Road Works: Protection Works rates
- Items
- 20
- Lowest rate
- ₹592.00
- Highest rate
- ₹4,723.00
- Effective from
- 2025-04-01
Road Works: Protection Works rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹592.00 to ₹4,723.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. For reference only: verify against the official source before pricing a bid.
20 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| R-14.1 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Clause 5.3.7.2 of IRC:89, no fragment weighing less than 25 kg laid dry complete as per drawing and MoRTH specifications Clause 2503.2 | Cum | 800.00 |
| R-14.2 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and MoRTH specifications Clause 2503.3 | Cum | 1,705.00 |
| R-14.3 | Providing and laying of apron with cement concrete blocks of size as per Clause 5.3.7.2 of IRC:89, cast-in-situ and made with nominal mix of M-15 grade cement concrete as per drawing and MoRTH specifications Clause 1700 & 2505 | Cum | 3,700.00 |
| R-14.4(A) | Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or Bethua) 75mm dia and closely packed & driven including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing brush wood as per drawing and Clause 6 of IRC:89Driven at least 900 mm below ground and 1200 mm above ground | Rmt | 684.00 |
| R-14.4(B) | Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or Bethua) 75mm dia and closely packed & driven including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing brush wood as per drawing and Clause 6 of IRC:89Driven at least 900 mm below ground and 900 mm above ground on average | Rmt | 592.00 |
| R-14.5(I) | Providing and laying pitching on slopes laid over prepared filter media as per drawing and MoRTH specifications Clause 2504.2.1Stone/Boulder | Cum | 800.00 |
| R-14.5(II)(a) | Providing and laying pitching on slopes laid over prepared filter media as per drawing and MoRTH specifications Clause 2504.2.1 Cement concrete blocks of size as per Table 1700.6 cast in cement concrete of grade M 15Concrete grade M 15 | Cum | 3,330.00 |
| R-14.5(III) | Providing and laying pitching on slopes laid over prepared filter media as per drawing and MoRTH specifications Clause 2504.2.1Brick pitchng set in cement mortar 1:4 | Cum | 3,965.00 |
| R-14.6 | Providing and laying filter material underneath pitching in slopes complete as per drawing and MoRTH specifications Clause 2504.2.2 | Cum | 734.00 |
| R-14.7(I) | Providing and laying flooring laid over cement concrete bedding complete as per drawing and MoRTH specification Clause 2505Rubble stone laid in cement mortar 1:3 | Cum | 3,260.00 |
| R-14.7(II) | Providing and laying flooring laid over cement concrete bedding complete as per drawing and MoRTH specification Clause 2505Cement conrete blocks grade M 15 | Cum | 3,663.00 |
| R-14.7(III) | Providing and laying flooring laid over cement concrete bedding complete as per drawing and MoRTH specification Clause 2505Brick on edge laid in cement mortar (1:3) | Cum | 4,723.00 |
| R-14.8 | Providing and laying of dry rubble flooring complete as per drawings and MoRTH specifications Clause 2506 | Cum | 1,530.00 |
| R-14.9(I) | Providing and laying curtain walls complete as per drawing and MoRTH specification Clause 2507Brick masonry in cement mortar (1:4) | Cum | 4,173.00 |
| R-14.9(II) | Providing and laying curtain walls complete as per drawing and MoRTH specification Clause 2507Coursed rubble masonary (2nd sort) in cement mortar (1:4) | Cum | 3,830.00 |
| R-14.9(III) | Providing and laying curtain walls complete as per drawing and MoRTH specification Clause 2507Cement concrete grade M 10 | Cum | 3,832.00 |
| R-14.10 | Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall | Cum | 814.00 |
| R-14.11(I) | Construction of toe walls for protection of slopes as per drawing and MoRTH specifications Clause 2507.1Random rubble masonry in case of stone pitching laid with cement mortar (1:5) | Cum | 3,352.00 |
| R-14.11(II) | Construction of toe walls for protection of slopes as per drawing and MoRTH specifications Clause 2507.1Brick masonry in cement mortar 1:4 in case of brick pitching | Cum | 4,092.00 |
| R-14.11(III) | Construction of toe walls for protection of slopes as per drawing and MoRTH specifications Clause 2507.1Cement concrete grade M 10 in case of concrete block pitching | Cum | 3,832.00 |
- ISSUED BY
- Rajasthan PWD (Roads & Bridges)
- EFFECTIVE
- 2025-04-01
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting24
- Road Works: Site Clearance62
- Road Works: Earthwork, Erosion Control and Drainage28
- Road Works: Granular Sub-Bases, Bases (Non-Bituminous) and Shoulders21
- Road Works: Bases and Surface Courses (Bituminous)13
- Road Works: Cement Concrete Pavement32
- Road Works: Pipe Culverts16
- Road Works: Traffic Signs, Markings and Other Road Appurtenances60
- Road Works: Foundation31
- Road Works: Substructure36
- Road Works: Superstructure32
- Road Works: Maintenance of Roads28
Pricing road works: protection works against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.