Rajasthan SOR 2025-26
Road Works: Bases and Surface Courses (Bituminous) rates
13 road works: bases and surface courses (bituminous) items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.
Road Works: Bases and Surface Courses (Bituminous) rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹9.60 to ₹6,613.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. Reference only — verify against the official source before pricing a bid.
13 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| R-5.1(i) | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | Sqm | 31.00 |
| R-5.1(ii) | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base (Stablised soil baes/Crusher Run Macadam) including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | Sqm | 39.00 |
| R-5.2(i) | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503 | Sqm | 9.60 |
| R-5.2(ii) | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503 | Sqm | 11.00 |
| R-5.2(iii) | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRTH Specification Clause 503 | Sqm | 12.00 |
| R-5.2(iv) | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 to 0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008 | Sqm | 14.75 |
| R-5.2(v) | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 to 0.45 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16- 2008 | Sqm | 17.60 |
| R-5.2(vi) | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 to 0.50 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008 | Sqm | 19.00 |
| R-5.3(i) | Bituminous MacadamBitumen (VG-10) | Cum | 6,449.00 |
| R-5.3(ii) | Bituminous MacadamBitumen (VG-30) | Cum | 6,613.00 |
| R-5.6(I) | Pre-coating ChipsBitumen (VG-10) | Cum | 1,025.00 |
| R-5.6(II) | Pre-coating ChipsBitumen (VG-30) | Cum | 1,050.00 |
| R-5.10(i) | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder using plastic waste Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing of aggregate and plastic waste cutting in a hotmix plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510. (Bitumen VG-30) (By mechnical means) Waste Plastic @ 8% of bitumen. Case - II By Mechanical MeansBitumen (VG-30) | Sqm | 137.00 |
Other chapters in this schedule
- Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting (24)
- Road Works: Site Clearance (62)
- Road Works: Earthwork, Erosion Control and Drainage (28)
- Road Works: Granular Sub-Bases, Bases (Non-Bituminous) and Shoulders (21)
- Road Works: Cement Concrete Pavement (32)
- Road Works: Pipe Culverts (16)
- Road Works: Traffic Signs, Markings and Other Road Appurtenances (60)
- Road Works: Foundation (31)
- Road Works: Substructure (36)
- Road Works: Superstructure (32)
- Road Works: Protection Works (20)
- Road Works: Maintenance of Roads (28)
- Road Works: Additional Items (101)
- Road Works: Additional Items (New) (307)
- Bridge Works: Earthwork for Bridges (17)
- Bridge Works: Foundation (85)
- Bridge Works: Substructure (38)
- Bridge Works: Super Structure (39)
- Bridge Works: Protective Works (8)
- Bridge Works: Repair and Rehabilitation (6)
Pricing road works: bases and surface courses (bituminous) against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works