Skip to main content

Rajasthan SOR 2025-26

Bridge Works: Super Structure rates

39 bridge works: super structure items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.

Bridge Works: Super Structure rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹55.00 to ₹1,03,900.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. Reference only — verify against the official source before pricing a bid.

39 items — scroll the table to browse

DescriptionUnit
B-4.1.1Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 25 grade solid slab superstructureCum5,350.00
B-4.1.2Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 25 grade T-beam and slab superstructureCum5,500.00
B-4.1.3Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 25 grade box girder and balanced cantilever superstructureCum6,480.00
B-4.1.4Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 30 grade solid slab superstructureCum5,500.00
B-4.1.5Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 30 grade T-beam and slab superstructureCum5,700.00
B-4.1.6Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 30 grade box girder and balanced cantilever superstructureCum6,600.00
B-4.1.7Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 35 grade solid slab superstructureCum5,600.00
B-4.1.8Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 35 grade T-beam and slab superstructureCum5,920.00
B-4.1.9Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 35 grade box girder and balanced cantilever superstructureCum6,700.00
B-4.1.10Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 40 grade solid slab superstructureCum6,450.00
B-4.1.11Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 40 grade T-beam and slab superstructureCum6,860.00
B-4.1.12Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700M 40 grade box girder and balanced cantilever superstructureCum7,700.00
B-4.2.1Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M35 grade girder and slab superstructureCum6,450.00
B-4.2.2Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M35 grade box girder and balanced cantilever bridge superstructureCum7,580.00
B-4.2.3Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M 40 grade girder and slab superstructureCum7,200.00
B-4.2.4Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M 40 grade box girder and balanced cantilever bridge superstructureCum8,300.00
B-4.2.5Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M 45 grade girder and slab superstructureCum6,900.00
B-4.2.6Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M 45 grade box girder and balanced cantilever bridge superstructureCum7,900.00
B-4.2.7Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M50 grade girder and slab superstructureCum9,368.00
B-4.2.8Cement concrete for prestressed concrete in superstructre at any level with steel formwork and scaffolding complete as per drawing and technical specification as per MoRTH Specification: 1500 & 1700M50 grade box girder and balanced cantilever bridge superstructureCum10,773.00
B-4.3.1.1Providing and laying Steel reinforcement at any level in foundation complete as per drawing and technical Specification as per MoRTH Specification : Section: 1600 The structural steel to be used should be Primary Steel manufactured and approved by Engineering in chargedMild Steel reinforcementTonne1,01,200.00
B-4.3.1.2Providing and laying Steel reinforcement at any level in foundation complete as per drawing and technical Specification as per MoRTH Specification : Section: 1600 The structural steel to be used should be Primary Steel manufactured and approved by Engineering in chargedFE 415/500D HYSD Steel reinforcementTonne1,02,600.00
B-4.3.1.3Providing and laying Steel reinforcement at any level in foundation complete as per drawing and technical Specification as per MoRTH Specification : Section: 1600 The structural steel to be used should be Primary Steel manufactured and approved by Engineering in chargedTMT Steel reinforcementTonne1,03,900.00
B-4.3.2.1Providing and laying Steel reinforcement at any level in foundation complete as per drawing and technical Specification as per MoRTH Specification : Section: 1600 The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in chargedMild Steel reinforcementTonne92,000.00
B-4.3.2.2Providing and laying Steel reinforcement at any level in foundation complete as per drawing and technical Specification as per MoRTH Specification : Section: 1600 The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in chargedFE 415/500D HYSD Steel reinforcementTonne93,300.00
B-4.3.3.3Providing and laying Steel reinforcement at any level in foundation complete as per drawing and technical Specification as per MoRTH Specification : Section: 1600 The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in chargedTMT Steel reinforcementTonne94,500.00
B-4.4Providing and laying High tensile steel wires/ strands at any level including all accessories for stressing, stressing operations and grouting complete as per drawing and technical specification as per MoRTH Specification 1800Tonne95,000.00
B-4.5Reinforced cement concrete wearing coat M30 grade at any level including formwork and reinforcement complete as per drawing and technical specification as per MoRTH Specification 2202, 1500 &1700Cum6,920.00
B-4.6Providing and laying 25mm thick bitumen mastic wearing coat with bitumen of grade S 35 as per Table 500-27, 15% by weight on prepared base including the coarse aggregate as per table 500-29, and lime stone powder as filler, complete including tack coat as per MoRTH specification : clause 515Sqm720.00
B-4.7Providing and laying reinfored Cement Concrete grade M30 design mix railing complete as per drawing and technical specification as per MoRTH Specification :1500, 1600 & 1700Metre1,210.00
B-4.8Providing and fixing Mild steel railing, galvanised or painted, complete as per drawing and technical specification as per MoRTH Specification : 1900 & 2703Metre1,420.00
B-4.9"Fabrication, Welding, Riveting, olting by HSFG bolts wherever required, supply, transportation to site, Assembling, Launching, Erecting of steel girder spans as per drawings and specifications approved by Railway and department for composite construction i.e. (Steel +RCC) of superstructure of the Road Over Bridge with contractor's own mild steel confirming to IS: 2062 Grade 350(E) with all welds, rivets, nuts bolts rivet materials, weld materials, HSFG bolts, service bolts, with other ancillary steel structures fixed to the girder where necessary in proper level and alignment and as per technical specifications. etc. with contractor's own materials, fabrication, machinery, templates, fixtures, equipments tools and plants, transportation to site, skilled/ unskilled labour, excise duty., Octroi, sales tax and other taxes, all leads and lifts, descent, loading, unloading, crossing one or more Railway track if required etc. complete and as per technical specifications. The rate shall also be inclusive of cold straightening of deformed and bent girder parts before their assembly. The structural steel to be used should be manufactured by SAIL/ RINL/ TISCO/ ESSAR/ JINDAL only. For Painting prior approval for superior brand/ make of the paint should be taken from engineer in charge. "The rate shall be inclusive of supply, erection and dismantling of staging and scaffolding and other temporary arrangements required for the purpose of assembly, erection and launching of girders. The rate shall also be inclusive of cold straightening of deformed and bent girder parts before/after their assembly. "Metalising girder/ girder component such as cross girder, top chord channels, bracing etc of BG new steelKG180.45
B-4.11Designing, providing and erection of specified grade Precast RCC facia panels of thickness 180mm made with M-35 Grade concrete batching plant, transit mixer, concrete pump and vibrater for retaining earth with all elements and accessories including reinforcing element complete as per approved drawing and clause 3100 of MoRT&H specifications including all material, labour, machinery etc. (Scope of work includes designing, getting approval, casting in yard, curing, storing, transporting, lifting, placing in position, erection with all necessary fasteners etc complete)Sqm4,983.00
B-4.12Providing, placing and compacting to desired density approved backfill material in layers as per approved methodology including testing for reinforced fill portion and random fill portion in the approaches between the Reinforced Soil (RS) Wall panels as per approved drawings as per clause 3103 of MoRT&H specification The soil should be predominately coarse grained not more than 10% of particle should pass 75 micron sieve The item shall be measured and paid for the finished volume of backfill and sub-grade placed in position excluding the volume of filter media at base and behind the RS wallsCum380.00
B-4.14Casting,supplying and transporting upto Bridge site within 50m, pre cast RCC box, base slabs, blast retainer, bed block, etc. of reinforced concrete slabs in M-35 design mix etc.as per approved drawings & design with contractor's own materials such as sand water, 6mm to 20mm well graded machine crushed stone aggregate,admixures etc.including machine mixing of all gradients,placing,mechanical vibrating curing etc.and providing erecting and dismentaling of staging, centering,shuttering, form work,and providing AC/PVC pipes of approved sizes for weep holes/ drain pipes at spacing as decided by the Engineer -in-charge and handlingwith all lead, lift, depth ascent, doscent, octory, royalty and other texes, etc. including crossing of track, Nallaha, streams or any other obstruction, etc. complete as per instruction of Engineer-in-charge. Note : (i): Payment of steel used will be made seperately under relevant BSR item. (ii) the rates of items includes cost of mix design also.(iii)the rate of item includes the cost of cement alsoCum8,000.00
B-4.15Placement of precast reinforced cement concrete segmental box with the help of road crane at desired location carefully by lifting and pecking method during traffic and power block o with all contactor's labour, tools, material, cranes, machinery, preparation of surface as desired by Engineer including filling of joints by epoxy mortar, and laying of required sand including all material and labour tools, plants machinary, etc. with all lead and liftMT5,000.00
B-4.18Packing of stones ballast from exacting track. Screening loading up to 40 m and tracking at nominated area by making plot eighth all lead including contractors own tools, labour etc. complete. 8% shrinkage allowance shall be deducted from gross quantity. The removal of ballast shall be commenced with lifting of track under suitable speed restrictionCum55.00
B-4.19Providing boulders/stone backing 600 mm thick behind abutment/wing/return wall. Retaining wall/breast wall of bridges with stone not less than 15 KG (expect smaller stones to be used for filling up the voids) with all leads lifts ascents descents handling. crossing of nallahas, streams and all other obstructions all labour and materials as a complete job, as per railway specifications and as directed by the Engineer in charge. note - payment to be made on stack measured quantity of boulders/stones redacted by 15% to allow for looseness in stackingCum880.00
B-4.22Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all completeKG78.00

Pricing bridge works: super structure against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works