Maharashtra SOR 2022-23
Road Surfacing Course rates
12 road surfacing course items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
Road Surfacing Course rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹65.00 to ₹11,689.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.
12 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 4.01 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 75.00 |
| 4.03 | Providing and laying of Type - B premix seal coat with HMP of approprate crushed stone chipping 6.70 mm size and penetration bitumen of specified grade @ 0.68 Kg / Sqm. , preparing existing road surface including mixing in suitable Batch Mix plant and rolling by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 67.00 |
| 4.04 | Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- a) 19 mm nominal chippling size (bitumen 12.00 kg/10 Sq.M.) -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 98.00 |
| 4.05 | Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- b) 13 mm nominal chippling size (bitumen 10.00 kg/10 Sq.M -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 80.00 |
| 4.06 | Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- c) 10 mm nominal chippling size (bitumen 9.0 kg/10 Sq.M -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 74.00 |
| 4.07 | Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- d) 6 mm nominal chippling size (bitumen 7.50 kg/10 Sq.M -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 65.00 |
| 4.11 | Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. - | Sqm | 179.00 |
| 4.12 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 193.00 |
| 51.133 | Providing and laying Stone Matrix Asphalt with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregate of specified grading premixed with bituminous binder @ 5.80 minimum percent of mix and filler, transporting the hot mix towards site, laying with hydrostatic paver finisher with sensor control to required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause One Number515 etch. complete in all respects, IRC SP 79 | Cum | 11,689.00 |
| 51.136 | Providing and laying Microsurfacing course comprising of dry (A) fine aggreegates confirming to Type III grading @12 Kilogram/ One Square Metre. of Road Surface coverage of specification as per IRC SP 81, 2008 Polymer / latest modified cationic quick setting bitumen emulsion having 60% binder content and 3.6% polymer (B) @ 12.5% by weight of fine aggregate ordinary portland cement (C) @ 2% by weight of agrregate chemical additives (D) @1.5% by weight of fine aggregate and water as per requirement. | Sqm | 179.00 |
| 51.139 a | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA, Paver and Vibratory roller( over BT Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 191.00 |
| 51.139 b | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | Sqm | 198.00 |
Other chapters in this schedule
- Road Survey and DPR (76)
- Road Sub grade (36)
- Road Sub Base and Base Course (47)
- Rigid Pavement (23)
- Road Furniture (155)
- Road Miscellaneous items (34)
- Road Maintenance (39)
- Cross Drainage Works (28)
- Bridge Foundation and Sub Structure (40)
- Bridge : Bored Pile (51)
- Bridge Bearings (6)
- Bridge Super Structure (72)
- Bridge : Bored Pile New Item (18)
- Bridge Maintenance (19)
- Bridge : Well Foundation (24)
- Bridge sub structure and Foundation (28)
- Bored Pile, Well Foundation, sub & Super Structure (5)
- Arch Bridge (8)
- Bridge Repair New Item (46)
- Excavation (35)
- Pile Foundation: Building (57)
- Structural Steel Work (11)
- Plain Cement Concrete (9)
- Reinforced Cement Concrete (53)
- Brick Masonry (20)
- Stone Masonry (13)
- Concrete Block Masonry (9)
- Expansion Joint (11)
- Water Proofing (39)
- Plastering and Pointing (44)
- Paving Flooring and dado (78)
- Wood Finish (11)
- Oil Painting (29)
- Colouring (25)
- Wood Work (26)
- Roofing and Ceiling (57)
- Roofing and Ceiling ( New Item) (16)
- Doors and Windows (110)
- Iron Work (12)
- Water Supply and Sanitary Fitting (213)
- Building Miscellaneous Item (23)
- Building Maintenance (57)
- Structural Strengthening (16)
- Flooring (7)
- Plumbing (19)
- Rain water harvesting (9)
- Others (7)
- Coastal (33)
- Block masonary (5)
- Road work (16)
- Accoustic (20)
- Furniture (39)
- PWD persons (28)
- Cubical Toilet (6)
- Building (7)
- bambusa bamboos item (7)
- Bridge repair (13)
- Rebar (29)
- New Item (18)
Pricing road surfacing course against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works