Skip to main content

Maharashtra SOR 2022-23

Bored Pile, Well Foundation, sub & Super Structure rates

5 bored pile, well foundation, sub & super structure items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.

Bored Pile, Well Foundation, sub & Super Structure rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹177.00 to ₹1,07,164.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.

5 items — scroll the table to browse

DescriptionUnit
17.67Supply of all types of Structural steel conforming to Fe 410 B of IS 2062, Fabrication, assembling, erection / slewing/ end launching of Steel girders ( NOT requiring traffic block) upto 45.7 m span on sub structure incl. provision of trolley refuges, incl. loading, unloading, lift and taxes complete, assembly of girders on drift/ bolts, field riveting/ welding, assembling of temporary support for side slewing, raising of girders to the bed block level, providing sliding arrangements (Material at site, fabrication at site, erection / launching etc only) PLATE GIRDER / Semi Through GirderMT1,07,164.00
17.68Extra for working under running traffic / traffic block conditions for above Items.MT21,433.00
17.69Metalizing of steel work of girder with grit blasting as per IRS - B1-2011 following by one coat of etch primer (as per IS;5666) one coat of Zinc Chrome primer (as per IS:104) and two coats of aluminium paint (as per IS:2339) with all labour, tools,plants and materials.Sqm177.00
17.70Providing sacrificial shuttering for deck slab made up with galvanised Cold Rolled Cold Annealed (CRCA) steel of 310 MPA Grade with all Contractor's material, labour, erection fixing, welding etc. (Decking Sheet )MT66,368.00
17.71Providing and removing barricading with the help of portable fencing along the running track where the work is to be done in close vicinity of the track. Fencing shall consist of self supporting steel angles of size 50 x50x6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23x0.23x0.23M placed at c/c distance of 2.0 M along the track. 12 mm dia rods in three horizontal layers tack welded with the angle posts including providing Retro-reflective tapes in Horizontal & vertical direction. Note : Released material will be the property of the contractor after the completion of work. Cost of cement to be paid separately.Rmt587.00

Pricing bored pile, well foundation, sub & super structure against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works