Maharashtra SOR 2022-23
Bridge Foundation and Sub Structure rates
40 bridge foundation and sub structure items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.
Bridge Foundation and Sub Structure rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹90.00 to ₹3,42,717.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.
40 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 12.02 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( By /manaual Means ) a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 239.00 |
| 12.03 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( By Mechanical Means ) a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 90.00 |
| 12.04 | Excavation for foundation in hard murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 241.00 |
| 12.06 | Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 286.00 |
| 12.08 | Excavation for foundation in soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 557.00 |
| 12.09 | Excavation for foundation in hard rock by blasting including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 1,232.00 |
| 12.10 | Excavation for foundation in hard rock by controlled blasting including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 1,328.00 |
| 12.11 | Excavation for foundation in hard rock by chiselling and wedging or line drilling including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 1,932.00 |
| 12.12 | Excavation for foundation in laterite rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | Cum | 1,771.00 |
| 12.13 | Providing and fixing 25mm diameter steel anchor dowel in hard rock including drilling hole of 32 mm diameter up to 0.75 mtrs depth, placing the dowel in position and effectively grouting the hole with CM 1:1 proportion etc. complete. | Each | 1,674.00 |
| 12.22 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | Hour | 179.00 |
| 12.23 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | Hour | 201.00 |
| 12.24 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | Hour | 223.00 |
| 12.25 | Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) | Cum | 5,593.00 |
| 12.27 | Providing uncoursed rubble stone masonry of trap/ granite/ quartzite/ gneiss metal in CM 1:5 for foundation of piers, abutments, wings etc. including bailing out of water, striking joints, scaffolding and watering etc. complete. | Cum | 5,022.00 |
| 12.28 | Providing, fabricating, launching, floating and grounding in position steel curbs for wells with necessary steel bracings and steel cutting edges as shown in the detailed drawings and technical specifications etc. complete. | MT | 95,341.00 |
| 12.29 | Providing and laying in situ / ready mix / ready mix CC M10 of trap/ granite/ quartzite/ gneiss metal in the hollow of the steel curbs including compacting by vibrating and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ) | Cum | 5,360.00 |
| 12.31 | Providing, fabricating and setting out MS cutting edge for RCC well curbs as per detailed drawings and technical specifications etc. complete. | MT | 87,664.00 |
| 12.32 | Providing and laying in situ / ready mix / ready mix M20 RCC work with trap/ granite/ quartzite/ gneiss metal in well steining including shuttering, compacting by vibrating, finishing and curing etc. complete. (fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | Cum | 6,976.00 |
| 12.34 | Providing and laying in situ / ready mix / ready mix M25 RCC work with trap/ granite/ quartzite/ gneiss metal in well steining including shuttering, compacting by vibrating, finishing and curing etc. complete. (fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | Cum | 7,057.00 |
| 12.36 | Providing and laying in situ / ready mix / ready mix M20 RCC work with trap/ granite/ quartzite/ gneiss metal in well steining including shuttering, compacting by vibrating, finishing and curing etc. complete. (fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | Cum | 6,976.00 |
| 12.38 | Providing and laying in situ / ready mix / ready mix M25 RCC work with trap/ granite/ quartzite/ gneiss metal in well steining including shuttering, compacting by vibrating, finishing and curing etc. complete. (fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | Cum | 7,012.00 |
| 12.40 | Sinking of wells upto 5.0 metres diameter for foundation through all strata (except rock) to be removed by grabbing and chiselling soft disintegrated rock including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools, all materials available to sink through such strata including removal of obstacle and use of necessary plant and machinery, divers etc. and proper seating of the wells etc. complete. (depth 0 to 5 metre) i) Add 30% extra for depth 5 to 10 m ii) Add 40% extra for depth 10 to 15 m iii) Add 60% extra for depth 15 to 20 m iv) Add 100% extra for depth above 20 m | Rmt | 43,279.00 |
| 12.41 | Sinking of wells above 5.0 metres and upto 6.0 metres diameter for foundation through all strata (except rock) to be removed by grabbing and chiselling soft disintegrated rock including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools, all materials available to sink through such strata including removal of obstacle and use of necessary plant and machinery, divers etc. and proper seating of the wells etc. complete. (depth 0 to 5 metre) i) Add 30% extra for depth 5 to 10 m ii) Add 40% extra for depth 10 to 15 m iii) Add 60% extra for depth 15 to 20 m iv) Add 100% extra for depth above 20 m | Rmt | 54,819.00 |
| 12.42 | Sinking of wells above 6.0 metres and upto 7.0 metres diameter for foundation through all strata (except rock) to be removed by grabbing and chiselling soft disintegrated rock including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools, all materials available to sink through such strata including removal of obstacle and use of necessary plant and machinery, divers etc. and proper seating of the wells etc. complete. (depth 0 to 5 metre) i) Add 30% extra for depth 5 to 10 m ii) Add 40% extra for depth 10 to 15 m iii) Add 60% extra for depth 15 to 20 m iv) Add 100% extra for depth above 20 m | Rmt | 59,747.00 |
| 12.43 | Sinking of wells above 7.0 metres and upto 8.0 metres diameter for foundation through all strata (except rock) to be removed by grabbing and chiselling soft disintegrated rock including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools, all materials available to sink through such strata including removal of obstacle and use of necessary plant and machinery, divers etc. and proper seating of the wells etc. complete. (depth 0 to 5 metre) i) Add 30% extra for depth 5 to 10 m ii) Add 40% extra for depth 10 to 15 m iii) Add 60% extra for depth 15 to 20 m iv) Add 100% extra for depth above 20 m | Rmt | 84,298.00 |
| 12.44 | Sinking of wells above 8.0 metres and upto 9.0 metres diameter for foundation through all strata (except rock) to be removed by grabbing and chiselling soft disintegrated rock including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools, all materials available to sink through such strata including removal of obstacle and use of necessary plant and machinery, divers etc. and proper seating of the wells etc. complete. (depth 0 to 5 metre) i) Add 30% extra for depth 5 to 10 m ii) Add 40% extra for depth 10 to 15 m iii) Add 60% extra for depth 15 to 20 m iv) Add 100% extra for depth above 20 m | Rmt | 94,494.00 |
| 12.45 | Sinking of wells above 9.0 metres and upto 10.0 metres diameter for foundation through all strata (except rock) to be removed by grabbing and chiselling soft disintegrated rock including blasting, large scale dewatering, heavy chiselling, cutting by pneumatic tools, all materials available to sink through such strata including removal of obstacle and use of necessary plant and machinery, divers etc. and proper seating of the wells etc. complete. (depth 0 to 5 metre) i) Add 30% extra for depth 5 to 10 m ii) Add 40% extra for depth 10 to 15 m iii) Add 60% extra for depth 15 to 20 m iv) Add 100% extra for depth above 20 m | Rmt | 1,00,965.00 |
| 12.46 | Extra charges for sinking of various diameter of well foundation in hard rock encountered during sinking by chiselling in water etc. complete. | Rmt | 2,842.00 |
| 12.47 | Providing steel anchor dowel bars of 32 mm diameter and 4 m length at the base of the well including drilling holes of 60 mm diameter up to 2.5 m depth in rock, placing the dowels in position and effectively grouting the holes with CM 1:1 etc. complete. | Each | 7,859.00 |
| 12.48 | Providing steel anchor dowel bars of 32 mm diameter and 4 m length through steining of the wells including provision of necessary ducts through staining, drilling holes of 60 mm diameter up to 2.5 m depth in rock, placing the dowels in position and effectively grouting the holes with CM 1:1 etc. complete. | Each | 8,270.00 |
| 12.49 | Providing and laying in situ / ready mix / ready mix M15 CC of trap/ granite /quartzite /gneiss metal for the bottom plugs of wells in the dry condition including compaction and curing wherever necessary etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ) | Cum | 6,975.00 |
| 12.51 | Providing and laying in situ / ready mix M15 CC of trap/ granite /quartzite /gneiss metal for the bottom plugs of wells under water including compaction and curing wherever necessary etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ) | Cum | 7,576.00 |
| 12.55 | Providing and laying in situ / ready mix controlled grade of M15 of trap /granite /quartzite /gneiss metal for RCC works in cut off walls / curtain walls including necessary scaffolding, centering, compacting by vibrator, finishing and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) VSI sand crushed, excluding reinforcement) | Cum | 7,472.00 |
| 12.57 | Providing and laying in situ / ready mix controlled grade of M20 of trap /granite /quartzite /gneiss metal for RCC works in cut off walls / curtain walls including necessary scaffolding, centering, compacting by vibrator, finishing and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | Cum | 7,937.00 |
| 12.59 | Providing and laying in situ / ready mix controlled grade of M25 of trap /granite /quartzite /gneiss metal for RCC works in cut off walls / curtain walls including necessary scaffolding, centering, compacting by vibrator, finishing and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | Cum | 8,019.00 |
| 12.67.a | Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation for 8m dia. Well. Note:- For other well diameters rate can be worked out on the basis of cross-sectional area of well. The diameter of the island shall be in the conformity with clause 1203.2 of MoRTH For depth of water 1.0 m and height of island to be 1.25 m. | Each | 72,953.00 |
| 12.67.b | Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation for 8m dia. Well. Note:- For other well diameters rate can be worked out on the basis of cross-sectional area of well. The diameter of the island shall be in the conformity with clause 1203.2 of MoRTH For depth of water 4.0 m and height of island 4.5 m. | Each | 3,42,717.00 |
| 12.68.a | Providing and Constructing Temporary Island 12 m diameter for Construction of Well Foundation for 6 m dia. Well. Note:- For other well diameters rate can be worked out on the basis of cross-sectional area of well. The diameter of the island shall be in the conformity with clause 1203.2 of MoRTH For depth of water 1.0 m and height of island to be 1.25 m. | Each | 42,308.00 |
| 12.68.b | Providing and Constructing Temporary Island 12 m diameter for Construction of Well Foundation for 6 m dia. Well. Note:- For other well diameters rate can be worked out on the basis of cross-sectional area of well. The diameter of the island shall be in the conformity with clause 1203.2 of MoRTH For depth of water 4.0 m and height of island 4.5 m. | Each | 2,12,014.00 |
Other chapters in this schedule
- Road Survey and DPR (76)
- Road Sub grade (36)
- Road Sub Base and Base Course (47)
- Road Surfacing Course (12)
- Rigid Pavement (23)
- Road Furniture (155)
- Road Miscellaneous items (34)
- Road Maintenance (39)
- Cross Drainage Works (28)
- Bridge : Bored Pile (51)
- Bridge Bearings (6)
- Bridge Super Structure (72)
- Bridge : Bored Pile New Item (18)
- Bridge Maintenance (19)
- Bridge : Well Foundation (24)
- Bridge sub structure and Foundation (28)
- Bored Pile, Well Foundation, sub & Super Structure (5)
- Arch Bridge (8)
- Bridge Repair New Item (46)
- Excavation (35)
- Pile Foundation: Building (57)
- Structural Steel Work (11)
- Plain Cement Concrete (9)
- Reinforced Cement Concrete (53)
- Brick Masonry (20)
- Stone Masonry (13)
- Concrete Block Masonry (9)
- Expansion Joint (11)
- Water Proofing (39)
- Plastering and Pointing (44)
- Paving Flooring and dado (78)
- Wood Finish (11)
- Oil Painting (29)
- Colouring (25)
- Wood Work (26)
- Roofing and Ceiling (57)
- Roofing and Ceiling ( New Item) (16)
- Doors and Windows (110)
- Iron Work (12)
- Water Supply and Sanitary Fitting (213)
- Building Miscellaneous Item (23)
- Building Maintenance (57)
- Structural Strengthening (16)
- Flooring (7)
- Plumbing (19)
- Rain water harvesting (9)
- Others (7)
- Coastal (33)
- Block masonary (5)
- Road work (16)
- Accoustic (20)
- Furniture (39)
- PWD persons (28)
- Cubical Toilet (6)
- Building (7)
- bambusa bamboos item (7)
- Bridge repair (13)
- Rebar (29)
- New Item (18)
Pricing bridge foundation and sub structure against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works