R/RAJASTHAN SOR 2025-26
Road Works: Pipe Culverts rates
16 road works: pipe culverts items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.
- Items
- 16
- Lowest rate
- ₹736.00
- Highest rate
- ₹15,711.00
- Effective from
- 2025-04-01
S-01/RATE ITEMS16 ITEMS
Road Works: Pipe Culverts rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹736.00 to ₹15,711.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. For reference only: verify against the official source before pricing a bid.
/
16 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| R-9.3(A) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row1200 mm dia | Rmt | 6,684.00 |
| R-9.3(B) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row1000 mm dia | Rmt | 4,643.00 |
| R-9.3(C) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row750 mm dia | Rmt | 3,298.00 |
| R-9.3(D) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row600 mm dia | Rmt | 1,941.00 |
| R-9.3(E) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row300 mm dia | Rmt | 736.00 |
| R-9.4(A) | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row1200 mm dia | Rmt | 7,828.00 |
| R-9.4(B) | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row1000 mm dia | Rmt | 5,420.00 |
| R-9.4(C) | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row750 mm dia | Rmt | 3,629.00 |
| R-9.5(A) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row1200 mm dia | Rmt | 13,402.00 |
| R-9.5(B) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row1000 mm dia | Rmt | 9,317.00 |
| R-9.5(C) | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row750 mm dia | Rmt | 6,595.00 |
| R-9.6(A) | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in Double Row1200 mm dia | Rmt | 15,711.00 |
| R-9.6(B) | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in Double Row1000 mm dia | Rmt | 10,873.00 |
| R-9.6(C) | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in Double Row750 mm dia | Rmt | 7,256.00 |
| R-9.7 | Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets as per Clause 2905500 mm dia | Rmt | 746.00 |
| R-9.8 | Laying Cement Concrete Pipe NP4 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets as per Clause 2905500 mm dia | Rmt | 1,111.00 |
S-02/SOURCE RECORD2025-26
- ISSUED BY
- Rajasthan PWD (Roads & Bridges)
- EFFECTIVE
- 2025-04-01
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS20 MORE
Other chapters in this schedule
- Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting24
- Road Works: Site Clearance62
- Road Works: Earthwork, Erosion Control and Drainage28
- Road Works: Granular Sub-Bases, Bases (Non-Bituminous) and Shoulders21
- Road Works: Bases and Surface Courses (Bituminous)13
- Road Works: Cement Concrete Pavement32
- Road Works: Traffic Signs, Markings and Other Road Appurtenances60
- Road Works: Foundation31
- Road Works: Substructure36
- Road Works: Superstructure32
- Road Works: Protection Works20
- Road Works: Maintenance of Roads28
ARCHED / ESTIMATING
Pricing road works: pipe culverts against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.