Skip to main content

Rajasthan SOR 2025-26

Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting rates

24 road works: loading, unloading, carriage crushing of materials and setting items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.

Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹4.00 to ₹58,945.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. Reference only — verify against the official source before pricing a bid.

24 items — scroll the table to browse

DescriptionUnit
R-1.1(i)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 mCum44.00
R-1.1(ii)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansLoading of Earth, Sand, Moorum, Manure, Flyash by manual means including a lead upto 30 mCum22.00
R-1.1(iii)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansUnloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 mCum22.00
R-1.1(iv)Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansUnloading of Earth, Sand, Moorum, Manure, Flyash by manual means including a lead upto 30 mCum11.80
R-1.2(i)Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical MeansLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by mechanical means including a lead upto 30 mCum32.00
R-1.2(ii)Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical MeansLoading of Earth, Sand, Moorum, Manure, Flyash by mechanical means including a lead upto 30 mCum13.00
R-1.2(iii)Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical MeansUnloading of Earth, Sand, Lime, Moorum, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone for Masonry Work by mechanical meansCum4.00
R-1.4(i)Loading and Unloading of Cement by Manual MeansLoading of Cement by manual means including a lead upto 30 mTonne59.00
R-1.4(ii)Loading and Unloading of Cement by Manual MeansUnloading of Cement by manual means including a lead upto 30 mTonne59.00
R-1.5(i)Loading and Unloading of Structural Steel and Steel Bars by manual meansLoading of Structural Steel, Steel Bars by manual means including a lead upto 30 mTonne66.00
R-1.5(ii)Loading and Unloading of Structural Steel and Steel Bars by manual meansUnloading of Structural Steel, Steel Bars by manual means including a lead upto 30 mTonne66.00
R-1.6(i)Loading and Unloading of Bitumen Drums by Manual MeansLoading of Bitumen Drums by manual means including a lead upto 30 mTonne67.00
R-1.6(ii)Loading and Unloading of Bitumen Drums by Manual MeansUnloading of Bitumen Drums by Manual Means including a lead upto 30 mTonne59.00
R-1.7(i)Loading and Unloading of Timber by Manual MeansLoading of Timber by manual means including a lead upto 30 mTonne99.00
R-1.7(ii)Loading and Unloading of Timber by Manual MeansUnloading of Timber by manual means including a lead upto 30 mTonne99.00
R-1.8(i)Loading and Unloading of C.C. Blocks, Kerb, etcLoading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 mCum157.00
R-1.8(ii)Loading and Unloading of C.C. Blocks, Kerb, etcUnloading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 mCum157.00
R-1.11(i)Supply of Quarried stone and hand breakingSupply of quarried stone and hand breaking into coarse aggregate to Grading 1 (63 mm to 45 mm) as per Table 400-9 of MoRTH SpecificationsCum670.00
R-1.11(ii)Supply of Quarried stone and hand breakingSupply of quarried stone and hand breaking into coarse aggregate to Grading 2 (53 mm to 22.4 mm) as per Table 400-9 of MoRTH SpecificationsCum735.00
R-1.12Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve as per Table 400-13 of MoRTH SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through 53 mm sieve as per Table 400-13 of MoRTH Specifications including the cost of stoneCum505.00
R-1.13Crushing of Stone Aggregates 100 per cent passing through 26.5 mm sieve as per Table 500-21 of MoRTH SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through 26.5 mm sieve as per Table 500-21 of MoRTH Specifications including the cost of stoneCum510.00
R-1.14Crushing of Stone Aggregates Nominal Size 13 mm as per Table 500- 21 of MoRTH SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 13 mm nominal size as per Table 500-21 of MoRTH Specifications including the cost of stoneCum649.00
R-1.15Crushing of Stone Aggregates 10 mm Nominal Size as per Table 500-21 of MoRTH SpecificationsCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 10 mm nominal size as per Table 500-21 of MoRTH Specifications including the cost of stoneCum670.00
R-1.16Construction of reference bench mark (1 No.), working bench mark (4 Nos.) and near all drainage structures and bridges (as per direction of Engineer-in- charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete each pillar to be painted with with a unique identification no and directional information as per MoRTH specifications cl. 109KM58,945.00

Pricing road works: loading, unloading, carriage crushing of materials and setting against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works