approved make & one, two or three coats. Top Coat to provide class-I surface spread of flame as per BS:476 Part 6 & 7 and IS-12777 in clear shade including cleaning, injecting of fire retardent sealer and preparation of surface including transportation and cost of material, necessary scaffolding with all lead, lift, machinery & equipment charges, etc. complete as per instructions of Engineer-In-Charge/Manufacturers specification,3- Apply Two coats of fire retardant clear solvent based top coat which specific gravity should be 0.97 in regular 4-6 hour duration | Sqm | 1,512.00 |
S-02/SOURCE RECORD2022-23
- ISSUED BY
- Maharashtra Public Works Department (PWD)
- EFFECTIVE
- 2022-07-25
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS59 MORE
Other chapters in this schedule
- Road Survey and DPR76
- Road Sub grade36
- Road Sub Base and Base Course47
- Road Surfacing Course12
- Rigid Pavement23
- Road Furniture155
- Road Miscellaneous items34
- Road Maintenance39
- Cross Drainage Works28
- Bridge Foundation and Sub Structure40
- Bridge : Bored Pile51
- Bridge Bearings6
SHOW ALL 59 CHAPTERS
- Bridge Super Structure72
- Bridge : Bored Pile New Item18
- Bridge Maintenance19
- Bridge : Well Foundation24
- Bridge sub structure and Foundation28
- Bored Pile, Well Foundation, sub & Super Structure5
- Arch Bridge8
- Bridge Repair New Item46
- Excavation35
- Pile Foundation: Building57
- Structural Steel Work11
- Plain Cement Concrete9
- Reinforced Cement Concrete53
- Brick Masonry20
- Stone Masonry13
- Concrete Block Masonry9
- Expansion Joint11
- Water Proofing39
- Plastering and Pointing44
- Paving Flooring and dado78
- Wood Finish11
- Oil Painting29
- Colouring25
- Wood Work26
- Roofing and Ceiling57
- Roofing and Ceiling ( New Item)16
- Doors and Windows110
- Iron Work12
- Water Supply and Sanitary Fitting213
- Building Miscellaneous Item23
- Building Maintenance57
- Structural Strengthening16
- Flooring7
- Plumbing19
- Rain water harvesting9
- Others7
- Coastal33
- Block masonary5
- Road work16
- Accoustic20
- Furniture39
- PWD persons28
- Cubical Toilet6
- Building7
- Bridge repair13
- Rebar29
- New Item18
ARCHED / ESTIMATING
Pricing bambusa bamboos item against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.