Rajasthan Basic Schedule of Rates 2025-26

1,005 rate items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01. Searchable, with Excel and CSV download.
Items reproduced
1,005
Chapters
22
Edition
2025-26
Effective from
2025-04-01
S-01/SOURCE RECORDRETRIEVED 2026-07-29
ISSUED BY
Rajasthan PWD (Roads & Bridges)
EFFECTIVE
2025-04-01
RETRIEVED
2026-07-29

Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.

S-02/CHAPTERS22 CHAPTERS

Browse by chapter

1,005 items across 22 chapters. Each chapter is searchable and sortable.

S-03/SMALLER CHAPTERS1 ITEMS

Other items

1 items in 1 smaller chapters.

1 items. Scroll the table to browse

DescriptionUnit
R-7.7Construction of RCC guide posts of 250 mm dia M25 grade cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and MoRTH Specification Clause 1700 & 1600Each702.00
S-04/HOW TO USERAJASTHAN

How to use the Rajasthan Schedule of Rates

The basic schedule of rates sets the department's accepted rate for each item of work, and estimates for Rajasthan government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹1.00 per sqm to ₹1,09,947.00 per rmt, spanning 22 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A sqm rate applied to a rmt quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

ARCHED / ESTIMATING

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.