Skip to main content

Maharashtra SOR 2022-23

Building Maintenance rates

57 building maintenance items from the Maharashtra Public Works Department (PWD), effective 2022-07-25.

Building Maintenance rates in the Maharashtra State Schedule of Rates 2022-23 run from ₹9.00 to ₹2,539.00. Transcribed from Maharashtra PWD — State Schedule of Rates 2022-23, effective 25 July 2022. Reference only — verify against the official source before pricing a bid.

57 items — scroll the table to browse

DescriptionUnit
46.01Removing double country tiled roof with ridge and with battens and stacking the materials as directed with all leads and lifts, complete including removing wood work below etc. completeSqm112.00
46.02Removing planking from roof or ceiling and stacking them sa directed with all leads and lifts etc. completeSqm50.00
46.03Removing Queen Post truss from roof and stacking the materials as directed with all leads and lifts etc. completsEach1,787.00
46.04Removing King Post truss from roof and stacking the materials as directed with all leads and lifts etc. completsEach1,166.00
46.05Removing other type truss below 5 metres span from roof and stacking the materials as directed with all leads and lifts etc. completsEach875.00
46.06Dismantling flat wooden or A.C. Sheet ceiling with frame work including stacking the materials as directed with all leads, lifts etc. complete.Sqm60.00
46.07Removing cloth ceiling including frame work and stacking the materials as ditected with all leads, lifts etc. completeSqm30.00
46.08Dismantling brick masonry in Mud and stacking the materials as directed with all leads, lifts etc. complete.Cum260.00
46.09Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc.Cum335.00
46.10Dismantling stone masonry in Mud including stacking the materials as directed with all leads, lifts etc. complete.Cum268.00
46.11Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc.Cum380.00
46.12Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.Cum558.00
46.13Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.Cum930.00
46.14Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete.Cum633.00
46.15Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete.Each156.00
46.16Removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete.Each132.00
46.17Removing wooden or A.C. partition including frame work and stack-ing the materials as with all leads, lifts etc. complete.Sqm40.00
46.18Removing teak wood trellies work with frame including stacking the materials as directed with all leads, lifts etc. complete.Sqm33.00
46.19Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. completeSqm45.00
46.21Dismantling wooden floor including beams and joists, stacking the materials as directed with all leads, lifts etc. complete.Sqm37.00
46.23Removing mud plaster including disposing of the spoils as directed with all leads, lifts etc, complete.Sqm15.00
46.24Removing wire fencing with wooden post and stacking the material with all leads, lifts etc. complete.Rmt50.00
46.25Removing wire fencing with iron/ C.C. fencing post and stacking the materials as directed with all leads, lifts etc. complete.Rmt67.00
46.26Removing iron pipe raling having wooden R.C.C. or C.C. or iron post and stacking the materials as directed etc. complete.Rmt69.00
46.27Removing earthen, stonewate pipe and stacking them as directed with all leads, lifts etc. complete.Rmt22.00
46.28Removing cast iron or wrought iron or A.C. pipe and stacking them as directed with all leads, lifts etc. complete.Rmt22.00
46.29Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete.Cum1,451.00
46.30Removing Np-2 and Np-3 class pipes including stacking at road side as directed by the Engineer in charge. Upto 900mm dia. etc complete.Rmt236.00
46.31Removing Np-2 and Np-3 class pipes including stacking at road side as directed by the Engineer in charge. Upto 900mm dia and above. etc complete.Rmt310.00
46.32Removing single country tiled roof with battens and stacking the materials as directed with all leads and lifts etc. complete.Sqm71.00
46.33Removing battens from roof and stacking them as directed with all leads and lifts etc. complete.Rmt9.00
46.34Removing matting from roof and stacking as directed with all leads and lifts etc. complete.Sqm20.00
46.35Removing purlins from roof including stacking as directed with all leads , lifts etc. complete.Rmt21.00
46.36Removing rafters from roof including the materials as directed with all leads , lifts etc. complete.Rmt21.00
46.37Removing cloth partition with frame work and stacking the materials as directed with all leads , lifts etc. complete.Sqm18.00
46.38Providing and fixing Jute Kantan (Tarat) screen to the scaffold-ing for external guniting as directed including removing the same after the work is over etc. complete.Sqm68.00
46.39Providing and erecting chain link fencing 1.6 M. height with G.I. chain link of size 50 x 50 mm, 8 gauge thick and fixed 75 mm above ground level on vertical M.S. Angles of 40 x 40 x 6 mm size, includind excavating pits for foundation and embedded in C.C. block of 1:4:8 mix of size 450 x 450 x 670 mm. at 1.75 M. c/c with iron bar 16mm dia as hold fast including welding link with angle frame at 30 cm c/c with nuts and bolts and horizontal M.S. Angles at top and bottom of 25 x 25 x 5 mm size and vertical M.S. flat 35 x 5 mm and 25 x 5 mm horizontal including cross support of 40 x 40 x 6 mm angles both side at every corner or bend embedded in concrete blocks of 1:4:8 of size 450 x 450 x 670 mm including 3 coats of oil painting etc. complete.Rmt2,539.00
46.40Removing urinal pans or wash hand basins with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc completeEach96.00
46.41Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete.Each207.00
46.42Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.Sqm279.00
46.43Removing Manglore tiled roof and ridge tiles with battens, ridge and barge boards, eaves 8 A boards etc and sacking the materials as directed with all leads and lifts complete. Including removing wood work below etc. complete.Sqm115.00
46.44Providing and erecting 1.5 metre high wire fencing with seven rows of barbed wire supported on M.S. Angles (50 mm x 50 mm x 6 mm) at 2.5 metres centre to centre including excavating pits for foundation, fixing posts in cement concrete of size 45 x 45 x 45 cm, fastening the wire and painting the M.S. Angles with one coat of red lead primer and two coats of painting etc. complete.Rmt838.00
46.45Providing and erecting 1.5 metre high wire fencing with seven rows of barbed wire supported on wooden post of specified size at 2.5 M C/C including excavating pits for foundation, fixing post in cement concrete 1:4:8 block of concrete of size 45 x 45 x 45 cm fastening the wire and coal tarring wooden post in two coats etc. complete.Rmt796.00
46.46Replacement of damaged alluminium Butt Hinges of 125 mm of approved quality and make to door shutter including removing existing the same in original position making proper adjustment for smooth operation etc. complete as per sample approved by Engineer incharge.Each295.00
46.47Replacement of damaged Mortise Lock of approved quality and make to door shutter including Removing and Refixing with Necessary screw, making proper adjustment for smooth operation etc. complete as per sample approved by Engineer in- chareg.Each1,236.00
46.48Replacement of damaged Aldrop 300 mm Chromium plated of approved quality and make to door shutter including removing existing the same in original position making proper adjustment for smooth operation etc. complete as per sample approved by Engineer in-charge.Each375.00
46.49Replacement of damaged Aldrop 300 mm Iron Oxidised of approved quality and make to door shutter including removing existing the same in original position making proper adjustment for smooth operation etc. complete as per sample approved by Engineer in-charge.Each322.00
46.50Replacement of damaged Tower Bolt 300 mm Chromium plated of approved quality and make to door/window shutter including removing existing the same in original position making proper adjustment for smooth operation etc. complete as per sample approved by Engineer in-charge.Each190.00
46.51Replacement of damaged Alluminium Handle 125 mm of approved quality and make to door/window shutter including removing existing the same in original position making proper adjustment for smooth operation etc. complete as per sample approved by Engineer in-charge.Each178.00
46.52Replacement of damaged Lock of approved quality and make to cupboard and doorwer including Removing and Refixing with necessary screw, making proper adjustment for smooth operation etc. complete as per sample approved by Engineer in- charge.Each247.00
46.53Removing chockes and leakages from down take G.I/CI/PVC pipe line on walls floor level by using zoola / scaffolding and rectify the same for functioning with all lifts etc. complete.Each313.00
46.54Manualy clearing the chockes from under ground drainage line including Inspection chambers with the help of required tools for propre functioning line chamber to chamber etc. complete.Rmt49.00
46.55Manualy clearing by removeing the chockes from Nahni Trap, Gully Trap, Wash basin unit, Sink and WC with the help of required tools for proper functioning the same etc. complete.Each186.00
46.56Filling tiles joint portion of flooring and dado filling with white cement by removing existing loose morter/ cement slurry from joint with tools and finish with washing cleaning and curing etc. complete.Sqm239.00
46.57Providing and fixing 6 mm thick commercial plywood with jungle wood frame work of 50 x 35 mm size at 60 cm on both ways for closing the window portion/openings for protection from falling debris, dust etc. including cutting, fixing with nails and removing after the same after completion of the work. (To be used after approval of Superintending Engineer)Sqm1,048.00
46.58Removal of plants / ficus grown by pulling out root system embedded in masnory, cutting stem and application of high/gur/lime formulation as specified by the Architect or other patented chemical biocide treatment such as biocide 'Glycel' (iso proplamine salt of glyphosate) or other chemical as specified by the Engineer in charge etc. complete.Each228.00
46.59Lowering down the debris obtained from breaking and removing the cement plaster / burnt brick masonry of the first floor by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete.Cum752.00

Pricing building maintenance against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works