R/MAHARASHTRA SOR 2022-23
Bored Pile, Well Foundation, sub & Super Structure rates
5 bored pile, well foundation, sub & super structure items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
- Items
- 5
- Lowest rate
- ₹177.00
- Highest rate
- ₹1,07,164.00
- Effective from
- 2022-07-25
S-01/RATE ITEMS5 ITEMS
Bored Pile, Well Foundation, sub & Super Structure rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹177.00 to ₹1,07,164.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. For reference only: verify against the official source before pricing a bid.
/
Unit
5 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 17.67 | Supply of all types of Structural steel conforming to Fe 410 B of IS 2062, Fabrication, assembling, erection / slewing/ end launching of Steel girders ( NOT requiring traffic block) upto 45.7 m span on sub structure incl. provision of trolley refuges, incl. loading, unloading, lift and taxes complete, assembly of girders on drift/ bolts, field riveting/ welding, assembling of temporary support for side slewing, raising of girders to the bed block level, providing sliding arrangements (Material at site, fabrication at site, erection / launching etc only) PLATE GIRDER / Semi Through Girder | MT | 1,07,164.00 |
| 17.68 | Extra for working under running traffic / traffic block conditions for above Items. | MT | 21,433.00 |
| 17.69 | Metalizing of steel work of girder with grit blasting as per IRS - B1-2011 following by one coat of etch primer (as per IS;5666) one coat of Zinc Chrome primer (as per IS:104) and two coats of aluminium paint (as per IS:2339) with all labour, tools,plants and materials. | Sqm | 177.00 |
| 17.70 | Providing sacrificial shuttering for deck slab made up with galvanised Cold Rolled Cold Annealed (CRCA) steel of 310 MPA Grade with all Contractor's material, labour, erection fixing, welding etc. (Decking Sheet ) | MT | 66,368.00 |
| 17.71 | Providing and removing barricading with the help of portable fencing along the running track where the work is to be done in close vicinity of the track. Fencing shall consist of self supporting steel angles of size 50 x50x6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23x0.23x0.23M placed at c/c distance of 2.0 M along the track. 12 mm dia rods in three horizontal layers tack welded with the angle posts including providing Retro-reflective tapes in Horizontal & vertical direction. Note : Released material will be the property of the contractor after the completion of work. Cost of cement to be paid separately. | Rmt | 587.00 |
S-02/SOURCE RECORD2022-23
- ISSUED BY
- Maharashtra Public Works Department (PWD)
- EFFECTIVE
- 2022-07-25
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS59 MORE
Other chapters in this schedule
- Road Survey and DPR76
- Road Sub grade36
- Road Sub Base and Base Course47
- Road Surfacing Course12
- Rigid Pavement23
- Road Furniture155
- Road Miscellaneous items34
- Road Maintenance39
- Cross Drainage Works28
- Bridge Foundation and Sub Structure40
- Bridge : Bored Pile51
- Bridge Bearings6
SHOW ALL 59 CHAPTERS
- Bridge Super Structure72
- Bridge : Bored Pile New Item18
- Bridge Maintenance19
- Bridge : Well Foundation24
- Bridge sub structure and Foundation28
- Arch Bridge8
- Bridge Repair New Item46
- Excavation35
- Pile Foundation: Building57
- Structural Steel Work11
- Plain Cement Concrete9
- Reinforced Cement Concrete53
- Brick Masonry20
- Stone Masonry13
- Concrete Block Masonry9
- Expansion Joint11
- Water Proofing39
- Plastering and Pointing44
- Paving Flooring and dado78
- Wood Finish11
- Oil Painting29
- Colouring25
- Wood Work26
- Roofing and Ceiling57
- Roofing and Ceiling ( New Item)16
- Doors and Windows110
- Iron Work12
- Water Supply and Sanitary Fitting213
- Building Miscellaneous Item23
- Building Maintenance57
- Structural Strengthening16
- Flooring7
- Plumbing19
- Rain water harvesting9
- Others7
- Coastal33
- Block masonary5
- Road work16
- Accoustic20
- Furniture39
- PWD persons28
- Cubical Toilet6
- Building7
- bambusa bamboos item7
- Bridge repair13
- Rebar29
- New Item18
ARCHED / ESTIMATING
Pricing bored pile, well foundation, sub & super structure against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.